FUXIANG Tower Crane PT7023 (Flat-Top)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

 

 

Tower Cranes (Flat-Top)  

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting heightm

Lifting capacityt

Work rangem

Work rangem

Lifting capacityt

PT5510

6

12.7

55

1

40

PT7023

12

18.1

70

2.3

50

PT7528

18

16.8

75

2.8

60

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:How to explain and classify the types of tower cranes? What do QTZ80 and Q5510 mean?
This is only the tower crane in different periods of different naming:QTZ---- is the general saying in 80s of last century, Q means steel material (usually Q235), T is tower crane (mostly tower top type), Z indicates heightening method is self lifting,PT------ is the naming method in recent years.
Q:What are the construction cranes? 50
The most common are tower cranes, elevators, and freight lifts. The big construction enterprise also has the track type tower crane
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
How to choose tower crane in engineering:1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:How to fix the cable on the tower of QTZ125 type tower crane?
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Valuation, tower crane concrete foundation pouring and maintenance costs are included in the tower crane rental costs, not separately assessed.
Q:What is the difference between a tower crane QTZ31.5 and a QTZ40?
Lifting moment, arm length, elevation is not the same ah! Specifically, the maximum lifting weight of QTZ315 is 3 tons, the length of the arm is from 38-42 meters, the elevation is 27-28 meters; the maximum QTZ40 is 4 tons;
Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range