Full Certified Solar Panel | From China !!!

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
50 watt
Supply Capability:
4000 watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Poly-crystalline Solar Panel TSP255 
Created by 60 cells 

Quality and Safety

1. Rigorous quality control meets the highest international standards.

2. High-transmissivity low-iron tempered glass, strong aluminium frame.

 

Warranties

1. 10 years limited product warranty

2. 15 years at 90% of the minimal rated power output

 

Technical date :

ITEM NO.:

Poly 156*156 cell ,60pcs . Power range from 230Wp-260Wp

Maximum Power(W)

 230

235

240

245

250

 255

 260

Optimum Power Voltage(Vmp)

 29.4

29.5

29.7

30.1

30.3

 30.5

30.7

Optimum Operatige Current(Imp)

 7.83

7.97

8.08

8.14

8.25

 8.37

 8.48

Open Circuit Voltage(Voc)

 36.7

36.8

36.9

37.1

37.3

 37.5

 37.7

Short Circuit Current(Isc)

 8.52

8.59

8.62

8.65

8.69

8.73 

 8.78

Solar Cell:

156*156 Poly

Number of Cell(pcs)

6*10

Brand Name of Solar Cells

JA Cell, Bluesun Cell

Size of Module(mm)

1650*992*40/45/50

Cable & Connector Type

Pass the TUV Certificate

Frame(Material Corners,etc.)

Aluminium-alloy

Back sheet

TPT

Weight Per Piece(KG)

19.5KG

FF (%)

70-76%

Junction Box Type

Pass the TUV Certificate

Tolerance Wattage(e.g.+/-5%)

±3%, or 0-3%

Front Glass Thickness(mm)

3.2

Temperature Coefficients of Isc(%)

+0.04

Temperature Coefficients of Voc(%)

-0.38

Temperature Coefficients of Pm(%)

-0.47

Temperature Coefficients of Im(%)

+0.04

Temperature Coefficients of Vm(%)

-0.38

Temperature Range

 -40°C to +85°C

Surface Maximum Load Capacity

5400Pa

Allowable Hail Load

23m/s ,7.53g

Bypass Diode Rating(A)

12

Warranty

90% of 10 years, 80% of 25 years.

Standard Test Conditions

AM1.5   1000W/ 25 +/-2°C

Packing

 carton or pallet

1*20'

14 Pallets / 316pcs

1*40'STD

25 Pallets / 700pcs

Full Certified Solar Panel | From China !!!

Full Certified Solar Panel | From China !!!

Full Certified Solar Panel | From China !!!

Full Certified Solar Panel | From China !!!

Full Certified Solar Panel | From China !!!

Full Certified Solar Panel | From China !!!

Full Certified Solar Panel | From China !!!


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Ups how to pick up the battery pack?
It depends on your UPS battery pack with the UPS host does not match Do not turn it off.
Q:How do I calculate the number of UPS delay battery packs?
The three Radix 100AH batteries are configured for 600W equipment (100AH x 3 X 12V) / 600W X 0.7 = 4.2H (hours).
Q:Is the battery pack good for 18650 or the polymer?
When the temperature out of control, 18650 battery has a safety valve can be cut off from the battery inside the circuit.
Q:48v420a battery pack bad one, what impact on the battery?
General battery, in the case of normal use, the service life of about a year and a half, but also to use the more appropriate, there is no long-term high power put point, or loss of power situation.
Q:What is the voltage of the series battery pack?
(Different capacity) battery in series, its voltage is equal to the sum of the battery voltage, the current is the minimum capacity of the current value.
Q:How does UPS and battery pack fit?
C3KS must be connected to eight batteries, C6KS must be connected to 20 batteries.
Q:UPS battery pack maintenance time calculation?
Find the total power that the input needs to enter. High power UPS efficiency of 80%, total power = load power ÷ 80% = 6 (KW) ÷ 80% = 7.5 (KW)
Q:Three and 10 string battery pack What does it mean?
10 string is to put the three batteries together in a whole. Take 10 of these 3 and together with the battery to its positive and negative connected together so that it became a three and 10 string battery pack.
Q:What are the characteristics of the series and parallel battery packs?
After the battery series, the voltage is added, the current is equal, thus increasing the voltage.
Q:What about UPS and battery packs?
Know the delay time to calculate the battery specifications: load * delay time H / (coefficient 10.6 * a group of battery section) = 28000 * 0.5 / 32 * 10.6 = 41AH calculated the battery capacity, find a similar battery can be, this Configuration with a group of 32 38AH battery delay of about 30 minutes

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range