FRP Tower Design Reasonable Material Selection And Exact Structure Strength Calculation

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Design reasonable material selection and exact structure strength calculation based on the application industry and working condition of FRP tower. Characteristic: Lightweight, high strength, high corrosion resistant, high designability.


Scope of Application of the tanks

Design & fabrication of tower from us, enable the excellent property of FRP to play in a more overall, more reasonable, more effective way. At the beginning of design, we make scientific & reasonable material selection and exact structure strength calculation based on the application industry and working condition of FRP tower.

 

Product Advantages:

Corrosion resistance, anti-leakage, good weather resistance; GRP has a special corrosion resistant performance, when storage corrosive media, GRP shows the superiority that other materials cannot compare, can be resistant to various acid, alkali, salt and organic solvent; has excellent mechanical and physical properties; filament winding reduced the rate of micro cracks, equivalent fiber strength. Filament winding FRP product the fiber content can reach as high as 80%, strength was higher than steel, cast iron and plastic; thermal expansion coefficient roughly equivalent as steel, heat conduction coefficient only 0.5% of steel; long service life, low maintenance cost.

 

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing

High safety.

·    Professional Service

·    Competitive pricing

     Low purchase cost

 

FAQ:

Q1: How long about delivery time?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within 20 days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 20 to 30 workdays.

Q4: If we can produce some pipes according to customers request?

A4: Yes, we can produce tank to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, If needed,

FRP Tower Design Reasonable Material Selection And Exact Structure Strength Calculation

FRP Tower Design Reasonable Material Selection And Exact Structure Strength Calculation



 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is mobile energy? A new kind of energy? There is no actual product?
The new energy automobile production enterprises and products access management rules has been officially implemented in July 1, 2009, the "rules" stressed that: new energy vehicles refers to the use of non conventional vehicle fuel as a power source (or the use of conventional fuels, the new vehicle power device), power control and drive advanced technologies. Integrated vehicle, the formation of advanced technology principle, with the new technology and new structure of automobile. New energy vehicles, including hybrid vehicles, pure electric vehicles (BEV, including solar cars), fuel cell electric vehicle (FCEV), hydrogen engine vehicles and other new energy sources (such as high energy storage, two ether) cars and other categories of products.
Q:Total energy consumption and total energy production
Any of the two secondary energy products produced by the conversion of various energy sources (including other non - energy products and associated products)
Q:Coal washing products are primary energy, or the two energy?
Such as coal (coal), oil, natural gas, wind, water. Ocean energy, geothermal energy and nuclear fuel. The primary energy is converted into other forms of energy, such as coal gas, coke, electricity, steam and other petroleum products. It is called "the two energy source"
Q:The total amount of energy consumption (equal value)
Equivalent value is a measure of the energy of the unit itself
Q:What are the sources of energy that are common in life and the two energy sources
The energy product obtained after the primary energy is processed and converted is called the two energy source, such as electricity, diesel oil, gasoline, etc.
Q:At present, what are the main types of new energy vehicles?
What types of new energy vehicles?New energy vehicles, including fuel cell electric vehicle (FCEV), hybrid cars, hydrogen powered cars, pure electric vehicles (BEV, including solar cars) and other new energy (such as high energy storage, two cars of various types of products of ether).
Q:What is the energy consumption per unit product
(2) the individual energy consumption per unit product output refers to the amount of a certain amount of energy consumed in the production of a particular product. The index reflects the quantitative relationship between inputs and outputs. (3) the energy consumption per unit of comparable products refers to the total energy consumption per unit product of the same product in accordance with the standard process or standard product output under the same production conditions. Index Interpretation: this indicator reflects the level of production technology, product quality and management level of various industries and enterprises. It is the main index to evaluate the economic benefit and energy saving plan of the enterprise, and it is the important basis to formulate and modify the energy consumption quota and the product cost accounting. The characteristics of this index is, in the same industry between the various business units energy consumption comparable to eliminate similar between enterprises, because the product structure, production process, supply and demand structure caused by the different energy consumption are not comparable to the effect.
Q:What is the difference between energy star and DLC
Lighting products can provide Lighting facts label, Lighting Design Lab (LDL), Design Lights Consortium (DLC), FTC LabelBo Bo detection has a three color GMS-3000 distributed photometer system (15m*6m*6m), three color 1.5m thermostatic ball system, 2.0m integration ball system, 0.3m integration ball system, professional LM-80 aging test equipment. Light and safety (IEC/EN62471) test system for lamp and lamp system
Q:How to solve the energy problem
The increase of investment in science and technology energy, and actively develop new products for energy saving, develop clean and renewable energy, and on China's high energy consumption, waste of resources of industrial enterprises to accelerate the technological transformation and upgrading, and actively optimize the industrial structure, promote energy conservation, improve energy utilization rate.
Q:What is the difference between primary and secondary energy sources two
Primary energy can be further divided into two categories of renewable energy and non renewable energy. Renewable energy including solar energy, wind power, wind energy, biomass energy, wave energy, tidal energy, ocean thermal energy, etc.. They can be recycled in nature. Renewable energy, including: coal, crude oil, natural gas, oil shale, nuclear energy, etc., they can not be recycled, with a little, then a little less.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range