front log loader with ce made in China ZL50F machine manufacturer
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Use of the upper and lower hinge,turning radius is small,turned to a flexible,easy to operate.
2.Widely used in construction sites,mixing station feeding,brick,battle field,as well as mine,port cargo loading and short-distance transport.
3.Use of steel frame structure,increasing the overall strength.
4.Power-shift gear box ,universal good,stable and reliable.
5.Use of engine,power large,low fuel consumpution,good for environment.
6.Increasing the engineering machinery special drive axle,wheel-side planetary gear reducer,a strong ability to overcome obstacle.
Technical Specifications of ZL50F:
Company informaton:
FAQ:
1.How about the shipment?
Packaging Details: Nude packing,in container
Delivery Detail: 10-30 days after the deposit
2. What about your service?
Our quality ensurance time is 12 months. And our engineers can supply overseas service.
- Q:There is some road construction going on in my town and there are a couple of bulldozers and a road grader with a white pod attached to a long (6ft?) pole that is fixed to the blade. My best guess is that this is some sort of GPS device, but figured somebody here might now. Thanks!
- this is simply so the driver/operator can see where the blade is... otherwise he might trash someone's car, etc., see?
- Q:Two ash macadam base construction, leveling machine and bulldozer leveling method
- 4. certificate and test items to be collected(1) material certification should be collected: two ash crushed stone;(2) test test: compaction degree (sand filling method, irrigation method), two lime gravel, lime dosage, two ash crushed stone, unconfined compression. 5. mechanical and manual mechanical consumption type: dump trucks, bulldozers, loaders, graders, vibratory roller, roller, a sprinkler, a ton of mechanical consumption over two ash gravel is divided into two layers: when the bulldozer bottom 5000m2/ team, bulldozer grader 5000m2/ 3000m2/ top team, team roller, 5000m2/ stage, 5000m2/ stage loader, sprinkler pump 40t/. Artificial consumption: 3000 management personnel and technical personnel 2000 days m2/, m2/ days, the bottom two ash gravel 700m2/ days, the top two ash gravel engineering 300m2/ days. 6., quality assurance measures: two gray gravel should be consistent with the "urban road construction and quality acceptance specification" CJJ1-2008, 7.3 and 7.8.1 lime soil base permit. Allowable deviations conform to the provisions of the following table:7. safety measures:1) when the bulldozer, scraper and roller are in the process of shaping and rolling, the personnel keep a safe distance from the machine, so as to avoid bumping.2) construction of bulldozer and roller, facilities on the ground (cable, cable and other pipelines) and underground facilities (cable, cable, cable, telecommunications, gas, tap water and heating pipelines) to establish a clear mark, pay attention to the protection of various facilities, avoid scratching, touch, digging and other phenomena.3) technical personnel in the survey work to avoid the cable tower feet touch the ground, to prevent electric shock accidents.4) non mechanical equipment operators shall not operate on the aircraft.5) the construction of plastic surgery, to all personnel prepared masks and other labor insurance items, to avoid people suffering from respiratory diseases.
- Q:Are conservatives ruled by Satan? because they want to bulldoze everything God has made?
- Hey Spicoli Bulldozers are driven by UNION workers and UNION workers are democrats FAIL!!!!!!
- Q:Why is CPU than your bulldozer phenom
- Either because it's a low-end bulldozer, FX-4300, or because it's a secondhand bulldozer.
- Q:make sense?
- Sure, The wrong tool for a task.
- Q:jeff hardy vs. matt hardy vs. cm punk vs. hulk hogan vs. umaga vs. michael jackson in a hell in a cell match thats wraped in bardwire,
- Hulk Hogan? Pleez! I love the Hulkster, but Jeff Hardy would definatley win.
- Q:Is there any skill to drive a bulldozer?
- for example, see the front light upward immediately press the handle (blade sinking), front on the handle is readily sinking (rising blade).
- Q:What are the three differences between bulldozers, excavators and scrapers?
- A bulldozer is installed in the front of the tractor dozer blade loading for road construction machinery, bulldozing and smooth construction site.
- Q:I am building a budget gaming PC and I want to get a motherboard that can support the AMD FX quad core, six core, and eight core processors. But I don't want to spend too much money on a new motherboard AND a new processor. So I was wondering if the motherboards that use the new processors are backwards compatible with AM3 socket processors like Phenom II X6 or X4. Did I make this question too complicated? I hope not. Please and thank you for helping :)
- The FX Bulldozer processors require the AM3+ motherboards. Most (if not all) of the AM3+ motherboards are backwards compatible to use the AM3 processors. To be 100% sure that your AM3+ motherboard will support the AM3 processors, check the motherboard's web page and look under CPU support.
- Q:In a nasty fight between a T-rex and a Bulldozer, who would win and why you think so.?
- Bulldozer because everyone else is saying T-rex
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
front log loader with ce made in China ZL50F machine manufacturer
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords