Framework Transporter DCY200

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Framework transporter upload in dock 16


Rated load mass:200000kg

Dead mass:52000kg

Total mass:252000kg

Velocity:

No load,flat road12km/h

Full load,flat road 6km/h

Climbing slope ability with full load

Slope in the length direction 6%

Slope in the width direction 2%

Lifting stroke of platform:500mm

Platform dimension:12800mm(Length) 4000mm(Width)

Steering mode:Straight driving、Sideways driving、Transverse driving、Center steering、8-type steering、Swing steering


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Hanging basket operation 'Ten' is not allowed
5., not allowed to use the hanging basket in foggy weather, l 6. is not allowed in a basket across another basket for homework; 7., no hanging basket, sick homework;
Q:Why is the quad core six AMD FX series called bulldozer?
AMD bulldozer is a completely redesigned architecture, officially launched in October 2011, have a fever for high-end user, with DDR3-1866 native memory support, XOP instruction set, the modular design and a number of new features, fully replace the phenom processor of II seriesIn fact,
Q:Safety device for construction elevator
1. The governor To prevent the hanging basket construction elevator overspeed or fall and set up a safety device, is divided into a unidirectional and bidirectional type two kinds, the one-way speed limiter can only along the direction hoisting cage falling within the speed limit, two-way speed limiter can up and down along the hoisting cage speed effect on two directions. The speed limit shall be tested for performance in accordance with the prescribed time limit. 2. The buffer spring Buffer spring in spring seat connected to the base frame, so that when hanging cage fall accidents, reduce the impact of the hanging basket, at the same time ensure crane cage and weight drops landed into flexible contact, slow down the hoisting cage and the impact of weight landing. The buffer spring has a cone winding spring and a cylindrical spiral spring. Usually, there are two or three cone coiled springs or four cylindrical coils on the base of each cage.
Q:How are the baskets assembled?
The basket is the risk factor is high altitude operations, this basket production vendors so that Lida basket in the pre construction and installation must be careful when, in order to avoid what accident
Q:What are the differences and characteristics between a fully hydraulic bulldozer and a hydraulic bulldozer?
The main difference is that the power output is different:1. power transmission route of full hydraulic bulldozer: engine hydraulic pump hydraulic motor sprocket track.
Q:How much are the pile and Larson piles of a pile driver?
Would you like to ask the price of the material or the price of the construction?AskMaterial priceChasing the answerI mainly do Larson steel sheet pile products. Domestic 5000 or so, Japan imports 6450.
Q:What is the mechanical equipment of reinforced concrete construction
Let's go to gold and win the Internet, which is a professional industry e-commerce platform that sells all kinds of machinery
Q:What is the main composition of concrete pump
Concrete large transport equipment, for high-rise, high-speed, overpass and other large concrete concrete concrete work.
Q:The impact roller has high production efficiency
1. hourly compaction can be as high as 20000 square meters.2. average working speed is 10~15 kilometers per hour.
Q:What are the preparations for the piling site?
1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range