Frame Steel Scaffolding Rack CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FAS-DB

  • Surface: Galvanized

  • Material: High Strength Steel

  • Type: Diagonal Brace

  • Certification: CE

Frame Steel Scaffolding Rack   CNBM


Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-DB

Product Name: Scaffolding System--Cross Brace With Single Coupler 

3.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube,

    Specification(mm): 2000(H)x2070/2570/3070(W) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requiremen


 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:a scaffold that weighs 300n supports two painters. one of the painters weighs 250n and the other weighs 300n.?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
That it is what to do with it, for home improvement, then, in the end how much help? Need to pay attention to a few points:
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass o?
this could be a 2d concern. The moments approximately any factor interior the gadget would desire to stability, in the different case the gadget (scaffold) would rotate. additionally, the vertical forces would desire to stability, or the gadget (scaffold) would translate. it form of feels to me that to the superb from the middle of the scaffold it somewhat is a distance one 6th of the dimensions of the scaffold is comparable to saying 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any factor. i will evaluate the left facet of the scaffold, the place the 2d produced by the left rope is 0. comprehensive M = 0 = scaffold M + guy M + suited rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is considered a factor mass located at its center the strain F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign remedy for F. To get the strain in the different rope, you are able to basically evaluate the vertical forces interior the gadget. on the different hand, you should sum the moments approximately another factor (say, the superb rope). wish this permits.
Q:I need to know if these company is hiring scaffold builders Mobly Inc OKorder.com?
This company is hiring that company for those who buys them for that thing, from now and then!!
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent chute and independent chute are calculated by seat, the height of the same with the height of the outer scaffolding
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ​​the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
(Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
The responsibility system, policies, laws and regulations for the safe production of the production safety departments, and the actual development of the company's safety production, civilized construction and environmental management in line with the actual implementation of the company's safety production responsibility system
Q:Sprinkling water on the construction helps to help reduce haze days
Construction site environmental protection measures are as follows: First, the dust management

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range