Frame Sffolding System, Tubular Steel Frame Scaffolding ,H Frame Scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Set/Sets pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

  • Place of Origin: China (Mainland)

  • Model Number: SD1700/1930CGSP
  • Place of Origin: China (Mainland)

  • Type: Scaffolding Parts

  • Scaffolding Part Type: Scaffolding Props

  • Color: blue/green/red/brown

  • Height: 1700/1930mm

  • Steel Pipe Size: 25/42

  • Coated: Painted;Pre-Galvanized; Electro Galvanized

  • Material grade: Q195-Q235

  • Package: Bundles or in Bulk

  • Certification: ISO9001:2008

Packaging & Delivery

Packaging Details:1- Frame scaffolding system is packed in bundle and wrapped with iron bar . 2- Usually , one 40HQ container can load 300-600 set of props ,
Delivery Detail:40days

Frame Sffolding System, Tubular Steel Frame Scaffolding ,H Frame Scaffolding

Specifications

Frame scaffolding system is easy to assemble and dismantle which can help to save your time , energy and cost . 

 

Product Description

  tubular steel frame scaffolding

A- An adjustable steel prop including inner tube, Outer tube , prop nut ,prop pin , base plate and top plate

 

B- Adjustable steel prop can be adjusted to any length within its range which is convenient for using

 

C- Adjustable steel prop is easy to assemble and dismantle which can help to save your time , energy and cost .

 

D-We have several kinds of adjustable steel prop which are Middle East type adjustable steel prop , Spanish adjustable steel prop ,and Italian type adjustable steel prop . They are popular in Africa , South America , Middle east etc.

 

E-Adjustable steel prop is for supporting concrete slab , beam , timber and formwork which is strong and reliable for interior building construction .

 

F- we can weld the flat plate or the flower plate, or U-head plate , or fork plate at the top of the adjustable steel prop as your request .

tubular steel frame scaffolding

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Removal of deep foundation pit support
Wire saw more trouble, longer time. Static explosion, rope saw after the material transport is generally not broken crash and broken loading two, free choice
Q:Foundation pit steel support
Steel supported. This is ultimately determined by design.If you are designing the words, it is determined by your design.
Q:How to calculate the axial force of steel support in deep foundation pit
Calculation of axial force of steel support in deep foundation pit:The first plus zero, the calculation of a cable tension, the anchor cable tension is able to ensure the stability of the foundation pit resistance, and then on the basis of the times on the basis of the standard 70~95%.
Q:Is the calculation of the axial force of concrete support and steel support
There is no big difference between the calculation of the axial force of the concrete and steel support. There is a slight difference in the weight of the rod.
Q:The transformation of the old house can support it with channel beam below
According to the channel shape and can be divided into 4 kinds: cold bending equilateral channels, cold-formed non equilateral channel steel, cold rolled edge channels, the cold bending edge channelsIn accordance with the theory of steel structure, it should be the channel wing plate stress, that is, the channel should be standing, rather than lying.
Q:What are the safety measures of steel support construction
The construction site should be developed without disturbing measures, such as construction sites to Wai stalls closed, no dust pollution at night; prohibit the construction of unnecessary noise caused by the surrounding residents, in addition to continuous construction, general construction not more than 18 hours; the surrounding roads to set protective measures to keep the roads.
Q:How many tons of steel support
First -0.4m; -4.3 m; third -7.8m; -11.0 m; fifth -14.2 M. If you need to find Lee l3o first 83 student 7L counseling o9l4 search according to the above arrangement
Q:What are the characteristics of steel frame bracing system
Steel frame bracing system has the same characteristics. Should be in the steel structure after the heat will quickly lose strength and stability, steel structure of the fire is also a feature of heat.
Q:Embedded dislocation, steel support how to put? Metro Shield Construction
Estimates also corrected the past, relatively short, only to change the location of the bolt hole.
Q:Steel support is used in deep foundation pit
Large volume concrete (floor) set after pouring belt, according to the design drawings.CFG pile is a method of cement, fly ash and gravel to reinforce the foundation, and the bearing capacity of the composite foundation is not very high.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range