Frame Scaffolding Systems Formwork Bs Standard Scaffolding Tube With Low Price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 set
Supply Capability:
50000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Frame Scaffolding Systems Formwork Bs Standard Scaffolding Tube With Low Price

Developing with new technology materials, steel formworks is no longer a must in construction concrete process. More and more buildings are established with plastic formworks. And workers love this new formworks much more.

The advantages of plastic formworks:

1.First of all--light

Yes it is the first advantage of plastic formwork. It wins the great praise of both contractors and workers.

The biggest panel is 120×1500px,weights 10.5kg only. It can be lift and set up by one person easily, which means there is no need for cranes on site.Saves a lot of cost and time.

2.Easy set up

Different size of panels can firmly locked by simply turn the special handles to 90 degree. The Panels has rib on the back, which makes the system need not traditional wood blocks and nails. The panels have holes to fit tie rod, guarantee the strength of the whole system.

3.Modularity

Modular formworks composed by different size of panels,the main item is 120×1500px panel,which is used for the large area of walls and slabs. There are also small size of panels like 10×1500px,20×1500pxcm,25×1500px,inner corner 20×20×1500px and outer corner 10×5×1500px.Due to the variety of panel size, the system can form almost all size walls 120×1500px panel of multiply by 125px. The material of modular formwork is PC-ABS mixed with special glass fibers which enable panels to hold high pressures.

4.Strength

The handles are made by high strength Nilon, each panel locked by at least 4 handles, which makes the whole system strong enough to pour 1000px walls.

5.Environment friendly

The system needs no cut and nail due to the variety size. Also it needs nearly no wood. The material can be recycled after broken, so it will not pollute the environment.

6.Consequent

Concrete does not stick to plastic formwork, thus the panels need no oil before using, and can be cleaned simply by water. The surface of the wall which build by modular formwork is smooth and without rework.


Frame Scaffolding Systems Formwork Bs Standard Scaffolding Tube With Low Price

Frame Scaffolding Systems Formwork Bs Standard Scaffolding Tube With Low Price

Frame Scaffolding Systems Formwork Bs Standard Scaffolding Tube With Low Price


Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Stable and durable thanks to its structual design & automatic welding quality

* Customized solution helps you work safe, save cost and convenient

* Excellent quality for formwork & scaffolding with wide choices

 

Packing

in bulk or in bundle, or as requested

Shipping

   15-20 Days.

Normally small orders, it needs just 15-20 business days to the port. For goods with stock, it would be even shoter.

 

Other scaffolding & formwork products:

(1)   Scaffolding System:

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;

(2)   Scaffolding Frame & Accessories:

Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

(3)   Scaffolding Couplers/Clamps:

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

(4)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.


FAQ 

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The first floor frame structure, the building area of 715 square meters
Building template in accordance with 1220*2440 specifications, need 241. According to the construction experience of steel pipe vertical support 4.95M * 715 * 1.2 = 4247m
Q:When the span of the main girder in steel frame is large, it is necessary to arrange the secondary beam
The floor of the steel frame, the spacing of the secondary beam to the structure of the board material
Q:PKPM how to add lateral restraint steel frame
Hello,PKPM is not directly added to the argument, the landlord did not express clear
Q:European steel bed frame and rubber high density board that good
Wei density board has moisture-proof fire protection function, and is a green product. Good visitors, nature, Sophia and other big brands have to use!
Q:Channel steel frame does not bear the external load is how to place
Channel steel frame do not bear the external load, how to place according to the use of function to determine
Q:What are the requirements for the installation and the characteristics of the chimney sliding formwork
Safety: to have enough strength, stiffness and stability, to ensure that the construction of no deformation, no damage, no collapse
Q:What are the principles of the layout and spacing of steel structure engineering framework
Column layout, consideration should be given to the structure under vertical load internal force distribution is reasonable, the intensity of each component can make full use of materials. At the same time, we should try our best to facilitate and speed up the construction progress and reduce the construction cost.
Q:What are the types of reinforced concrete bridge construction template
6, other forms of templates (such as: sliding formwork, climbing formwork, flying mold, mold shell template, tire mold and permanent pressure plate template and a variety of reinforced concrete sheet template, etc.).
Q:In the construction process of reinforced concrete frame structure
Template construction inspection items: 1, the template and the layout and construction of the scaffold is in line with the special construction organization design (program) and safety measures;
Q:Stone curtain wall steel frame in the 90 degree angle of the horizontal frame connection
And then set the angle of the vertical keel on the corner of the intersection.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range