Frame Scaffolding System-Steel Catwalk CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FS-CW

  • Type: Scaffolding Parts, Wire mesh scaffolding plank

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Steel

  • Surface: Paint/electro- (hot dipped) galvanized or to be ordered

  • Load capacity: 300kg

  • Hook: 4 pieces

  • Frame Scaffolding System-Steel Catwalk CNBM

    2.Packaging & Delivery

Packaging Details:pallet

Delivery Detail:

3.Product Description

Model No: FAS-A

Model Name: Layher Aluminium Facade Scaffolding System

4.Features:

1. Made of high strength aluminium tube and pofile
2. Including: Assembly Frame, guardrail, diagonal brace, scaffolding deck, base plate, toe board etc.

3. With a few basic elements and a few basic operations, this FACADE SCAFFOLDING will provide you at lightning speed with a safe foundation for any job. It has been the leading frame scaffolding on the Europea market now, and with this unbeatably fast yet strong and safe system you can cope with almost every requirement. FACADE SCAFFOLDING can be used profitably both for scaffolding work and for building trades thanks to its versatile and well-thought-out parts range.

4. With only 6 basic elements, this classical Facade Scaffolding is assembled in no time at all. The system is extendable with lots of logical extension possibilities

5. Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the bamboo board for the scaffolding of the building?
Wooden foot Shouban, bamboo scaffold (including bamboo string board, bamboo fence board) Involving the scaffolding of the main norms are "construction fastener steel scaffold safety technical specifications" JGJ130- "construction scaffolding safety technical specifications" JGJ164-2008 and so on.
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
The scope of project supervision responsibility should mainly cover two aspects: one must involve the project itself, the site management is different from the project management, the former is the contractor's responsibility, the latter is the responsibility of the supervision interval, and the project itself has nothing to do with the responsibility of the accident , If the accountability of enterprises or supervisors is not based on the responsibility Such as temporary construction, temporary electricity, erection of scaffolding, loading and unloading of various building materials, on-site transport equipment, etc, does not constitute the project itself, so even if the accident occurred, should not be held accountable or supervisory staff responsibility Second, it must involve the quality of the project, because the owner is the first person responsible for the quality of the project, the project supervision enterprises as a social intermediary service organization, its power, responsibility and obligation is derived by the owner commissioned by any supervision business can not exceed the owner commissioned Responsibilities and new powers and obligations Therefore, the supervision of enterprises not only to bear the corresponding responsibility for the quality of the accident, but also due to the quality of the accident caused by accidents, including accidents, including other accidents
Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
That is, the upper and lower with a pump on the 90-degree bend, the two of them with the root 1 m straight tube connected to each other, and the other round steel to do two large diameter 18 meters, and then some straight round 2 large circle made of a hoop, and then the two straight with elbow straight fixed Below the elbow tow pump up the pump tube, the top elbow root 2 m straight tube It can be in the range of 4 meters to rotate the fabric, such as to move the car can be used in place
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
Q:How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:How long do you have to wait before you can take a scaffolding piercing out for short periods of time?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
The responsibility system, policies, laws and regulations for the safe production of the production safety departments, and the actual development of the company's safety production, civilized construction and environmental management in line with the actual implementation of the company's safety production responsibility system
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
Q:Why the height increase of ten centimeters increase in housing ten percent
Increase the cost of ten centimeters increase in housing costs by about three percent

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range