Frame Scaffolding System, Scaffolding Drop Forged Couplers ,H Frame Scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Set/Sets pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

  • Place of Origin: Tianjin, China (Mainland)

  • Model Number: SD1700/1930CGSP
  • Place of Origin: China (Mainland)

  • Type: Scaffolding Parts

  • Scaffolding Part Type: Scaffolding Props

  • Color: blue/green/red/brown

  • Height: 1700/1930mm

  • Steel Pipe Size: 25/42

  • Coated: Painted;Pre-Galvanized; Electro Galvanized

  • Material grade: Q195-Q235

  • Package: Bundles or in Bulk

  • Certification: ISO9001:2008

Packaging & Delivery

Packaging Details:1- Frame scaffolding system is packed in bundle and wrapped with iron bar . 2- Usually , one 40HQ container can load 300-600 set of props ,
Delivery Detail:40days

Specifications

Frame scaffolding system is easy to assemble and dismantle which can help to save your time , energy and cost . 

 

Product Description

  scaffolding drop forged couplers

A- An adjustable steel prop including inner tube, Outer tube , prop nut ,prop pin , base plate and top plate

 

B- Adjustable steel prop can be adjusted to any length within its range which is convenient for using

 

C- Adjustable steel prop is easy to assemble and dismantle which can help to save your time , energy and cost .

 

D-We have several kinds of adjustable steel prop which are Middle East type adjustable steel prop , Spanish adjustable steel prop ,and Italian type adjustable steel prop . They are popular in Africa , South America , Middle east etc.

 

E-Adjustable steel prop is for supporting concrete slab , beam , timber and formwork which is strong and reliable for interior building construction .

 

F- we can weld the flat plate or the flower plate, or U-head plate , or fork plate at the top of the adjustable steel prop as your request .

scaffolding drop forged couplers

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Steel support can stay in the wall joint position, if not, then why?
Note: the I-beam is and even steel cage wall welded together, lifting and reinforcement cage is synchronous lifting installation, when pouring concrete, concrete and steel reinforcement cage are I-beam wrapped inside, while under load
Q:Removal of deep foundation pit support
Wire saw cutting is still relatively fast, the key is to be able to put large crane! Can not say that can not stand! Static explosion is not recommended for the duration of the project, slag trouble! You can spot cutting up digging machine broken on the best!
Q:Steel support, mixed soil support, calculation method?
Flexible support according to the direction of points, there are horizontal support, vertical support, oblique support......
Q:How much is the glass floor cost. That's the kind of steel frame
The use of the environment, load-bearing, non slip performance, steel selection, etc.,
Q:Subway construction of steel support needs qualification
From a professional point of view, the difference between light rail and subway, is not in heaven and earth, but in the heavy rail and the maximum cross section passenger flow: Rail weight per meter 60 kg per hour, 15 thousand passengers to 30 thousand passengers called light rail; rail weight per meter 60 kilograms, call the subway traffic per hour to 30 thousand 60 thousand passengers.
Q:What is the steel plate support
The steel pipe support system comprises a support rod system and a subsidiary component part, wherein the supporting rod system comprises a main rod, a movable end and a fixed end
Q:The construction scheme of the steel pipe support frame
This Lida electric basket installation method:(1) the plug rod is inserted into the front bracket casing triangle, according to the parapet height, the height of the bars inserted in the regulation of the range of 1.15-1.75 m, fixed with bolts, complete the front seat installation.(2) insert the inserting rod into the rear bracket, the height of the inserting rod is high, and the inserting rod of the front bracket is high.(3) the front and rear beams are respectively arranged before and after stent insertion within the casing, with the beam to the front and rear beams set, and according to the situation before the selected beamThe distance between the front bracket and the rear bracket should be placed to the maximum, and the upper bracket is placed on the front seat of the inserting rod sleeve. The small connecting sleeve is sheathed on the inserting rod sleeve of the rear bracket and is fixed by bolts.(4) whether or not the installation, the suspension mechanism must meet the anti overturning.
Q:Why subway steel support axial force value
Calculation of axial force of steel support in deep foundation pit:The first plus zero, the calculation of a cable tension, the anchor cable tension is able to ensure the stability of the foundation pit resistance, and then on the basis of the times on the basis of the standard 70~95%.Preload is generally not more than 450kN, because of the use of pile anchor structure is mostly sand, silt, or clay, anti pulling force of this stratum and anchor is limited, 450kN means that the prestressing design tension reaches 450/0.95~450/0.7, which is basically the ultimate anchor in this ordinary formation, if not met to consider the encryption of anchor spacing.
Q:How many tons of steel support
(2) the second layer is mainly used for long arm excavator excavation, excavation to the ground under 4.8m and 8.3m, erection of the second, 3 support. (3) third, four layer earth most of the small excavator excavation and artificial excavation, unearthed on both sides of the dump truck crane, transportation, excavation to the ground under the 11.5m and 14.7m, set up fourth, 5 support. (4) when the excavation to the base 200mm, from the artificial bottom excavation to the design elevation, to prevent over excavation.
Q:How to choose H steel support
But also consider the impact of dynamic load (or static load is not stated)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range