Frame Scaffolding System, Hot Dip Galvanize Cuplock Scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Frame Scaffolding System, Hot Dip Galvanize Cuplock Scaffolding


Quick Details

Place of Origin:

Tianjin China (Mainland)

Brand Name:

rrzt

Model Number:

6082

Material::

Aluminium Alloy 6082-T6

color::

orange, blue, red, grey or gree

Certi::

ISO,SGS BV CE

inspection::

factory in-house, 3rd pary

delivery time::

7-30 days as per order quantity

Payment terms::

L/C, T/T, D/P, D/A, etc

No welding scaffolding::

Weld free tubular design

Featrues::

flexible,High stiffness and resi

Business type::

manufacturer

Packaging & Delivery

Packaging Detail:

solid iron case or anti-suffocating wooden case

Delivery Detail:

within 30 days after upon order and deposit


Specifications

1.competitive price 
2.Best quality 
3.Fast delivery 
4.Factory offer 
5.Free sample

Other information:

Gate Scaffolding for Construction 

High quality, most competitive price 
Safe & durable 
Large sales quantity 
ISO9001

Frame Scaffolding System, Hot Dip Galvanize Cuplock Scaffolding


FAQ:

Why Us?

We are one of the Top 500 companies in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The bowl locking conditions of scaffolding, to determine what,
Now the general approach is to use artificial eye detection
Q:Scaffolding piercing?
Vist the store you got it and tell them instead of us
Q:Should I get a scaffold piercing or a second piercing on each ear lobe?
They are near impossible to get rid of and may never stop growing.
Q:Attached to the lifting scaffolding installation site how to write
All threaded connections nuts have been tightened.It should be removed from the live construction load have been evacuated after.
Q:The Scarlet Letter scaffold scenes?
concentration your interest on who's on the scaffold, how they react to the standard public shaming, and what the reader learns with regard to the character from analyzing the define of them on the scaffold.
Q:What is the difference between the bowl buckle steel tube scaffold and the steel pipe scaffold
(3) the use of strong: the main components are the use of ordinary fastener type steel pipe scaffolding, steel pipe can be used to connect fasteners, universal.(4) the bearing capacity is large: the vertical rod connection is a coaxial core socket, and the cross bar is connected with the vertical rod by a bowl buckle joint. And the axial line of each member is placed at one point, and the node is in the plane of the frame. (the entire frame bearing capacity, about the same clear fastener type steel tube scaffold condition is improved by more than 15%,)
Q:Does getting scaffolding hurt?
That's also called an industrial... not any more painful then another cartilage piercing...but the healing time is usually longer.. expect soreness for 3 months to a year after you get it...
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 295 N scaffold supported by two cables attached to its?
Rainwater forgot about the weight of plank itself... So: (0.5 m)×(910 N) + (1 m)×(500 N) + (1.5 m)×(295 N) + (2 m)×(730 N) = (3 m)× T₁ T₁ = 952.5 N (1 m)×(730 N) + (1.5 m)×(295 N) + (2 m)×(500 N) + (2.5 m)×(910 N) = (3 m)× T₂ T₂ = 1482.5 N Check: (952.5 N) + (1482.5 N) ?=? (730 N) + (295 N) + (500 N) + (910 N) (2435 N) !=! (2435 N) Seems OK ;-)
Q:I want to get and industrial/scaffold, but...?
im think' in it can happen
Q:Wheel buckle scaffolding rental price
3, according to the vertical pole lease (cross bar is not included), each pole 0.1~0.15 yuan / root / day. 4, according to the lease, 7~8 yuan / square. Time (time). The above is the reference price, the specific market prevail.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range