formwork tie rod quantity

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)
Brand Name:
OEM
Model Number:
15/17
specs:
15/17
material:
Q235/45#
process:
thread rolling
breaking load:
min145KN
Weight:
1.5kg/m
Length:
1-6m
Packing:
in bulk or in bundle
MOQ:
10 Mtons

Packaging & Delivery

Packaging Detail:in bulk,in bundle or in pallet
Delivery Detail:20 days

Specifications

formwork tie rod
cold rolled full thread/weldable
specs:10/12 15/17 20/22
material:Q235/45#

formwork tie rod,formwork system tie rod

cold rolled full thread weldable

Advance thread rolling process ensures stably superior quality,prompt delivery is guaranteed by virtue of high productivity.

Specs:10/12,15/17,20/22

Material:carbon steel Q235/45#

Breaking load:min 140KN for 15/17(based on material)

Surface:black or galvanized

Weight:1.5kg/m

Length:1m-6m,customizable

MOQ:10 Mtons

Welcome to contact to get the latest prices.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Latch type disc scaffolding accessories is a national patent product
Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
Q:A painter and a scaffold?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
Because those guys are not talented at all and cause a lot of trouble for WWE and all the big names televised.
Q:Standard Specification for bowl buckle scaffold
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q:What are the common rules for calculating the amount of scaffolding works
According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q:Should I get a Scaffold piercing and hide it from my parents?
dont do it. when your parents say grounded, you may be let off easy but if is about your body then if you get it your in deep ****. also your parents could see this question and then you would be in even more trouble. please dont get it. also things like that are really hard to hide from parents. if your 18 years or older llegally they cant stop you from doing it. i dont think you should do it.
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Foundation engineering:Square - hole excavation pile - pile - reinforced concrete beam - based backfill. Pile by manual drilling, artificial trolley, concentrated heap of residual soil, automobile Sinotrans earthwork project, the allowable deviation of hole diameter of pile are as follows: 800cm, vertical aperture offset, 10cm < 1%, along the axis, vertical axis direction 7cm.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range