Formwork Steel Props Scaffolding System with low price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m.t
Supply Capability:
1000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Formwork Steel Props Scaffolding System with low price

Product pictures:

Formwork Steel Props Scaffolding System with low price


Formwork Steel Props Scaffolding System with low price

Formwork Steel Props Scaffolding System with low price

Product description:

Name:

RingLock Scaffold System

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be   manufactured according to your standards.

Advantage

* Customized solution helps you work safe, save cost and convenient

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System:


(2)   Scaffolding Frame & Accessories:


(3)   Scaffolding Couplers/Clamps:


(4)   Formwork System Scaffolding & Accessories:


FAQ

Why Us?

We are one of the largest construction materials suppliers in China.

Excellent products with competitive prices.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
So do the project budget review work, will help improve the design level and investment efficiency
Q:Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
In the late 1950s, oil wells were specially developed for oil
Q:What is the vertical transport of construction and the high increase in fees
In the contract of the project, the construction unit is paid a fee for the construction unit
Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks
Q:What is the bamboo board for the scaffolding of the building?
Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG Construction site commonly used scaffold with stamping steel foot Shouban.
Q:The name of the laws and regulations relating to the building, at least 100, The The
Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass o?
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Q:71.0-kg painter is on a uniform 22.0-kg scaffold supported from above by ropes. How close to the left can he approach safely?
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ◄ (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ◄ Hope this helps!
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range