Formwork Steel Props Scaffolding Parts New Design
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 9 m.t
- Supply Capability:
- 1000 m.t/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
New Design Formwork Steel Props Scaffolding System Formwork System Formwork Parts
Product pictures:
Product description:
Name: | RingLock Scaffold System |
Category: | Scaffolding System |
Material: | Steel (Q235/Q345) |
Size: | D48*3.25mm, etc |
Surface: | Electro Galvanized, Hot Dipped Galvanized, Painted, Powder Coated |
Component: | Standard, Ledger, Diagonal Brace, Bracket, Base Jack, U Head Jack, Etc. |
Application: | Slab Support, Staircase, Stage Plateforms, Bridge Support, Mobile Tower, etc. |
Manufacturer: | OEM is Available |
Items or goods can be manufactured according to your standards. |
Advantage
* Customized solution helps you work safe, save cost and convenient
* Excellent quality for formwork & scaffolding with wide choices
Other scaffolding & formwork products:
(1) Scaffolding System
Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Haki Scaffolding System and accessories;
(2) Scaffolding Frame & Accessories
Including Walk Through Frame Scaffolding;Accessories; we also can make scaffolding according to your samples or drawings.
(3) Scaffolding Couplers/Clamps
We can produce all kinds of forged and pressed couplers, including British type couplers. We also can produce according to your drawings or samples.
(4) Formwork System Scaffolding & Accessories
Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.
FAQ
Why choose Us?
We are one of the largest construction materials suppliers in China.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Other questions:
Q: Samples?
Sample free, customer pay freight first time.
Q: Delivery?
10-30days according to the order qty.
Q: Payment?
T/T L/C at sight
- Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
- the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures
- Q:The obvious would be helpful too!
- Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
- Q:What kind of insulation materials and equipment are allowed to be imported in China?
- What kind of insulation materials and equipment are allowed to be imported in China?
- Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
- Q:What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
- Template support and scaffolding are force components can be wood structure, steel structure and prefabricated concrete structure, which is classified according to their use of the general should not share the same structure, so as to avoid the operation of the construction process caused by the template shaking and affect the quality of the project The In general, the template support is through the template to bear the relevant load from the concrete; and scaffolding to bear the construction workers, equipment and construction materials and other loads
- Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
- Q:- Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
- In the late 1950s, oil wells were specially developed for oil
- Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
- Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
- Q:How to do a good job of typhoon during the mass transfer mobilization work
- Such as: all kinds of dangerous housing, plant, shed, temporary buildings (such as walls, etc
- Q:What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Formwork Steel Props Scaffolding Parts New Design
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 9 m.t
- Supply Capability:
- 1000 m.t/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords