Formwork Parts Washer Plate made by Pressing

Ref Price:
$0.95 / kg
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure ofFormwork Parts pressed washer plate:

It is Formwork Parts Formwork Parts pressed washer plate with material Q235

Packaging & Delivery

Packaging   Details:

cartons/pallets or customized

Delivery   Detail:

25-40   days


2. Formwork Parts pressed washer plate Products pictures:


Formwork Parts Washer Plate made by Pressing

Formwork Parts Washer Plate made by Pressing

 

3. Formwork parts Cone Specification:

Made by pressing with material Steel Q235

1) Surface: galvanizing

2)Weight: 0.51~1.1KG
3) Samples are available


4.FAQ

 We have organized several common questions for our clients, may help you sincerely:

1) How is the Packaging Details?

In bags or as the requirement of customers.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The relevant provisions of the demolition of the external wall scaffold:
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q:does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.
Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
3, Pankou scaffolding load intensity up to 200KN capacity4, Pankou scaffolding scaffolding activities. Abandon the traditional parts easily lost, easily damaged, and compared with the ordinary bowl-scaffold, saving up to 2/3 more than the amount of steel, so to a certain extent, greatly shorten the construction unit cost and economic loss.
Q:New features of quick dismantling scaffolding?
Material: the main keel is made of cold rolled steel with 2mm thickness
Q:On what page of The Scarlet Letter does Hester enter the scaffold?
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:The construction should strengthen the specific meaning of scaffolding and support
At the present stage Chinese people-oriented, building a harmonious society, especially the importance of safety in production site, in addition to constantly modify the security specifications and technical documents issued by a variety of real-time safety, strengthen safety measures, compulsory accident insurance and so on. JGJ130-2011 is the new version of the construction of steel tubular scaffolding safety technical specifications should be strengthened scaffolding construction management. The current JGJ162-2008 is the safety technical specification for the construction of fastener type steel pipe formwork support.
Q:Scarlet Letter: Why does Hester keep her promise to Chillingworth on the scaffold?
Because she owes him since she cheated on him.
Q:what is scaffolding in early childhood?
Maybe this will help: scaffolding is the support provided by adults working with a child to help promote and extend development of knowledge and skills. It can mean asking appropriate questions to help extend a child's thought process, or providing suitable activities to help a child learn through hands-on activities. Look it up in your textbook and read the definition and apply it to my explanation above for a deeper understanding, and don't be afraid to ask your instructor questions like this! That's what s/he is there for!
Q:is my scaffolding piercing infected/?
Normally if there is an infection it is very very sore, red, warm to the touch, and secretes yellow or green pus. It sounds like you might also be possibly forming a keloid, but most likely it is just irritated. Continue with your sea salt soaks (hopefully thats what your doing) and go down to your piercer and have them check it out if you get too worried about it.
Q:industrial/scaffold piercing question?
trust me, bro. bad idea. industrials are very tempermental at best. your helmet will cause every problem possible. any descent piercer would tell you the same. don't do it. they take up to a year to heal soif you really want one, quit football or wait til you're out of school.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range