Forged Scaffolding clamp Girder Coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
SD-3020
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
Material:
Q235
Weight:
1.60kg
Diameter:
48.30mm
Surface:
Electroplate/HDG
Technics:
Forged
Standard:
EN74BS1139
OEM service:
Available

Packaging & Delivery

Packaging Detail:Packed with bags+steel pallet or bags+plywood pallet or as your required
Delivery Detail:20-45days

Specifications

Forged Scaffolding clamp Girder Swivel Coupler
Material: Q235
Weight: 1.60kg
Dia: 48.30mm

Item

 Forged Scaffolding clamp Girder Swivel Coupler

Item NO.SD-3020

Material

Q235

Surface

Electroplate/HDG

Size

48.30mm
weight

1.60kg

Port

Qingdao

Payment

L/C,T/T  We can contact in detail

ShipmentFOB,CIF,EXW
Package steel pallets or as required
DeliveryDetail 20-45days
 Standard  EN74,BS1139



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is rolling scaffolding?
Scaffolding that utilizes rollers that are attached to the bottom section of scaffolding.
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m
Q:Should i rotate my scaffolding piercing?
you dont need to rotate a scaffolding piercing because its in such a place that it will rotate on its own throughout the day/night
Q:Standard Specification for bowl buckle scaffold
A new type of scaffold developed in China
Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
Cantilever scaffold cantilever beam fixed method is as follows:1, the floor in the rebar at the same time, the embedded two door shaped clamp, each clamping hoop is composed of 2 14mm grade steel made a root diameter, the first door shaped clamp from the wall 450mm, second door shaped clamp from the other end of the 350mm, the door shaped card hook stirrup slab reinforcement, to meet the requirements of the anchorage the cantilever beam, door shaped clamp is inserted in the middle, but also with a fixed electric welding.
Q:What are the functions and requirements of the masonry wall
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:Erection of steel scaffolding tools and safety supplies
Wrench, hammer, wrench, short scaffolding level and a folding rule
Q:How much more painful is the scaffold/industrial piercing opposed to a normal cartilage piercing?
once you get it pierced do no longer stressful up bc its going to harm like 10 situations extra. stay comfortable and actual do now not sleep on it in view which you will awaken day after today with a swollen ear and in discomfort. sparkling it thrice an afternoon for 12 weeks. And basically a reminder cartilage piercings do take a together as to heal. Mine took a pair of 365 days in a a million/2 to absolutely heal. meaning the place i became into waiting to sleep on it and not harm.the place i became into waiting to pass it around without it getting contaminated minutes later. you may haven't any problem with it as long as you're looking after it =) And from a a million to 10 i say its between a 7 and eight once you get it pierced bc it does throb after.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range