Forged Coupler British Type for Sale in China

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Forged Coupler British Type for Sale


Description


1.The scaffolding coupler is always used to connect the steel pipe as scaffolding system.

2.The often used coupler is swivel coupler and righ angle coupler .

3.We can provide types of scaffolding coupler according to your requirement.

4.Couoler can fix the 48.3mm scaffolding steel pipe tightly and make the whole scaffolding system more steadily.

5.Material:Q235 steel

6.Overall Size:48.3mm*48.3mm

7.Surface Finish: Galvanized/ Painted

8.Standard:BS1139,EN74

9.Package:25pcs/bag

10.Manufactuering as per customer requirements

Forged Coupler British Type for Sale in China


Feature


(1)Excellent Anti-Breaking—Cold Pressed Steel

(2)Outstanding Resistance Deformation

(3)Strong Anti-Dropping Ability

(4)Longtime USe

(5)Qualtity Guaranteed

(6)OEM Service



Photo


Forged Coupler British Type for Sale in China

Forged Coupler British Type for Sale in China

Forged Coupler British Type for Sale in China

Parameter



MaterialQ235,345steel
Size48.3mm*48.3mm
Surface finishGalvanized
Weight1.1kg around
StandardBS1139,EN74
Package25pcs/bag,steel pallet
Manufacture
As per customer requirement
MarketAfrica, South America, the Middle East and Asia



FAQ


Q: Are you a factory or trading company?    

We are a state-owned corporation in China,dealing with various kinds of building materials.We have our holding subsidiaries.

Q: Where is your factory located? How can I visit there?    

Our factory is located all around China.

Q: Can I get some samples?    

Sample is free, customer only pay freight for the first time. 

Q: Delivery?

10-30days. (5-15 containers)



Any question,feel free to contact us.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the minimum spacing between the crossbar and the pole spacing of the scaffold?
Send a mail to you, but whether you can give the best answer, huh, huh
Q:What is the song used in the Geico business meeting commercial, the one with the money on the scaffold?
It was an old 80's song - Somebody's watching me - Rockwell
Q:Single-row fastener type steel pipe scaffold for decoration works in the construction of small horizontal bar spacing should be the number of mm.................................
With a steel pipe or wood under the support of the template on it. Take me oh
Q:Who can give a calculation of the amount of scaffolding, and now offer the market!
The scaffolding and building structural engineering link to ensure that the overall stability of the scaffolding and the use of security
Q:How much is a Scaffold piercing in Ireland?
I suspect it varies depending on where you go to get it done, bit like asking how much is a scaffold piercing in America
Q:What does the scaffold piercing symbolize or mean?
For some people it does not have a meaning. They just like it.
Q:Full house scaffolding acceptance should pay attention to what the problem
Suggested use, near the LED to avoid high temperature, the higher the temperature, LED light fades more serious
Q:Construction of cast-in-place floor of the use of fastener-type steel pipe support system, which is full of scaffolding, or belong to the template and support system?
Longitudinal sweeping pole should be fixed with fast nuts at a distance of not more than 200mm from the bottom of the pole The horizontal sweep bar should be fastened to the pole on the underside of the longitudinal sweep bar scaffolding pole base is not the same height, the height of the longitudinal sweep must be extended to the lower two spans and pole fixed, height difference should not be greater than 1m The distance from the pole shaft above the slope to the slope should not be less than 500mm single, double scaffolding bottom step should not be greater than 2m single row, double row and full house scaffolding pole in addition to the top of the top step, the rest of the layers of the joints must be used to connect the fastener connection scaffolding pole docking, lap should meet the following requirements: When the pole with docking long, the pole of the docking fasteners should be staggered, two adjacent rod joints should not be set in sync The distance between the joints of the joints to the main node should not be greater than 1/3 of the step distance; When the pole is used to lap, the distance between the two joints is not more than 500 mm; For a long time, the lap length should not be less than 1m and should be fixed with not less than 2 rotary fasteners The distance from the edge to the end of the end fastener cover shall not be less than 100 mm scaffolding pole top railings should be higher than the top of the wall 1m, should be higher than the top of the cornice 15m
Q:scaffolding fell on me on my way to work in june.how long will the compensation take. they are liable?
They won't give you any money unless you keep pushing for it. Make sure you have all the relevant documents organized. Document medical bills, days of sick leave you had to take in order to deal with this, pictures, notes from doctors, contact information from doctors, the list of events with dates and times. Everything that could be useful in court. Maintain a copy of it. Go through company and health insurance channels. If that isn't working, then look for grievance procedures. Politely ask for updates on your situation -- we're working on it is not specific enough. Be assertive without insulting the other person. Sometimes, they might act insulted to keep you at bay. In that case, find alternate routes within the same insurance company or firm. Good luck.
Q:What are scaffolds in Tissue Engineering (TE)?
The frames around which something is built, like a bladder or tube would use a support structure. There is a move to a system like 3D printing too, which provides its own scaffolding sort of, as the structure is built up in layers.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range