• Foldable Scaffold Ladder for construction System 1
  • Foldable Scaffold Ladder for construction System 2
  • Foldable Scaffold Ladder for construction System 3
  • Foldable Scaffold Ladder for construction System 4
  • Foldable Scaffold Ladder for construction System 5
Foldable Scaffold Ladder for construction

Foldable Scaffold Ladder for construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 m.t.
Supply Capability:
5000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

• BS EN 1004-3-8/12-D, Loading Class 3, 2kn/m2

•  Unique Cold-formed jointing combined with Welded jointing system

• Ideal for all DIY around the work and home

• Lightweight, high tensile, trouble-free assembly.

• Foldable structure can be used as a working platform or a conveyance, easy to be   transported and stored,Fold out and assemble in seconds

Part No.

N.W (kgs)

Size(L*W*PH)

(mm)

Packing Size

(mm)

20’GP (sets)

40’ HQ (sets)

Loading capacity

(kgs)

JS-SL300-1

38.4

2000*678*1200

2100*760*280

80

160

200

JS-SL300-2

54.7

2000*678*2000

2100*800*300

80

160

200

We have an advanced manufacturing base equipped with automatic assembly lines. All of our products line is manufactured in accordance with both National and International technical and quality standards including EN1004:2004, ISO9001& 14001 and other safety regulations with the TUV GS certifications and FAA in aviation industry.


 We are specializing in R&D, design and manufacturing of instant aluminum alloy scaffold with the history of 15 years, and is in a position to offer our customers the versatile, low maintenance access solutions to constructing everything from simple freestanding towers to more complex staging systems according to customer’s requirements. Beijing Kangde General Equipment Co, .Ltd. is the first one which introduces the Aluminum Alloy Scaffolding from abroad via acting as the Sole agent in China market, and now ranks the first in this special industry in Chinese market.

Q:What is the service life of the mobile scaffolding accessories?
In actual use, there are a lot of mobile scaffolding accessories because of deformation, and other reasons, resulting in a lot of scaffolding accessories are not easy to use, or even eliminated. Therefore, the overall life of about 5 years. Therefore, the use of mobile scaffolding accessories should pay attention to the maintenance, so that its useful life to get more, the value of the use of more perfect.
Q:What are the requirements for the construction of the scaffold eye in the building?
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q:I'm interested in a scaffold career in the oil rigs in the north sea
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:Please help me in building professional people (scaffolding)
Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
To know about College and university! log on to alumne /
Q:From the Scarlet Letter, Ch. 10-12
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:hi, ive had my scaffolding for a little over a month now, and one of the holes has started going really weird. on the top, its swollen and sore on one side, and on the bottom, its the same but on the opposite side. not sure if its infected ir being rejected by ear, which ive heard can happen. i would like to keep it in if possible,as i love it. any help welcomed :) thanks xx
It could be infected or it could just be irritated, kind of hard to say. Irritation is usually red, sore, maybe swollen. Infected is red, swollen, painful, hot to the touch, dark yellow to green discharge. Best bet is to do warm sea salt soaks 2-3 times a day for 10-15 minutes each (1/4 teaspoon sea salt per 8oz water) and hit up your piercer for a professional opinion. Do NOT remove the jewelry until you are 100% sure it isn't infected.
Q:also apprx. what chapters is it in?
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords