Floor Drain
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 300 Pieces pc
- Supply Capability:
- 50000 Piece/Pieces Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.H59 and H65 high quality brass
2.Elegant,firm, bright and clean
3.Chrome plated and the thickness up to 50 micrometers
Floor drain
No. | 8801 Floor drain |
Material | H59 and H65 brass |
Size | 9.5*9.5*3.5 cm |
N.W | 192 g |
Surface treatment | chrome plated |
Application | for family bathroom,hotel bathroom and so on |
Test | Acetic acid salt spray test |
Package | Inner box size : 9.5*9.5*3.5 cm |
In general,we use carton with neutral packing and in order to meeting your needs,your requirements also acceptable. | |
MOQ | 300 pcs |
OEM and ODM | Acceptable |
Certification | ISO9001:2008 |
After-sale service | 3 years replacement ,5 years warranty |
Payment | 30%TT as deposit start order,and the balance against copy of B/L |
Delivery time | 20-30 days if this goods will be produced after order |
Advantages
Our products | Explanation | |
Materials | H59 and H65 copper | The Kirsite and stainless steel material are apt to rust.The copper will not rust and the H59 and H65 copper is better for making bathroom accessory |
Copper content | the button part≥59% | |
the pipe part≥65% | ||
pipe thickness 0.6-0.8mm | ||
Polishing | use cotton wheel to polish more than 5 times | The cotton wheel polishing can protect the surface of component |
plating | 1.copper layer thickness ≥40 micrometers | The plated layer is up to 50 micrometer and it is beyond European standard |
2.nickel layer thickness ≥6 micrometers | ||
3.chrome layer thickness ≥0.25 micrometes | ||
Acetic acid salt spray test | testing time≥16 hours | The eligible grade is 7,the higher grade, the higher corrosion resistance |
grade≥10 | ||
After-sale services | 3 years replacement and 5 years warranty | Bathroom brand-name products in China |
- Q:Bathroom leaks, toilet wash basin flush down, floor drain will take the water up, you can flow down, is very slow? why? Hurry
- Find a dredge to solve the water or to spend five dollars to buy a simple dug
- Q:Bathroom decoration into this, underwater to leak, how to do
- Give you the decoration of the master is definitely a layman, so simple things are not good, the bathroom floor drain is 3 to 5 cm. But also how to do, knocked on the red! Hope to adopt!
- Q:What is the cause of the installation or the cause of the floor drain?
- There is also an effective way to solve the drainage slope, that is, to increase the floor drain around the slope, the floor of the brick toilets diagonal, the ground drain on the middle of the brick, so that the installation of the slope is very obvious. However, before the installation, the owner should dock with the master good, tell the master toilet tiles size and specifications, so that the master to install the floor drain.
- Q:Floor drain cover does not take down the water slowly on the water on the water and the floor drain will be exposed to dirty?
- You and my family, with the old bell-style or buckle bowl-style water seal to drain, this ground drain is indeed very slow water and water seal after the accumulation of dust and impurities are easy to bet, the water is slower, if your home is the same Layer of drainage, the deodorant did not ask too much, you can put the floor cover on the cover bell or buckle bowl out, this will be better.Of you can only like my home, every time the bath to drain the cover removed, wash And then cover up.
- Q:Can be the toilet water to the ground leakage of things
- For the floor drain can understand the use of gravity under the principle of design is very core leakage
- Q:In the water pipe around the formation of a circle of water seepage, downstairs buckle plate closed, will form a lot of small water droplets, the formation of leaking, looking for people to repair the 3 times is not essential, has been leaked, urge the masters pointing ah, The!
- There are two solutions: 1, upstairs bathroom redo waterproof (large amount of work, trouble); 2, in the floor under another layer of "water tray", and take over the introduction of toilet drain (pay attention to 1, then Water tray sealing performance and drainage of the water seal, otherwise the smell of the pipeline will overflow from here; 2, water plate to meet the water surface to do the soft material, otherwise there will be noise), but the problem is that this will often take downstairs The ceiling space and elevation, downstairs can agree?
- Q:Home new clothes to the ground, that is, the kind of apple, which there can be out of the core, according to the water can go directly, but now must take the core water to go, see no cement, the following if there are Something to plug off the core water will not go directly, how is this going on? Is there any good way?
- There may be a leak to the core of the problem, you can take out the leak to take a finger to see the pressure to see the ground to rebound the strength of the rebound, and press the intensity of how much, take the drain core drainage, indicating that the drainage pipe is no problem, you can see the gold Dell floor drain, my home feeling pretty good.
- Q:Meaning is the two words, that is a thing?
- Floor drain, in the water supply and drainage volume
- Q:Because do not understand the general knowledge, in the hardware store casually purchased a bell-style floor drain, the beginning of the bath when the water can be smooth out, not long, the floor has been completely no water, and this leakage if the replacement of how to replace it?
- You can not change the installation of the cement has been used for irrigation, then you have a few brick on the edge of the bad. Suggest that you are cheerful
- Q:Leakage of water, their own water is also down where the problem is not
- And the ground drain connected to another water container (such as: wash basin, bath) of the ground drain in the U-tube after the blocked. So the washbasin or bath when the water will leak to the water.
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2008 |
Annual Output Value | US$5 Million - US$10 Million |
Main Markets | North America 6% South America 9% Western Europe 12% South Asia 3% Domestic Market 70% |
Company Certifications | Guangdong Province integrity enterprises; Bathroom brand-name products in China; Consumer Satisfied brand; China Green taps |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Jiangmen |
Export Percentage | 21% - 30% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 8 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Floor Drain
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 300 Pieces pc
- Supply Capability:
- 50000 Piece/Pieces Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords