Flat Top Tower Crane TC 5610 for Construction

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of our Tower Crane

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Max. lifting capacity

t

6

Working range

m

3-56

Lifting Height

Independent

40.2

Adhered

151.2

Lifting speed

Double magnification

m/min

80/40

Quadruple magnification

38/19

Slewing speed

r/min

0.637

Trolleying speed

m/min

44/22

Climbing speed

0.4

Min. stable descending speed

<7< span="">

Overall dimensions

Foundation frame

m

8×8

Overall height

Independent

50.892

Adhered

160.892

Jib end to the swiveling center

56.17

Balance tip to swiveling center

12.39

Total weight

Structure weight

Independent

t

40.49

Adhered

80.87

counterweight

18.34

Total motor capacity

kW

41.52

Allowed operating temperature

C

-20-+40

Power supply parameters

50Hz

-380V±10%

 

 Flat Top Tower Crane TC 5610 for ConstructionFlat Top Tower Crane TC 5610 for Construction

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley.
Q:Tower crane body standard section connection bolt screw upward or downward, why?.
Up or down, there is no change in the firm torque of the connecting bolt. Simply choose to go up or down for convenience. Generally no special requirements, it is recommended that the thread upward, so that it is not easy to rust.
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:How much height should tower crane work at M?
High building one meter high voltage line to keep the relevant national standard to ensure the forearm and the adjacent adjacent tower crane tower crane standard section has a safe distance of 2 meters, big boom high high tower mechanism area covering more than one meter, the end will need to receive from the nearest cab hook.
Q:What windproof devices should be set up for crane work?
4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
TC6013A-6-A2:TC is the abbreviation of tower crane, and 6013 is crane lifting moment, which means that 60 meters long arm tip can lift 1.3 tons. A says Model 6 means lifting capacity of 6 tons. "A2" means code.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range