Flat Top Tower Crane TC 5013B for Construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 20 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of our Tower Crane
1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3, It is original in design, reliable in operation and satisfactory in shape.
4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.
5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products
Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Specification of Tower Crane
Max. lifting capacity | t | 6 | |||
Working range | m | 3-56 | |||
Lifting Height | Independent | 40.2 | |||
Adhered | 151.2 | ||||
Lifting speed | Double magnification | m/min | 80/40 | ||
Quadruple magnification | 38/19 | ||||
Slewing speed | r/min | 0.637 | |||
Trolleying speed | m/min | 44/22 | |||
Climbing speed | 0.4 | ||||
Min. stable descending speed | <7< span=""> | ||||
Overall dimensions | Foundation frame | m | 8×8 | ||
Overall height | Independent | 50.892 | |||
Adhered | 160.892 | ||||
Jib end to the swiveling center | 56.17 | ||||
Balance tip to swiveling center | 12.39 | ||||
Total weight | Structure weight | Independent | t | 40.49 | |
Adhered | 80.87 | ||||
counterweight | 18.34 | ||||
Total motor capacity | kW | 41.52 | |||
Allowed operating temperature | C | -20-+40 | |||
Power supply parameters | 50Hz | -380V±10% |
- Q:You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
- The cranes are built in the elevator shafts and moved up as needed during work progress.
- Q:OMG! a phoba of crane flys, and there are 5 on my celling right now!!! What do I do, will the move and fly around eventually? I can't kill them, they are out of my reach, and if they start moving, im runing the %^$ outta my house.Will they die by tommorow? or will they just hang there?
- The spiders in your house will kill them and eat them. If you don't have spiders, just wait. They will come in for your crane flies. If you must get rid of them before the spiders do the work, use your vacuum. The crevice tool will suck them up and crush them in the bag. I had one in my house this morning. It was hanging around my east window as the sun was coming up. I used a towel to guide it toward the open patio door. You do need to be up about dawn for this to work.
- Q:I swear I'm a giant crane fly magnet and whenever there are crane flies within a mile of me they'll find me and chase me, and I'm dead terrified of them. I noticed that there are more and more of them since the beginning of April. Does it have anything to do with the rain? When will they go away?
- It's like they have no control over their limbs, and flutter onto you. We had one in our living room called Henry who my mum tried to kill because we are all so scared of them, and she disabeled it. It had a squashed leg. I felt sorry for it. It's proably because of global warming that they are still here.
- Q:In what circumstances should a tower crane be demonstrated by an expert?
- Three, lifting and installation, demolition works(1) use of unconventional lifting equipment, methods, and lifting weights of a single piece in excess of 100kN and aboveHeavy lift works.
- Q:i want to know about the origami cranes
- im pretty sure the origiami craft originated in Japan. i'm not too sure, but i did look it up, and it said japan. so im guessing thats right.
- Q:I've looked on the internet and I haven't found anything so far. The paper on it is due tomorrow...arrrggghhhhh...
- Hi, Briisthe! Just go into Google and type - what is the migration route of the whooping crane? Then click on the article - Journey North Whooping Crane Migration Then click on the maps and all will be revealed.
- Q:Question says it all. On the Yahoo homepage, there is a breaking story that you can not click on, stating the NY fire department are responding to a building collapse, but when you try searching it, only a story about a crane comes up in Yahoo search engine. Anyone know if it's 2 different stories or the same thing?
- 92 okorder / LISTEN TO THE SCANNER HERE. JUST PRESS PLAY
- Q:I know, do you know?
- They build it on the ground, raise it up with another crane, and then lift the counter weights up!
- Q:What is the calibration value of a tower crane?
- Do you mean the calibration value of crane lifting moment? That should be the product of the maximum magnitude of the tower crane and the corresponding maximum lifting load.
- Q:I want this as a tattoo but I want to know what it means. Why type of tree is it? What do the symbols translate into?
- The kanji / symbol (character of Chinese origin, also used in Japan) is the kanji for 'crane' (the bird, not the construction site vehicle!!)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Flat Top Tower Crane TC 5013B for Construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 20 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords