Feature of Cuplock Scaffolding System/Cuplock Type of Scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 PCS
Supply Capability:
10000 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Brand Name:

BY

Model Number:

BY-628

Packaging & Delivery

Packaging Detail:Loose, in bundle, plastic film, or as customer's requirements
Delivery Detail:Around 15-20 days base on your order quantity

Specifications

Cup Lock Scaffolding System/Cuplock Scaffolding 
1)Material: Q235 
2)Surface treatment: HDG 
3)Tube size: 48.3mm

Feature of Cuplock Scaffolding System/Cuplock Type of Scaffolding :


(1) Easy assembly, time and labor saving. (2) High load-carrying capacity.


(3) Adaptable to various construction projects.


(4) All elements safely connected


(5)Highly durable


Name

 

Cup Lock Scaffolding System/Cuplock Scaffolding

Main Material

Q235

Surface Treatment

Hot Dip Galvanized

Certificate

EN74

Service

OEM Service available

MOQ

one 20 ft container

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

In bulk or steel pallet or as your request

Production capability

15 containers/month

Basic Information


Product/Service (We Sell):scaffolding,steel support,frame scaffolding,cuplock scaffolding,ringlock scaffolding  

Number of Employees:51 - 100 People  

Trade & Market


Main Markets:South Asia
Mid East

Total Annual Sales Volume:US$2.5 Million - US$5 Million  

Export Percentage:71% - 80%  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q:How badly does getting an industrial/scaffolding piercing hurt?
my experience was easy and fast. it was the next day waking up that kills you! keep in mind that its thick cartilage, but it is really worth it. you'll get used to it by like day 3 or 4 but and tug or pull will remind you of the pain. i recommend it!
Q:Division.. Scaffold method?!?
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:Electric basket accessories are generic
Electric basket among many different parts, such parts have effect to better play its electric basket. Safety rope and the Rieter electric basket frame connection, because the rope with a diameter of not less than 13mm diameter steel wire rope length is arranged. One way is to use the rope around a basket frame bottom and the safety rope prison card (at least 4 buttons) each card once left not greater than 1m lifting weight, basket case from off bearing wire rope or wire rod chain, safety rope hanging basket frame plays the role. This method is very troublesome, each 1m will lift an insurance card rope, and in case of loss Ping An, rope there will be no more than 1m about free falling impact. Therefore newly developed into a safety self-locking device (LSL63 type hanging scaffold with a safety lock, at the same time, set in peace on the wire rope, the normal lift safety lock with electric basket frame along. The risk of wire rope lifting, in case the basket falls off, the safety lock can automatically lock the cradle body on the safe wire rope
Q:Seeking for the safe construction scheme of mobile scaffolding!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
Q:The structure that acts as a scaffolding for chromosomal attachment and movement is called what?
The first one is vague. The answer could be the mitotic spindle. It might be kinetochore microtubules. It might be talking about the kinetchores on the chromosomes instead of the microtubules that attach to the kinetochores. It could possibly even be talking about the centromeres, though to me that seems less likely. Neurons in the adult brain (and mature muscle cells?) do not routinely undergo cell division.
Q:Specific specification for erection of civil scaffold
5.2.5 scaffold EngineeringA. accessories(1) selection and calculation basis of structural parts1) selectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
A set of how much money a day, of course, there are some monthly price calculation
Q:Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range