Fastener&Castors

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

All kinds of scaffold accessories:

Fastener、Castors、connecting pin







Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:why are there lumps on my scaffold peircing :S?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:Specific specification for erection of civil scaffold
Inspection and acceptance1) the relevant provisions on inspection of steel pipesSteel pipes, fasteners, safety nets and other products must have a certificate of quality.All components must have quality inspection report, steel material inspection method must comply with the national standard "metal tensile test method" (GB/T228) the relevant provisions of the quality should be consistent with the "carbon structural steel" (GB/T700) regulations Q235. a steel.The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
Q:Who has external scaffolding construction program
Construction preparation1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.2 the size and surface quality of steel pipe shall meet the following requirements:1 new steel pipe should have quality certificate, quality inspection report; steel surface should be straight and smooth, should not have cracks, scarring, stratification, dislocation, hard bend, burr, indentation and deep way;
Q:Scarlet Letter: Why does Hester keep her promise to Chillingworth on the scaffold?
The rosebush grew to become in front of the darkened, detrimental penal complicated, between many much less suitable flowers. i think of of it symbolized that there is popularity in even the worst of souls. it may serve, enable us to need, to advise some candy ethical blossom, that's found alongside the song, or relieve the darkening of a tale of human frailty and sorrow.
Q:What scaffold courses do i need to do to work offshore?
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:Industrial/Scaffolding piercing swollen and sore?
The soreness and swelling is normal. Try to really be careful about not knocking it. You're only going to get a keloid if you are prone to them, if you've never had a keloid you likely won't get it. It's hypertrophic scarring that is pretty common with industrial piercings which is why taking care of the piercing is really well. If you're using regular salt then that is a problem - it needs to be non-iodized sea salt. Soak the piercing twice a day for 5-10 minutes each soak with a mixture of 1/4th of a teaspoon of the sea salt to 8oz of hot water. Make sure you're not moving the bar around at all. Take ibuprofen and ice it for the swelling.
Q:how much does a scaffold peircing hurt compaired to a nose piercing?
ive just had scaffolding done, and it was quite painful, far more painful than i was told. they just stab through your ear with a needle, but i didn't think it was that bad. not as bad as getting your nose done. but it was very sore and painful to touch for days after. hope this helps :) X
Q:How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range