Fastener&Castors

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

All kinds of scaffold accessories:

Fastener、Castors、connecting pin







Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The construction should strengthen the specific meaning of scaffolding and support
The scaffold is outside the frame, it is characterized by relatively large height, shape, wind load and gravity load is; while the template bracket shape because the concrete component varies, the total height, gravity load, improper placement to lose stability, no need to calculate the wind load, etc..
Q:Info on scaffold piercing?
a million. there is a few discomfort in touch. in simple terms relies upon on the way you cope with it. 2. there is new information that even after years of having the piercing it could nonetheless substitute into contaminated =/ 3. It has a bent emigrate because of the fact of ear strengthen (your ears in no way particularly provide up growing to be). 4. Dont over sparkling it. 5. Its executed with a medium gauge needle. 6. i comprehend in the States that many piercing places won't touch everybody under sixteen inspite of parental consent. there is likewise a many greater that isn't touch a minor (everybody under 18). So i could call around and notice.
Q:Can I clean my scaffold piercing with my make-up wipes?
problematic problem. browse at search engines like google. this could help!
Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:I need to be guided to supplier of Aluminum Scaffolding?
Please okorder.com Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q:Is it possible to use Boston Ivy as scaffolding for wisteria so one climbs up the other?
The wisteria will climb on anything and everything it can get it's tendrils on. But are you sure you want it on your ivy? Wisteria is the most aggressive grower,and will overtake the ivy, choking it out. As a matter of fact it's not the kind of plant to have close to your house. I know,the blooms are pretty and all but the rest of the plant is a holy terror on your siding,shingles,etc. If you still want to plant it near your house, choose a spot well clear of the power lines that supply your electricity.
Q:What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q:Introduction of external scaffolding
2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m
Q:Scaffolding????
It refers to the ways that you break a concept and/or a task down using graphic organizers, etc.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range