FANGYUAN TOWER CRANE TC6020

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:



1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.  
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction tower crane operator certificate expires, how to verify?
Two, training contentThe crane safety regulations and operation management; classification and main parameters of the crane; the structure and the working principle and the safety protection device of lifting up; the installation and removal of heavy machinery; the whole debugging and acceptance of heavy machinery; the operational and command signal of lifting and repair; and maintenance of heavy machinery.Three, training hours and full-time training arrangement: 5 days, annual training enrollment.Four, training fees450 yuan / person, including registration fees, training fees, books, information, assessment, assessment fees, accommodation, self-care.Five, training certificationStudents complete the prescribed courses, through the examination, after passing the examination by the Municipal Construction Commission issued a number printed and stamped with the "Chongqing City Construction Management Committee of" legal. "Chongqing construction tower crane operator qualification certificate".
Q:All types of jack up cranes. How is the maximum lifting torque converted?
Tower crane lifting torque = crane maximum lifting weight * maximum operating range; for example: the maximum lifting weight is 2T*, the maximum operating range of 50 meters =1000KN.m.
Q:Under what circumstances does a tower crane require third party testing?
New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
Q:Four for crane, two for insurance, two for insurance. What does that mean?
Four limit: torque, ultra high, variable amplitude, walking limit device. Two insurance: hook insurance and reel safety device.
Q:What are the safety devices in a tower crane?
Answer: 1: height limit2: lifting weight limiter3: torque limiter4: travel limiter5: speed (maximum speed of force must be more than 40m/min)6: put a device (jib tower crane to move) must have7: the rotary limiter (no collector on the revolving part) must have8: car broken rope protection9: anemometer (boom root hinge point height is greater than 50m should be set)10: windproof device (rail type)11: buffer and end stop12: Rail sweeping plate (rail)13: protective cover14: derailment device15: emergency power off switch (red mushroom head)
Q:In what circumstances should a tower crane be demonstrated by an expert?
(two) lifting equipment with lifting capacity of 300kN and above; climbing within height 200m or aboveDemolition of heavy equipment.
Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
Q:What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
315, 40 months rent about more than 10000, some have the strength to buy ah, rent two years is enough to buy one. Ha-ha

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range