FANGYUAN Electric Crawler Pile Driver JZL120

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

JZL Long Spiral Electric Crawler Pile Driver

The JZL and JZB series of pile frame developed by Fangyuan Group are mainly used in the construction of pile foundation with various operation methods, such as long spiral drilling, diesel piling hammer, SMW technology, and etc. With safe and beautiful structure, reliable and advanced control, and flexible operation, the product is very popular among customers.

Electric Crawler Pile Driver    

JZL series of electric crawler pile frame developed by Fangyuan Group has independent intellectual property right, and it features complete electric control, high efficiency, good stability, high performance/price ratio, etc. Equipped with different working devices, the product can be used as different piling machinery such as long spiral drill, SMW machine, screw pile machine, and diesel hammer pile driver, which is real multifunctional and it can eliminate the needs for some of the imported equipment, which greatly reduces the cost.

Model

JZL60

JZL90

JZL120

JZW90

Main Functions

Long Spiral

Long Spiral

Long Spiral

Screw Pile

Max.boring diameter

mm

800

800

1000

500

Max.boring depth

m

25

31

3133

24

Column height

m

30.5

36.5

36.838.8

30.5

Lifting capacity

kN

400

640

800

420

Lifting speed

m/min

2.0/2.6/3.2

1.8/2.2/2.6

1.2/1.6/2.0

1.8/2.1/2.4

Slewing speed

r/min

0.37

0.36

0.38

0.36

Travel speed

km/h

0.25

0.28

0.28

0.28

Total weight

t

58

70

90

75

Dimension

Length

m

12

13.6

13.4

13.6

Width

m

5.5

6

6.2

6

Height

m

32.6

38.5

38.8

32.5


The above parameters are subject to change without prior notice, please refer to the actual product.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why are pile driving boring often deflected?
Hello, it's normal to hit the mark. To keep it accurate will cause trouble to the construction. It has the allowable error, but it is accurate when pouring the concrete. There will be no mistake. Good luck...
Q:Several common pile foundations and pile driving techniques
Bored pile foundation construction - long spiral drilling bored pile construction, the main processes are: site preparation, the laying of protective cylinders, preparation of mud, drilling, cleaning, reinforcement cage, into the hole and pouring underwater concrete. The key is drilling, the main methods are: rotating method, impact method and punching method. The rotary drilling can be divided into positive revolving drilling, reverse circulation rotary drilling, long spiral drilling machine and so on. Bored pile foundation construction - reverse and reverse rotating drilling, positive rotation drilling: mud from the mud pump at high pressure from the mud tank into the bore of the drill pipe, the drill hole through the mouth of the injection.
Q:What certificate should be required for the construction of the pile driver?
After the site installation of pile driving machine is completed, the testing institution shall be qualified for on-site inspection and issued a certificate of qualification.
Q:How deep can a pile driver work?
As the drill wylong machinery in rotary machine is capable of hitting at least 20 meters deep
Q:Is the loading type barrier pile driver practical?
And, as I have seen, ha, five loaders have been used for more than a year since the purchase. There has been no major failure. It may be luck. Arguably, domestic engineering equipment should not be so used.I suggest, if you small quantities or steadfastly practical cost 260, the large quantity you can choose the loading type guardrail piling machine try very energeti.
Q:Grounding of pile driver for help
Five core power cable, PE core wire may reach 16 square, in pile machine within 30 meters hit a 3 meter long galvanized angle (angle 50X5X3000), the head of a hole on the M10 (or M12) galvanized bolts, connecting 16 square BVR yellow green color line to the pile machine (repeat grounding), angle head (to prevent the hammer head welding deformation angle) a piece of iron, if you want to reuse (pull out in place again), can be connected with the hanging wire rope or a hook hole in angle steel.
Q:What safety measures should be taken when assembling a pile driver?
4, mechanical equipment installation and transportation safety mattersThe mechanical equipment should be installed in a safe place, not in the rock slope landslide, or may be installed by flood invasion and flying stone in place, to ensure personal safety and machinery.The room layout shall be constructed according to the mechanical instructions or actual needs. Room to ensure mechanical windproof and rainproof, antifreeze and other requirements, to the appropriate area, convenient operation and maintenance, and adequate lighting, good ventilation, shutdown protection facilities for temporary use of machinery should be necessary.Mechanical equipment shall be installed according to the instruction manual and relevant regulations. After installation, safety inspection and performance test shall be carried out, and may be put into use after the test operation has been qualified.When the mechanical equipment is transported, make sure the binding is firm, the center of gravity is reliable, the brake is reliable, and the traffic safety is ensured.When mechanical equipment is unloaded, be sure to handle with care, forbid to throw and throw off from the car, use dump truck to transport machinery, forbid dumping with dumping method.
Q:How many kinds of pile driver are there?
and hammer lifting flange lever automatic control, impact stroke two ways can adjust the hammer. Three diesel hammer body is made of cylinder and piston, similar to the working principle and the single cylinder two stroke diesel engine into the cylinder combustion under high temperature and high pressure atomized diesel combustion chamber by injection pressure generated by the detonation driven hammer working. According to the structural form of diesel hammer rod and cylinder type separation. The guide rod type diesel hammer is pressed on the pile cap with a plunger as a hammer seat, and the cylinder is used as a hammer head to move up and down along the two guide rods. When in operation, the pile hanging in place pile frame in Longmen, then put the diesel hammer at the top of the pile, the hook will lift down the cylinder, and the cylinder sleeve off hook to the whereabouts of the piston, the cylinder will be closed in the air compression cylinder rocker pin until the pressure continues to fall outside the cylinder pushing hammer on the base of the fuel pump, fuel pump will be injected into the cylinder oil mist, oil mist meet high temperature gas burning immediately above, blasting, explosive shock down pile., to push the cylinder to cylinder to rise, fall along the guide rod, and the beginning of the second impact cycle.
Q:1. What do AMD's pile drivers and bulldozers mean?
A pile driver is an improvement in bulldozers. No leap, but improved performance.
Q:How to maintain the pile driver daily?
Daily maintenance of pile driver1 、 maintenance of each shift (after class, after class)(1) before the daily operation, the operator should clean the surface of the pile driver. Parts that need oiling must be lubricated 1-3 times a day to keep the lubricated parts lubricated. (2) remove dirt and dirt from the equipment. (3) check and fasten the connecting bolts of each department, check the lubrication and wear of main clutch, steering pump, fan bearing, high pressure oil pump, load wheel and idler pulley. If there are any problems, they should be dealt with in time.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range