Product Description:

construction hoist description:

The construction hoist product  produced by Fangyuan has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And Fangyuan is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

The built-up hoist will be much more expensive, but will also be easier to repair and more durable. Package units were once regarded as being designed for light to moderate usage, but since the 60s this has changed. Built-up units are designed for heavy to severe service, but over the years that market has decreased in size since the advent of the more durable packaged hoist. A machine shop or fabricating shop will use an integral-package hoist, while a Steel Mill or NASA would use a built-up unit to meet durability, performance, and repairability requirements. NASA has also seen a change in the use of package hoists. The NASA Astronaut training pool, for example, utilizes cranes with packaged hoists.

 

Construction Hoists Specification:

SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage construction elevator can be changed into single cage type, such as SCD200.

Model

SC200/200

SC200/200BP

SCD200/200

SC200/200B

Configuration

Standard type

Frequency conversion

Counterweight type

Export type

Rated load

kg

2000/2000

2000/2000

2000/2000

2000/2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

16/16

16/16

16/16

Max.lifting height

m

150

300

150

150

Max.height of free end

m

9

9

9

9

Lifting speed

m/min

33

0~60

33

33

Capacity of small hoist

kg

200

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×3/11×3

11×3/11×3

11×2/11×2

11×3/11×3

Speed limiter

Action speed

m/s

1.2

1.45

1.2

1.2

Rated brake load

kN

40

40

30

40

Model

SCD200/200B

SC100/100

SCD200

Configuration

Counterweight type

No counterweight

Counterweight type

Rated load

kg

2000/2000

1000/1000

2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

12/12

16

Max.lifting height

m

150

150

150

Max.height of free end

m

9

9

9

Lifting speed

m/min

33

33

33

Capacity of small hoist

kg

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×2/11×2

11×2/11×2

11×2

Speed limiter

Action speed

m/s

1.2

1.2

1.2

Rated brake load

kN

30

30

30

 


The above parameters are subject to change without prior notice, please refer to the actual product.

Note: Both cage size of 3×1.3×2.2 and 3.2×1.5×2.4 are available for of each model (Excl. export type).

 

Construction Hoist Images:

 

 

 

 

FAQ of Building Hoist:

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Are there any good signs in the construction elevator door
Referring to the unified code of construction safety technology of GB 50870-2013, and the construction safety inspection standard JGJ59-2011
Q:The working principle of construction elevator
The construction elevator is a kind of common name, its standard name should be the construction elevator, this is a kind of crane machine equipment. Construction lifter adopts modular structure, because it is used in construction process, the elevator needs to be constantly shift with the construction project, therefore its structure must be easy to disassembly and assembly. For example, after the site is used, the elevator is disintegrated and transported to another site for reassembly of construction elevators. So how does the construction elevator work? The construction elevator mainly carries the structural self-forming system, and the construction dependence is low. It more driven by force, drive devices are installed on the hanging basket, through the gear and rack drive system, the mutual cooperation, so as to realize the rise and fall of the elevator. You may have seen gear and rack in the mechanical clock, the gear is round, the rack is straight, and the two bite together to achieve the motion. The elevator work that is common in our residential and commercial buildings is different from the construction elevator. Most of the elevator parts are fixed in buildings, which are mainly carried by buildings. Its movement is achieved through wire rope.
Q:How much cable does the construction elevator 44KVA need?
44 kva should choose 16 + 2 * 3 * 6 square cable, 16 of the 30 ℃ safe carrying capacity is 78 a cable Current I = P/U / 1.732 = 44000/380/1.732 is approximately 67A The construction elevator will not only carry the engineering materials but also the higher frequency, the load calculation will be calculated according to the continuous working system. The cable should be used for the YGTZ special cable.
Q:How many meters must be installed in the construction elevator search?
There is an elevator quota in the budget quota, but how many floors can be priced?
Q:The difference between the derrick and the construction elevator?
You want the picture to still want to explain, the words to go to baidu search all can. The derrick is not to be multiplied by the person, the setting height is not more than 30 meters, now most of the place begin to phase out the use of the derrick, because the safety coefficient is low. The construction elevator can carry cargo, set up a height of 150 meters, and can carry a weight of 1-3 tons
Q:When does the construction elevator take off?
This is not specific time, it is the contractor's own
Q:Is the construction elevator the same as the construction elevator
Construction lifter and building construction elevator, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction lifter is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. There are many kinds of elevators in construction, there are no two kinds of weights and weights in the way of operation, and they are controlled by manual control and automatic control. You can also add inverter and PLC control modules as needed, and also add floor calling devices to the peace layer. The structure principle and characteristics of construction lifter: construction lifter for meet the needs of the lean construction bridge, chimney, etc, it according to the building shape, install the guide frame tilt, and hanging basket level, along the inclined guide plane running up and down.
Q:Can construction elevators be taken by people or by goods
The construction elevator can be taken either by person or by cargo Material hoist (dragon door frame, well frame) can be carried only, not by person
Q:Safe use of construction elevator
1. Construction enterprises must establish and improve the construction lifter of all kinds of management system, the implementation of the professional institutions and management personnel, clear the safe use and management responsibility system at various levels. The driver of the elevator should be trained by the competent department of the relevant administrative department for the training of qualified personnel. The driver should do the routine inspection, namely, when the elevator is first run, each class should be free and full of trial operation. 4. Establish and implement the system of regular inspection and maintenance, each week or each ten-day of elevator to conduct a comprehensive inspection, to find out the hidden dangers in accordance with the "armed" principle to carry out the rectification. After the rectification must be checked and confirmed by the relevant personnel, the safety requirement will be used.
Q:Do the elevator need to be installed when the main project is in construction
Installation, of course. The general building should be installed at about 10 meters on the 4th floor, or the person will go up and down the time is dangerous, and there will be some materials that can't be carried by the tower, too slowly

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range