• Famous Brand Cup lock Scaffolding from China System 1
Famous Brand Cup lock Scaffolding from China

Famous Brand Cup lock Scaffolding from China

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Famous Brand Cup lock Scaffolding from China

1. Quick Details:

Place of Origin:Hebei China

Model Number: W104

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements

2.Packaging & Delivery:

Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.

Delivery Detail: WITH IN 25 DAYS

 

3.Product Information


Product Name

Japanese Type Swivel Scaffolding Couplers

Type

GTJ-S002

Material

Q235

Thickness

2.5mm or 3mm

Weight

0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951

Dimensions

48.6   x 48.6mm

MOQ

10000PCS

Product feature

anti-rust,   skid proof, high breaking strength

4.Pictures:

Famous Brand Cup lock Scaffolding from China

Famous Brand Cup lock Scaffolding from China

Famous Brand Cup lock Scaffolding from China 

5.Advantages:

1.GREAT REPUTATION CUP LOCK SCAFFOLDING

2.Three Year Warranty

3.Operating Friendly

4.Full Safety Devices

5.Provide OEM service

6.Reasonable price


6.FAQ

How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.


Q:Hester Prynn stands on a scaffold
In medical college they had to take notes rather at once. commencing off to be a doctor isn't that straightforward now, the fee of their writing messep up their handwriting and that they do now no longer care approximately it after commencing off to be a doctor.
Q:A scaffold is constructed by placing two supports under a 18 ft, 4 in (a) board weighing 77 lbs. The supports are each 2 ft, 6 in (b) from their respective ends. Two painters stand on the board; one weighs 153 lbs and stands 2 ft, 6 in (c) from the left end of the board. Where must the 202 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.
Q:Can any one tell me about different types of scaffolding? Especially about tubular and frame scaffolding. If you can tell me about the components using in scaffolding also, that would be appreciate. Please give me some useful links too. Thanks in advance.Regards,Just A Guy
Sorry I don't have links.But I have had the tube type for over 20yrs.The components are :cross bar decks or planks leveling pads scaffold ends(thats what we called them) You should be able to call your local rentall place and find out where you can purchase some or you might be able to purchase theirs at a good price.One more piece you may want to consider depending on how high you go is called a wall tie.always make sure your scaffold is level both ways!it makes a difference when you start to stack or tie together in a string.goodluck
Q:What were Hester's three appearances on the scaffold?1 was prosecution and another was dimmesdale's death and confession. What was the third?
I think that's where she meets Dimmesdale at night with their daughter, and they watch the comet fly over their heads. She was coming back, from doing work with her needlework (it's either the gloves or the shroud, if that helps). Dimmy sees her, they meet, and the red comet shoots by. The residents thing that it means Angel, since I think that it made an A shape in the sky.
Q:What is the tension in each wire?a.Left wire = 40 N; right wire = 160 Nb.left wire = 200 N; right wire = 80 Nc.Left wire = 160 N; right wire = 40 Nd.Left wire = 240 N; right wire = 120 NThank You!
The sum of the two tensions must equal the total weight supported so Tl + Tr = Wb + Ws = 200 + 80 where Wb is the weight of the box and Ws the weight of the scaffold. That's enough to choose the right answer, but to actually compute the tensions, you also need the torque equation. The sum of the torques around the left end of the scaffold must be 0 since the scaffold isn't moving. That means: 0 = (1.0) Wb + (2.5) Ws - (5.0) Tr where 1.0, the 2.5, and the 5.0 are the radii corresponding to the forces. So you can solve for Tr and then Tl.
Q:Wheel buckle scaffolding rental price
3, according to the vertical pole lease (cross bar is not included), each pole 0.1~0.15 yuan / root / day. 4, according to the lease, 7~8 yuan / square. Time (time). The above is the reference price, the specific market prevail.
Q:ends. Bob weighs 730 N and stands 1.00 m from the left end, as shown in the figure below. Two meters from the left end is the 500 N washing equipment. Joe is 0.500 m from the right end and weighs 910 N. Given that the scaffold is in rotational and translational equilibrium, what are the forces on each cable?
Rainwater forgot about the weight of plank itself... So: (0.5 m)×(910 N) + (1 m)×(500 N) + (1.5 m)×(295 N) + (2 m)×(730 N) = (3 m)× T? T? = 952.5 N (1 m)×(730 N) + (1.5 m)×(295 N) + (2 m)×(500 N) + (2.5 m)×(910 N) = (3 m)× T? T? = 1482.5 N Check: (952.5 N) + (1482.5 N) ?=? (730 N) + (295 N) + (500 N) + (910 N) (2435 N) !=! (2435 N) Seems OK ;-)
Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:How much is the adjusting range of the scaffold of the bottom
(3) is the key to the bottom assembly of bowl buckle scaffold, the assembly quality directly affect the overall quality in the installation bracket; the two layer horizontal bar, first check and adjust the level and the vertical frame is straight; secondly should check the level bar level, and by adjusting the vertical rod can be the adjustable base horizontal bar horizontal deviation less than L/400 (L is the horizontal rod length); inspect pole foot, ensure all pole under the pad, not vacant and loose; when the bottom shelf conforms to the erection requirements, check all the cuplok joint and locking, in the erection process at any time to check the the content, and make adjustment.(4) scaffording to strictly control the vertical rod vertical and horizontal rod level, the entire frame verticality deviation not more than h/500 (H is the height of the pole), but no more than 20mm; the horizontal rod level in accordance with the above provisions (3).
Q:Wankou scaffolding steel scaffolding and look like? What's the difference?
The bowl buckle scaffold is used as a bridge support or is more than a full frame, and steel pipe fastener scaffolding used to build more than two rows of shelves, rarely used as support

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products