Factory 2 Years Warranty LED Lamp PC Cover High Quality Aluminum 6W E27/ E26 450lm 85-265V LED Bulb Light
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 20PCS pc
- Supply Capability:
- 200000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
LED bulb light is designed and manufactured to replace the 60-75W incandescent /Halogen bulb and 19W CFL, the superior SMD LED solution and purity aluminium material makes the luminous efficacy high to 84LM/W, it is of excellently heat managed by conjoint structure which maintains the LED working temperature in a comfortable condition. We promise 2-year-warranty for all the bulbs we manufacture.
Material | Aluminium and PC |
Voltage | AC 85-265V |
Base | E27/E26/E14/B22 |
Operating Frequency | 50-60Hz |
Power | 6w |
Beam Angle | 180 degress |
Color Rendering Index (CRI) | >80Ra |
Correlated Color Temperature | 2000-3500K,4000-5000K,5500-6500K |
Color | Warm White/Natural White/Cool White |
Surface Color | Milky White/ Frosted/ Clear |
Lamp Luminous Efficiency | 80-90lm/w |
Operational Environment | -20°C to +55°C |
Life Span | 20,000hrs |
Certification | CE,ROHS |
Features
1. SMD LED solution, excellent heat dissipation performance.
2. Energy saving perfect replacement for incandescent bulb and CFL, low Energy Consumption.
3. High luminous efficiency as high as 90-110lm/w.
4. Wide working voltage AC85-265V.
5. Particularly designed constant current driver for open or short-circuit protection.
6. Green, No UV and IR Radiation.
7. Environment friendly, no mercury, lead or hazardous materials.
8. Easy to install, E27/E26/E14/B22 are available.
9. Anti-Vibration, convenient for transportation.
10. Certificate: CE, RoHS.
11. Warranty period: 2 years.
Usage/Applications
1. Widely used to replace traditional incandescent bulb, fluorescent light and CFL.
2. Suitable for shopping mall, hotel, restaurant, museums, art galleries, cosmetic counters, show window etc.
Customized options
1. Customized label/ Logo can be made onto Product and Retail Package.
2. Multi colored, cool white and warm white optional.
Packing & Delivery
Package:
1 x Bulb
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory
- Q:Want to buy a few LED bulb, do not know how to identify the quality of good or bad, ask for solution ~!
- See brightness, whether the luminous uniformity, the back of the heat is good?
- Q:Seeking the production process of LED bulb... Thanks
- 10 points, Baidu wants to be a LED engineer. LZ is a real budget man
- Q:Why is 3W's LED plastic bulb so cheap on the market? Is there any drawback to the price difference between aluminum and aluminum?
- One point price must be a sub goods, this is wrong.Plastic cheap because the cost is relatively low, can not talk about grades, plastic LED mainly for the application oriented,
- Q:LED bulb lamp. Is there a good drive or no drive? Is the lamp of good or integrated?
- LED bulb lamp, are driven by a power of the ordinary small beads, driving is very simple only rectification, filtering, limiting the number of components is another large power SMD beads, this drive is more troublesome, SMT SMD components, and double plate, both have the element.
- Q:Will the power of the LED bulb grow longer and longer? Why?
- The LED bulb does not become more powerful for extended periods of time.
- Q:LED what is the plastic shell of the bulb? What plastic material is better? What do you need to pay attention to?
- You should say that the bulb of the bulb, usually PC material.
- Q:Is it possible to manually weld LED bulb bulbs?
- Well, the lights go straight up, aging, usually 24 hours of aging, testing, you have to open 10 seconds, 10 seconds off, so non-stop switching for 2 to 4 hours
- Q:What advantages does LED bulb replace energy saving lamp?
- The LED lamp is solid-state lighting, if all LED lamps a year remaining nearly three electric power Three Gorges hydropower station, the country.
- Q:How to identify Ic constant current LED bulb?
- Look at the power supply, there are a few simple electronic and capacitive circuit board, it is not constant flow, cross flow is larger, so understand? Cross flow IC, that is, the meaning of intelligent voltage regulator, so that the LED is not easy, bad capacitor driven LED is relatively easy to damage, easily breakdown, and power consumption than the cross flow
- Q:What does "A19" mean in LED A19 bulb?
- A stands for bubble type, A hemisphere bubble19 the numbers in the back indicate the size of the bulb (mm in diameter)On the market LED bulb generally has: hemisphere bubble lamp, A15, A17, A50, A60Global bubble G45, G55, G80, G120 and so on
1. Manufacturer Overview |
|
---|---|
Location | Shenzhen,China |
Year Established | 2011 |
Annual Output Value | |
Main Markets | Mid East;Western Europe |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen |
Export Percentage | |
No.of Employees in Trade Department | 20 People |
Language Spoken: | Chinese |
b)Factory Information | |
Factory Size: | Above 4,000 square meters |
No. of Production Lines | About 6 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Cheap |
Send your message to us
Factory 2 Years Warranty LED Lamp PC Cover High Quality Aluminum 6W E27/ E26 450lm 85-265V LED Bulb Light
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 20PCS pc
- Supply Capability:
- 200000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products