Facade Scaffold System FAS with layher style CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FAS

  • Type: Facade scaffold

  • Surface: paint/electro (hot dipped) galvanized

  • Material: Steel/Aluminium

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description 

Model No: FAS

Model Name: Facade Scaffold System

3.Features:

1. Made of high strength steel tube
2. Including:

1) Frame: 2000/1500/1000mm(H)x732mm(W)

               1000/666mm(H)x732mm(W) with connector

2) Clamp Horizontal: 1572/2072/2572/3072mm(L)

3) Single Beam: 700/1056/1540/2040/2540/3040mm(L)

4) Double Beam: 1540/2040/2540/3040/4112mm(L)x435mm(W)

5) Brace: 2824/3209/3632mm(L) with single clamp

              4433mm(L) with double clamp

6) Safety Gate: 696mm(W)x464mm(H)

7) Steel Plank: 690/1046/1530/2030/2530/3030mm(L)x320mm(W)

8) Aluminium platform ladder: 2530/3030mm(L)x610mm(W)

3. Surface finish: painted/electro (hot dipped) galvanized or to be order

4. Also can manufacture it as your requirement

 4.

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Facade Scaffold System FAS with layher style CNBM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction technology measures fee is directly into the sub - project costs
Division of project costs only include human labor costs, materials, machinery, business management fees and profits
Q:The name of the laws and regulations relating to the building, at least 100, The The
Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
Q:How to do a good job of typhoon during the mass transfer mobilization work
Such as: all kinds of dangerous housing, plant, shed, temporary buildings (such as walls, etc
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:71.0-kg painter is on a uniform 22.0-kg scaffold supported from above by ropes. How close to the left can he approach safely?
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ◄ (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ◄ Hope this helps!
Q:How long do you have to wait before you can take a scaffolding piercing out for short periods of time?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ​​the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
1) In three seconds the paintbrush accelerated to a speed of 96 feet/sec (ignoring air resistance) at a acceleration of 32 feet/sec/sec. 2) It started at a speed of zero, so the average speed for those three seconds was 48 feet/sec. 3) 3 seconds times 48 feet/sec. equals 144 feet.
Q:What kind of insulation materials and equipment are allowed to be imported in China?
What kind of insulation materials and equipment are allowed to be imported in China?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range