Export Scaffold props / telescopic steel prop / blue color prop 2.2-4M

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1680 Piece/Pieces 1680pcs / 20'FT container pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.     Length 2200-4000mm 

2.     Outer tube diameter 56mm 

3.     Inner tube diameter 48mm 

4.     Tube material : Q235 

5.     Tube thickness  : 2.0mm

6.     weight :  11kgs  

7.     square  plate : 120*120*4mm 

8.     Italian type nut 

9.     G-pin 12 

10.    Painted surface 

11.    Color : as customer 's request . red / blue / green / orange/ brown 

 

Packaging & Delivery

Packaging Details:packaging :50pcs / bale container : 1680pcs / 20ft
Delivery Detail:20-30days after receive deposit

Specifications

Adjustable props / construction prop 
Height 2.2-4M 
Italy type painted props 

Adjustable props

Shoring props

Construction scaffold steel prop

Scaffold props

Telescopic steel props 

 

 

 

Product introduce          

 

 

Steel Prop is a labour and time saving device to support shuttering and centering.

It is made outer tube of 60mm (O. D.) & inner pipe of 48mm (O. D.)

or outer tube 56mm (O.D.) & inner pipe 48mm (O.D.)  , 

or outer tube 48mm (O.D.) & inner pipe  40 mm (O.D.)  moving in each other telescopically.

The surface has painted , powder , electric galvanized and hot dipped galvanized .

The height use of props by double staging is recommended upto 7000mm only .

Top and bottom plate are provided with nail holes for wooden beam or steel beam .

The top has square shape , flower shape or U-head , U-fork head .

U-head can use fix or adjustable .

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Steel support is now about how much the price
Steel support is now the market price is about 65 yuan / root,
Q:Steel beam, steel brace and steel purlin. What is the difference
Different steel beam, steel brace and steel purlin position, the strength of the material requirements are different, which plays in the role of different engineering.
Q:How much is the triangle angle support window, bearing?
Therefore, it is necessary to estimate the bearing capacity of the steel beam. Three thousand nine hundred and seventy-three
Q:What are the safety measures of steel support construction
Specification scaffold erection. The utility model is characterized in that the frame body and the building structure are fixed, the first step is fixed, and the frame body is completely closed, so as to prevent the falling injury and ensure the safety of pedestrians.
Q:What is the maximum value of the support settlement on the beam
Germany developed a method of strengthening reinforced concrete structures with steel plates, which adopts the double component epoxy resin adhesive steel plate or other steel piece pasted on the surface of concrete, constitute a concrete - steel composite adhesive three-phase system * by reinforced concrete member after pasting steel plate, can partly replace the reinforced by steel plate the role of * therefore, when the bearing capacity of reinforced concrete members due to insufficient or deformation, cracks affect the structure of normal use, can use adhesive paste to steel reinforced concrete members outside the appropriate location, to meet the bearing of #.
Q:What is the meaning of steel support flange connection
The erection and erection of the steel support of the building is dependent on the total length of each steel support
Q:How to adjust the ratio of steel support to X stable stress and strength design value
1, the replacement of the better properties of the cross-section (not necessarily increase the cross-section, to be specific)
Q:Subway construction of steel support needs qualification
But in general, because many such systems in order to cooperate with the construction of the environment, may also have existing ground sections, so usually covers the metropolitan area of all underground and on the ground of the high density transportation system.
Q:Steel support can not be removed if the deformation of the foundation pit, how to solve
The general situation is definitely the deformation of the foundation pit, but need to infer the specific numerical monitoring of foundation pit is caused by the direction in which the force, do not rush forcibly removed, need to convert excavation system detailed, and then backfill removed, it is recommended to contact the design unit analysis solution, and as soon as possible!
Q:For the deep foundation pit supporting steel purlin supporting scheme of a
Construction sequenceThe pile axis positioning, U type steel sheet pile, steel sheet pile on both sides of steel purlin installed to dig to the bottom, soil structure construction, soil filling, U type steel sheet pile, the extraction of 5 operating baseline determination: Construction of foundation pit construction need to leave Longmen frame fixed axis working face to determine the position of steel sheet pile construction fixed pile position according to the order of the steel sheet pile concrete pile with marked gray line marked the plate pile driving by self vibration type steel sheet pile special mechanical plug

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range