Explosion-proof Air Conditioner

Ref Price:
$4,500.00 - 5,500.00 / set
Loading Port:
Shanghai Port
Payment Terms:
T/T
Min Order Qty:
1 Pack set
Supply Capability:
10 Pieces per Day set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1)For explosion-proof wall air conditioner, both single cooling and combined heating and cooling products in T1, T2, and T3 are available, to meet different requirements of low, medium and high temperature zones worldwide.

 

2)Explosion-proof wall air conditioner is developed on basis of normal product of MITSUBISHI, Carrier, O GENERAL (FUJI) or GREE brands, by taking explosion-proof measures to indoor and outdoor units.

Measures to outdoor unit: by taking special technics and control, conduct explosion-proof treatment to internal control units, compressor, outdoor fan motor, protective system, heat-removal system, cooling system, etc. Besides, explosion-proof control box and sensor system are coped with intrinsic safety. The outline dimensions and installation are the same as the original ones after explosion-proof treatment.

Indoor unit: by taking special technics and control, dismantle internal electric control units and re-design to explosion-proof structure which enables seperate explosion-proof control box. Remote controller and sensor system are coped with intrinsic safety. The outline dimensions and installation are the same as the original ones after explosion-proof treatment.

 

3)Remote controller provides 3V intrinsic safety power through circuit boards within explosion-proof control box; without need for battery and it is fixed directly on ex-control box, which facilitates operation.

 

4)Normally, rated voltage is AC220V/50Hz.  Other voltages are available, such as AC220V/60Hz, AC230V/50Hz, AC230V/60Hz, AC240V/50Hz, AC240V/60Hz etc. Please specify when ordering.

 

 

Quality Control Introduction

Quality is the life of an enterprise; we follow strictly the stipulation of ISO9001:2008 Quality Management System: requirement for manufacturing, standard f or inspection, record for processing, traceability for responsibility, correction for misplay, prevention to latent fault, continuing improvement.

The quality management is a direct responsibility of the General Manager; we have set up the quality inspection department, the inspection and testing center, the measurement center, and the quality management department internally, and we follow one authority principle, consistent responsibility and power principle, and non-vacancy and non-overlapping principle to ensure the authority and the uniqueness of quality control.

We are an organizational member of "China Product Quality Association", Our product has been awarded "National Product of Stable and Certified Quality" and our quality management organization has been awarded the title of "Advanced Quality Management Enterprise" and our Inspection and Testing Laboratory has been the first in the industry that evaluated by "China Petroleum and Chemical Industry Association" as an "A Grade Quality Inspection Organization of Petroleum and Chemical Enterprise".

We are not only paying attention to the quality control during the manufacturing process, we pay more attention to the outgoing inspection before our products leave the factory. We make sure that each product must go through various inspection and testing items before it leaves the factory, and only those qualified after inspection and test are allowed to leave the factory.

 

Electrical Laboratory

The electrical laboratory can perform various tests, including: Glow-Wire Test, Tracking Test, Needle Flame Test, Insulation Resistance Measurement, Voltage Withstand Test, Low Resistance Measurement, Contact Resistance Measurement, Earth Resistance Measurement, Lithium Battery Inner Resistance Measurement, and LED Luminous Flux Test and Measurement.

 

 

Mechanical Testing Center

The mechanical test center is equip ped with C omputerized Universal Hydraulic Testing Machine, Micro-processed Spring Dynamometer, and Impact Testing Equipment. Various tests and measurements can be performed in the center, such as Material Strength Measurement (yield strength, and tensile strength, etc.), Pulling Force Test, Tempered Glass Impact Test, Spring Force Measurement, Rubber Hardness Measurement, and Material Hardness Measurement.

 

Environmental Testing Center

Various Inspections and tests can be performed in the Environmental Test Center, such as Rubber Aging Test, Dust Protection Test, High & Low Temperature Test, Damp Heat Test, Low Temperature Environmental Simulation Test, High Temperature Environment Simulation Test, Anti-Corrosion Test, and Adhesive Force Test of Plastic Coating, etc.  

 

 

Material Analysis Using Spectrometric Analyzer

Imported directly from Germany, the Full-Spectrum Spark Direct Reading Spectrometric Analyzer enables us to perform micro constituent analysis for the three basic materials of copper, aluminum, and steel, and the analysis of various constituent can be completed in mere 10 seconds.

 

 

High Precision Image Measuring Instrument

High Precision Image Measuring Instrument utilizes the principle of microscope image projection, it can be used for two dimensional and three dimensional precision measurement and flameproof thread measurement. This instrument has self calibration module, and the measurement accuracy can be as high as 5 micron.

 

 

Measurement of Luminous Intensity Distribution Curve

The Distribution Photometer is used for measuring the luminous intensity distribution curve of various lighting fixtures, it can satisfy the latest requirements of domestic and international standards; it can perform functional measurement for various luminous intensities, and it is suitable for luminous intensity test of different types of light source. This Distribution Photometer is controlled by computer with automatic focus adjustment, so the distribution curve can be finished in one run.   

 

Production Introduction

After over twenty years development, the company has founded the explosion-proof manufacturing base in Jiading of Shanghai, China, with land coverage of 150,000 square meters and a building coverage of 160,000 square meters. It has over 2,500 production workers with an annual production capacity of 300 million USD.

There are seven units within the production department, including Export Production Unit, Die-Cast Unit, Fabricating Unit, Electric Appliance Unit, Piping Unit, Fan Unit, and Plastic Unit, forming an all-in-one explosion-proof apparatus manufacturing system.

The Exporting Production Unit is focusing on producing explosion-proof products for exporting that are complied with IEC, EN and GOST standards. The unit is directly under the management of the Foreign Trade Division of the company and is operating within the Quality Management System of ISO9001, IECEx/OD005 and ATEX/EN13980.

We believe firmly that the quality is controlled in the process, an d we apply a variety of inspection equipments, inspection measures, and management mode to ensure the quality of our product through delicate elaboration.

 

FAQ

Q1:Why is it important to use home air conditioner filters?

A:Without them you can clog up vital parts of the heating or cooling components that can be difficult to clean out and can cause severe damage that will be much more expensive to repair than the inconvenience of replacing a filter once a month.

 

Q2:What is VRF Air Conditioning System?

A:VRF air-conditioning systems owe their growing popularity to their ability to meet a wide range of requirements.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Air conditioning power consumption how to calculate
Power consumption is to basically see the power of compressor, the compressor power = refrigerating capacity/energy consumption ratio, the general air conditioning energy consumption ratio is greater than 3, so 1 piece of electric power is 735 w, general data 1.5 horse power is the power consumption of about 1100 watts 735 * 1.5, which is about 1 hour and 1.1 KWH, in addition to the compressor, and a fan or other motors require electricity, a total of 1 hour is 1.2 degrees or so. The most simple way to look at the instructions on the input power is how many kilowatts of power, the power consumption is 1 hour
Q:Household air conditioning open is how liquid?
2. You have to open the valve installed on empty: Specific as follows: Fixed the inside and outside the machine, connect the air conditioning is good, mainly is to put the inside and outside the machine connecting pipe are tight, attention must be connected, in case of refrigerant leakage. With a hex switch to the automatic air conditioning work normally open thin tube (valve), high pressure valve in the hexagonal to resist to add fluoride mouth thimble (add fluoride mouth on the low pressure), make the ran out of gas, it is ok to 10 seconds, don't be too long time, so as to avoid the snow kind of run too much. So you can make the line of the air inside . Then put the high and low pressure valves are open, the inside and outside the machine electricity the power cord is ok. Note: the connecting pipe is copper, and cannot be bent into death, otherwise it will affect the flow of refrigerant, cause not cooling and heating. When need a fluoride, otherwise it will cause leakage of fluorine..Boot to lowest temperature, shut high-pressure pipe
Q:Household air conditioning not refrigeration is how to return a responsibility?
Will tell from what you said should be a machine outside the heat dissipation is not enough, cause compressor protection, because of the high temperature at noon, so noon when he jumped, dirty don't dirty outside the machine you can see, you change the fan capacity, should be decreased capacity.
Q:The residential air conditioning machine within the power supply and power supply?
The first indoor parts are usually made of 220 v electric power supply to the transformer - control main board - seg. Actually, the power supply is controlled by the indoor machine of outdoor mainboard control 220 v power on and off. There are a few models is the direct outdoor on 220 v power supply controlled by the indoor machine control main board 12 v or 24 v direct current control of the ac contactor to outdoor open or stop the outdoor but now the mainstream models are adopted.
Q:Work of the central air conditioning ways and what's the difference between a home air conditioning works
System structure Common household air conditioning is usually yituo one: a corresponding outdoor indoor machine. And household central air conditioning can do yituo: an outdoor can connect multiple indoor machine.
Q:Household central air conditioner and what is the difference between ordinary household air conditioning?
Many of the hanging in a beautiful residential outdoor, the streetscape, running noise, especially in the night, starting and stopping of the noise, air flow noise makes it difficult to fall asleep.
Q:Air conditioning use how long and snow?
Air conditioning how long need to add fluoride is a direct relationship between the and the installation of air conditioning, installation of good a don't need to add five to six years. Your air conditioning not refrigeration also is not necessarily the lack of fluorine. If you can check our before please maintenance workers to: 1. Look at the air filter dirty don't dirty 2. Let me check if the voltage is normal. 3. See if both inside and outside fan operation. 4. Listen to the outdoor compressor is working. If you check if the normal, wonder if leakage fluorine, before adding fluorine must check the freon missing from there, otherwise even added also use for a long time not appear the same problem again.
Q:Choose frequency conversion air conditioning and fixed frequency which is more suitable for me?
You and I think about, may I buy air conditioning in the bedroom with what air conditioning thought for a long time and then decided to buy the frequency conversion. Personally, frequency conversion air conditioning or a better one, the first thing I consider is quiet, frequency conversion air conditioning does not stop after running, when the temperature reached a predetermined temperature, it can operate at low frequency, will not have the air conditioning that decide frequency that frequent key sound; Secondly, considering the bedroom use, frequency conversion air conditioning temperature control is better, reach the predetermined temperature, will always maintain the temperature, the fluctuation amplitude of the human body basically can't feel, more comfortable. In addition, frequency conversion air conditioning energy consumption is low, how much energy is not by how many hours a day to see, this is meaningless, depends on the frequency conversion air conditioning and air conditioning that decide frequency run 5 hours at the same time, the energy consumption is much better than, I think, on more than two hours, there is gap, after all, the air conditioning that decide frequency peak power of every time they start running, and the air conditioning that decide frequency just began to use the highest power, once to the expected temperature, low power operation, now, the average frequency conversion air conditioning can almost in about 20 minutes to the expected temperature, moreover each time the air conditioning that decide frequency start has an impact on the voltage, this is have effect on other appliances. In a word, I prefer to talk a little money to buy a frequency conversion, air conditioning, after all, is not something with a one year two years.
Q:Air conditioning general under the condition of high and low pressure is normal?
This depends on the specific condition and the air conditioning refrigeration and heating of freon types, year-round operation under different indoor and outdoor temperature is not the same. Refrigerant R22, for example, if the cooling when outdoor temperature is 35, indoor temperature is 26, the air conditioning condensation temperature is about 50, corresponding to the high side pressure of 1.944 MPa, evaporation temperature of 6 degrees, corresponding to the low voltage side pressure of 0.6028 MPa. When heating, high and low pressure almost 1.3557 MPa and 0.5314 MPa.
Q:The central air conditioning or family air-condition good family
In the central air conditioning is good - the central air conditioning and fission machine total power consumption Average power consumption of the air conditioning that decide frequency at around 8 KW, while relatively save electricity conversion model at about 6.5 KW; Household central air conditioning, use more power saving digital models about 5.5 KW power consumption, so for many residential room, household central air conditioning than general household air conditioning power saving 30%, long-term use cost less than ordinary fission air conditioning Install the central air conditioning home is good, in general, household central air conditioning is the generalization of modern residential trend. Although at the beginning of the household central air conditioner investment slightly tall, but now have the ability to buy more than one console of consumer groups are gradually convert consumption idea, after all, the price of the household central air conditioning and fission machine price gap has more and more small, relatively speaking, consumers are more willing to pursue household central air-conditioning brought about by the high quality and comfortable life.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range