EVA Plastic Water-Stop for Road Railway Highway Tunnel

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
888 m²
Supply Capability:
280000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The description of EVA Plastic Water-Stop for Road Railway Highway Tunnel

EVA plastic water-stop is made by the optimal level of ethylene vinyl acetate resin and various kinds of chemical additive, via extruding etc. Processes. It makes full use of the flexibility of ethylene vinyl acetate resin, has good characteristics of anti-leakage and impermeable effects in the tectonic seam, and it is characterized by durability, good corrosion resistance.

 

EVA Plastic Water-Stop for Road Railway Highway Tunnel

 


Property of EVA Plastic Water-Stop for Road Railway Highway Tunnel
Good abrasive resistance, corrosion resistance, durability, deformability, water-proof etc.


Application of EVA Plastic Water-Stop for Road Railway Highway Tunnel
EVA plastic water-stop is mainly used for the foundation engineering, be set within the construc-
Tion joint and deformation joint, forming one integration with concrete when concrete pouring.
Such as tunnel, culvert, diversion aqueduct, retaining dam, liquid storage structure and under-
Ground facilities, etc.


Production Standard of EVA Plastic Water-Stop for Road Railway Highway Tunnel:
Provisional technical condition of waterproof material for railway tunnel use Part 2, waterstop

Area


Application of Geosynthetics 

Hydraulic

Lagooning and Water Treatment, Ornamental Ponds, Golf Courses Aquaculture and Desalination Water LagoonsTanks, Reservoirs, Liquid WasteFloating Cover SolutionsDrainage and FiltrationShading Cover Solutions

Environment

Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers

Civil Works

Erosion Control, Secondary Containment, Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.

Building

Parkings,Roofing,Soundproofing building

 

FAQ of geosynthetics :

 

What is geosynthetics ?

 

Geosynthetics form a perfect erosion control fabric used extremely widely in civil engineering to stabilize and reinforce slopes and soil under or next to roads, railways, dams, water reservoirs etc.. They can be easily applied which minimizes the time of construction, as well as they limit the resources and materials necessary.

 

What kinds of geosynthetics we have ?

 

Non-woven geotextile, geogrids, geocells, GCL, Geomembranes, Geonets, Geocomposites etc .

 

What is the geosynthetics used for ?

 

Hydraulic

 Lagooning and Water Treatment, Ornamental Ponds, Golf Courses

 Aquaculture and Desalination,Water Lagoons,Tanks, Reservoirs, Liquid Waste,Floating Cover Solutions, Drainage and Filtration

 

Environment

Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers

 

Civil Works

Erosion Control,Secondary Containment,Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.

Building - Parkings,Roofing,Soundproofing

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the car material so that the car can be waterproof, in the rain will not leak in?
Engraving process car sticks A. knife engraving process: refers to the computer will be vector graphics input knife machine, the knife will be cut into a preset film shape, and then by hand will be different colors together Finished, and finally in the finished product posted on the surface of a layer of transparent transfer film, after the stickers to remove the stickers; due to knife car paste production process is complex, high cost of materials, currently only suitable for individual car and Che Youhui team Small customization
Q:Villa roof leakage what general reasons, what materials to remedy
Fourth, the roof of a large area of ​​leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, but also And then covered with insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.
Q:Hello, roof with SBS waterproof material bulk density is how much?
Similar to styrene-butadiene rubber, SBS can be in contact with water, weak acid, alkali, etc., with excellent tensile strength, surface friction coefficient, low temperature performance, excellent electrical properties, good processing properties, as the current consumption of the largest thermoplastic Elastomer.
Q:Waterproof mortar expensive or dry mortar expensive
Dry mortar is usually called hydraulic cement mixed mortar, refers to the dry sieve treatment of aggregate (such as quartz sand), inorganic cementing materials (such as cement) and additives (such as polymers) and so on a certain proportion of physical mixing Into a granular or powdered, in the form of bags or bulk transported to the site, add water, mix directly after the use of materials.
Q:A complete set of basement waterproof construction program
Second, the basement of the external walls of water leakage construction preparation 2.1 Technical preparation 2.1.1 Selection of construction methods Waterproof engineering is related to the use of the project an important indicator, it is the construction process of a key project, difficult engineering. The choice of construction methods and programs has a direct impact on the quality of construction. The underground wall of the project SBS waterproofing membrane with hot melt method full construction. 2.1.2 before the start of the project, the first organization of engineering and technical personnel to enter the construction site, to understand the situation, to further understand the characteristics of the project to solve the contradiction between the construction technology and the implementation process. 2.1.3 technology before the end of the construction of waterproofing works by the professional foreman in accordance with the construction drawings and the existing national norms require the actual situation of the project to the construction team in writing to the end. The contents include construction site, construction sequence, construction technology, construction level, node fortification method, enhancement site and practice, project quality standard, guarantee the quality of technical measures. And after the field technical person in charge of the strict implementation of the audit.
Q:What is the price of a waterproof window cover?
The benefits of window sets (1) the most important role of the window cover is to protect the role of the window. Because long-term use is easy to make the window side of the phenomenon of damage, and window cover made of wood, can play a good anti-collision protection. (2) the design of the window cover to a certain extent also played with the door sets, baseboard echoes the effect, because they are with the whole space, the common bear the role of income side. (3) window cover is the form of the windowsill match, we shop a piece of marble and the like things on the windowsill, often feel more monotonous and abrupt. Plus hood, the feeling will be more complete. Window cover style features: window cover and the door is echoes, in general, if the door is no door sets, then the window does not need window sets; the other hand, if there is no door sets and no window cover, there is a no completed The feeling that, in most cases, the requirements of the style of the window cover and the same door uniform.
Q:I would like to ask how to do in the warm water above,
Do not know why you are in the floor to do the top of the waterproof? The We are here in the northeast of the winter is very cold, are warm, no one to warm the ground to do the above water, I think you over and over again, ah, no need, every family is warm, you have to do waterproof in the above is afraid of soaking your floor or tiles Bubble? The If the pipe really leaked, did not use the waterproof, the first warm tube must be selected, followed by your shop is good or bad, workers, water, are very important, you focus on this line on the line
Q:How does the finished ventilator manufacturer waterproof?
In the latest country set JJCJ33 clearly stipulates that the structure to be waterproof, refers to the internal ventilation of all nodes and ventilators and roof all the nodes,
Q:Roof leakage, what materials do the best waterproof
Treatment is: large cracks available plugging the king, a small crack can be used to fill the glass glue, repair with a wall waterproofing agent, after spraying a few words on it. As the external walls of cracks and cracks need high-altitude operations, the public must ask the professional construction team to deal with, to prevent accidents. Roof leakage what materials: available SBS modified asphalt - polyester film coil, polyester film SBS-3mm, laying the coil. Roof waterproofing membrane, in addition to SBS modified asphalt, there are three EPDM coil, neoprene. Can also use architectural ointment, cement, polyurethane coating. You can also use asbestos net also do waterproof. If the cement roof cracks, I suggest you use cf-2000 efficient composite waterproofing agent. In the concrete like scraping putty scraping 5mm thick again, you can play a waterproof repair function. Can also slot repair.
Q:Developers have done waterproof, decoration house also have to do it
so, in your house When the decoration, or should do a waterproof treatment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range