• Europe standard German quality high-quality 60mm upvc window profiles System 1
  • Europe standard German quality high-quality 60mm upvc window profiles System 2
  • Europe standard German quality high-quality 60mm upvc window profiles System 3
Europe standard German quality high-quality 60mm upvc window profiles

Europe standard German quality high-quality 60mm upvc window profiles

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
1000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Our company was established by a German company in China in 1999. It is a professional manufacturer of U-PVC Window & Door profiles.Our brand was established in Germany in 1933 and it has a history of over eighty years. Our company is famous for excellent product design and consistent high quality. We own a good reputation in Europe and all over the world. Our company is one of the most famous Window & Door profile brand in Germany. 


Being an expert of German quality upvc profiles, our products strictly follow European standard unremittingy,  for which we stick to to products quality at every stage of manufacturing process. To attain consistent quality, Our facility is equipped with technologically superior German 

equipment.We have cooperation with international well-known enterprises, such as US DuPont, Renolit, SABIC, which provides high quality color products for construction windows and doors.




We offer 6 products series: Lotos, Komfort, Peony, Edelweiss, Contour and Elegance, comprising 60mm, 70mm, 88mm, 107mm, 108mm and 127mm profile for sliding and combined windows and doors. We provide high-UV resistant white profiles, color coated profiles, colored body profiles. 


uPVC Sliding System

uPVC Casement System

Window Sliding System –  (60mm)

  • Suitable for all weather conditions.

  • High weatherability, high malleability, pollution-resistant

Window Casement System –(60mm)

  • Suitable for all weather conditions.

  • High weatherability, high malleability, pollution-resistant

Sliding System 

Window Sliding System – (60mm)

  • Suitable for all weather conditions.

  • High weatherability, high malleability, pollution-resistant

Special Windows

Tilt & Turn Window System  (60mm)

  • Suitable for all weather conditions.

  • High weatherability, high malleability, pollution-resistant



For more details, please contact us.

Q:Do you want to eat the windows and doors?
Door and window out of the plaster is to eat a little window frame, probably the principle is: the wall plastering door frame 5 mm or so, elegant approach should be silicone edge (where you are rough delivery). Wiping the surface of the laminated window frame is not greater than 1 cm, pay attention to the edge of the silicone must be, here is the weak water seepage.
Q:The first powder wall or the first door frame. What are the provisions? Or what is the reason for admiration. Questions added: the door is big and small. How to deal with. Whether the door frame is measured one by one. Uniform size will be a box does not match the problem. More
In the order of construction, it is certainly the first installation of the doors and windows, the doors and windows frame installed and then paint, cement mortar to cover the edge of the window frame. This approach is both beautiful and solid. Even if the interior decoration to replace the window, the same is the first installation of the window frame with mortar after the painting. ---------------------------------- For your supplementary question, I think you should not be inside the family A few doors and windows of the problem, but in the construction of the bulk of the business, which should be a drawing, can be constructed according to map. People also in accordance with the size of the drawings to stay out of the doors and windows of the hole, you can follow this size, combined with the actual situation of the installation of appropriate to narrow some, as a result of the door frame to determine the size of outsourcing; in order to avoid the occurrence of errors, you can go Site targeted field measurements, such as a specification of the hole to measure a few, so there is no need to measure a one by one.
Q:Engineering materials inside the windows and doors hidden when to do? Is done in the main construction, or do the decoration when the doors and windows to do the decoration?
In the installation of doors and windows to do.
Q:Rough leveling how to use?
Before the construction should measure the wall to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the Pratt thick rough construction thickness from 5mm To 50mm are suitable. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. Prades without formaldehyde rough leveling is a one-component powder products, according to the requirements of the amount of water (about 45%) can be used evenly stirred. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be filled in advance. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". Adjust the "slurry" should be within 30 minutes on the wall, in the grassroots first thin scraping again, the purpose is to make the material and the grass-roots contact between the full. And then approved on the wall enough to adjust the "slurry" with a 2m long by a one-time scratch can be. Indoor pillars, the location of the wall angle should be increased Prades Corner, the height of not less than 2m.
Q:Aluminum alloy doors and windows frame how to tear the film
Highest heat treatment! Remember, do not scratch with a blade!
Q:Broken bridge doors and windows series 60 what meaning
Broken bridge doors and windows 60 series refers to the aluminum alloy profiles with insulation profiles and doors, window frame thickness of the size of 60mm doors and windows. According to the "aluminum alloy doors and windows" GB / T8478-.1.4 product series to the door, window frame in the depth of the design of the hole size - door, window frame thickness of the structural size (code C2, in millimeters) division. Door, window frame thickness of the size of the construction in line with 1 / 10M (10mm) of the number of building sub-series of values for the basic series; basic series by 5mm into the value of the auxiliary series. Door, window frame thickness When the construction dimension is less than a basic series or auxiliary series value, mark the product series at the previous level less than the series value. (Such as the door, window frame thickness of the structure size of 72mm, the product line for the 70 series; door, window frame thickness of the structural size of 69mm, the product line for the 65 series) so 60 series refers to the door, Depth direction of the design size - door, window frame thickness of the structure size of 60mm broken bridge refers to the aluminum alloy profiles with insulation profiles.
Q:On the provisions of stainless steel railings weld
There is no rigid rules on the seam on the welding, no seam as little as possible welding, solder joints small
Q:My house is not yet in the house, but now in the decoration stage, but found the north of the bedroom windows (plastic windows) on both sides and both sides of the phenomenon of rainwater (rain 2 days or so there is water), developers have worked once but did not improve , Now looking for him to repair, but also an excuse for rainy day construction has been dragging, worried that I brush a good wall paint repair, affecting the decoration, so I want to repair their first solution. I do not know how to repair it? Thank you. : Figure more
I see your picture, I see the external walls of water leakage, the windows are generally in the window below the water, your upper and sides, as well as the left side of the window so far, there are leaking, should be the wall leakage, I suggest you Buy waterproof treasure (liquid) on the outside brush 2 - 3 times, the window on the four sides made waterproof plastic, can only be the case
Q:How to calculate the cross section of the door frame, there is no picture or schematic, the problem added: window frame, sash section how to determine? More
The window is divided into the open, the profile section will be different, I can not upload the map, the easiest way, with buckle (that is, that can be removed to install the glass, Bahrain and then the article is the fan, Is the box. The second method, the inside of the window, L-shaped frame is the type, Z-type is the fan; outside the window is T-type box, Z-type fan. The door of the same. Calculate the words you can go online to search the European standard notch profile of the profile,
Q:Paving mosaic construction process
Double gull nostalgic mosaic can be used for indoor and outdoor floor and wall decoration. For construction paving, the most critical job is to prepare the surface of the site. Tiles must be in the horizontal and vertical angle are accurate and accurate paving, so as to avoid problems. Paving the surface must be clean and dry. Paving materials: the market has a professional mosaic tile adhesive and sealing agent, there are two-in-one tile glue. Color is also a variety of points, according to different needs with the use of cement and sealant. The most widely used is white and black. Paving tools: grouting floating, large bucket, V-shovel, hammer, small bucket, pliers. Paving steps: 1. In the vat inside the mixed powder-like mosaic tile glue, stirring at the same time by adding water until peanut butter to achieve similar viscosity. 2. In the construction of the wall, then use the v-type shovel. Each post a paste From the middle of the patch area to start paving out. In the wall with the horizontal line and the vertical line for the mark, you can make the gap between each paste evenly. Hand the appropriate force to the mosaic into the tiles inside, so that mosaic and ceramic tile full contact. 3. Paste finished or close the mosaic, you need to paste a paste on the match mosaic. With a piece of wood and a hammer, gently tapping to adjust the position of the mosaic. Need to pay special attention to the edge and connection of each mosaic. 4. If necessary, adjust the mosaic position in time before the mud is dry. 5. Allow the mud to have a 24 hour posture before filling. 6. Dry the sealant for 10-20 minutes, then gently wipe the mosaic surface with a piece of wet sponge. 7. Finally, wipe with a piece of lint-free cloth out of the mosaic surface of the remaining cement and caulking agent.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords