Escalator Power Lock

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
10 Pieces pc
Supply Capability:
8000 Pieces per Quarter pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Packaging details: As you required! & Delivery

Specifications

a.Special used for escalator

b.Certification:CE&ISO9001

c.MOQ:1-10 pcs

d.Good quality

eManufactor

We can provide you all kinds of escalator lock.

YOUR CHOICE:

1.We  are able to supply you a large variety of elevator components/ escalator parts of different

  brands(a selection of more than2,000 kinds).

2. We can guarantee the product high quality, delivery time and good service.

3.We are able to manufacture according to your specific instructions and help you select appropriate

  product and specification for you.

Looking forward to your inquiry! 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What parts of the elevator water will normally damage?
Mainly from where to see the water, where to flow, not the water will be bad
Q:The elevator does not need to be sealed
Why is it? Safety or the door lock what did not come? What did not come to the closure of what to trace the hundred grams of knowledge for a long time Huan Bao magic chant hall door and car door not sealed with insecurity
Q:Elevator overweight crushed what parts are broken need to repair how much money
Generally weighing off bad, not much money, generally more than 100
Q:Elevator hoist inside the iron frame how to build, that is how to put the parts to the top of the
Do you know that there is a hook on the top? Bearing capacity is generally 2 tons. At first start the bottom of the car. Then people stand on top. Pull up the hook. People to pay ridge barnyard jealousy Huan half of the newspaper only began to install rails. Ring beam and so on. The
Q:What are the contents of the installation of the elevator floor door components?
Simply put, for the following three elements: 1, hall door to install 2, the door on the door to install 3, hanging door
Q:Elevator warranty period specified reference standard?
According to the Regulations of the Ministry of Construction on the Implementation of the Interim Provisions on the Strengthening of Elevator Management issued by the Ministry of Construction in 1995 (1995), the newly installed elevator warranty period is one year from the date of acceptance or delivery to the site 18 months as the basis, this is the only known for the elevator warranty period of national documents. Of course, you can also supply and demand consultation between the two sides agreed to extend the agreement with the agreement to extend the elevator, if no agreement, in accordance with the provisions of the Ministry of Construction No. 167 provisions.
Q:Elevator water damage
Because your personal fault to damage the elevator is the need for compensation, of course, can also find someone to repair to the safe use of standards
Q:What is the highest part of the elevator car roof?
It is simple to say that the elevator reaches the top floor, the closest part to the top floor
Q:Elevator three pieces
Host traction machine control cabinet motherboard and so on
Q:Which parts of the elevator change is the transformation of it
Parts adjustment parameters Adjust the following parts to change the model, specifications, so that the right column lists the elevator parameters and other content changes, should be identified as the transformation operations: speed limiter, safety gear, buffer, door locks, rope combination, Traction machine, control cabinet, fireproof door, glass door and glass car wall, upstream speed protection device, safety circuit with electronic components, hydraulic pump station, speed limit shut-off valve, electric check valve, manual drop valve, mechanical (The main wheel, the secondary wheel), the metal structure, the handrail belt, the escalator or the moving walkway, regardless of whether the parts listed in the left column are changed or not, The following parameters and other changes should be identified as the transformation work: rated speed, rated load, drive mode, speed control mode, control mode, lifting height, running length (on the sidewalk), tilt angle, nominal width, explosion proof, , The weight of the car see the mechanical and electrical special equipment installation and maintenance of the maintenance of the rules of the annex
Our products are more than 10000 items and the inventory is more than 5 million pieces. We strive to survive on the basis of quality and credit. Our mission is "Customer Orientated, Service First". Welcome new and old friends to visit our website or contact us directly!

1. Manufacturer Overview

Location Beijing,China (Mainland)
Year Established 2009
Annual Output Value US$2.5 Million - US$5 Million
Main Markets South America; Southeast Asia; Africa; Oceania; Mid East; Western Europe
Company Certifications ISO 9001:2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 11% - 20%
No.of Employees in Trade Department 6-10 People
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range