• Engineering Construction Durable Concrete Placing Boom System 1
Engineering Construction Durable Concrete Placing Boom

Engineering Construction Durable Concrete Placing Boom

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Engineering Construction Durable Concrete Placing Boom



PARAMETERS


Manual concrete placing boom parameters

Specifications

12meters  

manual

15meters  

manual

18meters

manual

The big  arm design

Dual channel

Dual channel

Dual channel

Radius  of gyration (m)

12

15

18

The height  of the placing boom

5

5

5

Diameter  of conveying pipe (mm)

125

125

125

Leg span  (m)

3.2*3.2

4*4

4*4

Rotation  Methods

Manual

Manual

Manual

The  whole weight (kg)

1100

1200

1300

With  weight (kg)

600

800

1000

Slewing  bearing type

315

315

380

Material

Channel  

angle

Channel  

angle

Channel  

angle

Slewing  range

360°

360°

360°



CHARACTERISTICS


1. Frame arm structure, increasing the loadingcapacity and stability.

2. Highquality rotary bearing, flexible rotation

3. Doublesupporting leg, improve the stability and bearing capacity of double

4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron

5. Minimal impact on the appearance of vibrationforce

6. Withfour rope, ensure that the safety of product using.


PIPE SPECIFICATIONS


12M Concrete Placing Boom

Name

SpecificationsQuantity
Straight Pipe

3.67M

1

4.24M

1

5.6M

1

Delivery Bend

148-148 R275 90°

2

157-148 R275 90°

1

R500 * 90°

1

15M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.67M

1

5.56M

1

5.8M

1

Delivery Bend

275*90 add pipe

1

148-148 R275 90°

1

157-148 R275 90°

1

R500 * 90°

1

18M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.7M

2

3M

1

7M

1

Delivery Bend

R500 90°

1

R275 90°

1

R275 90° +130

1

157-148 R275 900

1


Delivery& packing & payment

1. FOB Tianjin or others.

2. Delivery time: within 15 days.

3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand

4. Payment term: T/T, L/C.

5. MOQ: 1 set or according the actual situation.




Q:What do concrete pumps and fabrics mean?
Pump truck, sub drag pump and automobile pump, drag pump delivery range is relatively large, the pipe can be used in the past (in the case of pumping pressure allowed), the disadvantage is that relatively cumbersome,
Q:What is a fixed concrete distributor?
Internal climbing concrete distributing machine is a kind of distributing equipment for high-rise building concrete construction. The ship borne concrete distributor is a special ship loading equipment for construction and design of harbors and docks
Q:what's the difference between the fabric pump and boom pump?
Boom pump itself has pumping function, cloth machine needs to buy drag pump matching use
Q:What is the Hand operated concrete distributor?
The distributor is reasonable in design, stable and reliable in structure, and adopts 360 degree full swing arm type fabric structure. The whole machine is easy to operate and flexible to rotate. It has the characteristics of high efficiency, energy saving, economy and practicality
Q:What are the benefits of concrete handling machines?
The concrete distributing machine saves 3-5 people and improves the construction efficiency by 2 times
Q:What is the structure of a concrete distributor?
Structure: bolt, and the vertical frame, which is fixed on the base part, through the slewing bearing and the top rotating part is connected on the main beam, and the balance arm, the balance arm rod, such that after the formation of the upper transverse rotating part
Q:What's the design plan of the concrete spreader?
The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes. The four section folding telescopic lattice truss fabric tape machine fabric tape machine design for a scalable (multiple) tape machine section four nested truss, by wire rope linkage, telescopic friction wheel and eccentric guide slide
Q:What is the working principle of the distributor?
The distributing machine is arranged at the center of each casting position, and meets the requirement of pouring position through the bent pipe and the hose
Q:What is the difference between concrete pump truck and concrete distributor in construction?
Pump car requirements of concrete and easy to better, concrete admixture pump agent
Q:How to distinguish tower type distributor and general distributor?
The big arm of tower type distributing machine is frame type, and the small square pipe is welded into a stable square frame, so that the big arm is firm and incomparable

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords