• Empty Water Cooler/ Vacio Enfriador de Agua System 1
  • Empty Water Cooler/ Vacio Enfriador de Agua System 2
Empty Water Cooler/ Vacio Enfriador de Agua

Empty Water Cooler/ Vacio Enfriador de Agua

Ref Price:
get latest price
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
10 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Designed with large and medium-sized internal enclosed heat exchange device,     

ac/dc motor has good cooling effect, convenient installation and maintenance, 

energy saving, etc. 

Working principle:
Cooler in the motor at the top or side, the agency is in a copper welding into 

the ventilation cabinet mount fan, cooling unit, and filters and other major parts.

Cooler and motor in and out of the wind mouth mutual alignment, line into a 

closed loop system.Its function is to produce the motor of the hot air to the heat 

exchange device for cooling, hot air and cooling water through the cooling device, 

rely on the special structure, cooler heat exchange between water, gas, and heating 

the air cooling, cooling water absorbs heat, through the circulation flow out of the closed, 

through constant circulation of gas, water, keep the motor temperature within the limits 

prescribed in the parts.Filter is to filter the wind road carbon powder in the wind the dust.

Designed with large and medium-sized internal enclosed heat exchange device,     

ac/dc motor has good cooling effect, convenient installation and maintenance, 

energy saving, etc. 

FAQ

We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served


Q:How can I get a claim from the power company for damaged electrical equipment caused by a power surge?
I have actually heard of that working in my home town, but it would vary with areas and power companies. Call your power company and ask. Be prepared to submit your damaged equipment and sales receipts.
Q:I might be starting a job doing industrial electric, and I want to make sure I can read the blue prints good. I am recently graduated from high school and have a vo-tech background in electrical, only no blue print reading. I know how to read schematics, ladder diagrams, and residential blue prints, but how different are industrial and residential blueprints? Does anyone know a site where I can look at some industrial electric blueprints? I know when i get there they will be able to teach me how to read it, but I figured I would try to save everyone some time and see what I can figure out before I get there.
What you really need is a good book. Get a copy of Ugly's Electrical References by George V. Hart. You need to know what the symbols mean as to what they physically are. Those blue prints won't be a whole lot different in some respects from what the residential blue prints are. Ugly's will prove to be an invaluable aid to you. When you get the job, if you don't understand something, ask, they expect you to not know a lot of things. You are going in as an apprentice, so you are there to do a lot of hard work, and to learn as you go. If you are given the opportunity to go to any schools, go. If you should get the chance to go to ant schools for fiber optics, go, in fact, seek it out for yourself, even if it means night school. The pay is great, and there is always a demand for those who are trained in fiber optics installation, and repair.
Q:I know water can damage electrical equipment, but why can water do this? I'm sure it has to do something with electricity and water. I seek an in-depth answer that will leave me with no doubts, or further questions, if possible.
Water is a polar molecule and in nature contain impurities which enhance it's conductive ability. So water become a conductor when introduced to electronic devices and electricity follows the path of least resistance, which is no longer the desired circuit. So with the electricity being conducted into places that are not desired it often causes components to fail by overloading them with power. Electrical equipment that gets wet while not connected to power often can be used provided it is allowed to dry out completely before power is applied. For example I have been know to put keyboards in the dishwasher and as long as I wait before I used them afterwards. But pour a cup of coffee into the ketbouard while in use and generally it is toast.
Q:I am an electrical engineering student ,but I dont know what to do when I graduate. I like music and I want to do something with music. I have heard of audio/sound or acoustic engineering, but I don't know exactly what an audio/sound or acoustic engineer does.
You could build electronic music instruments and effects. Amplifiers are another domain were first class talent is needed. All of this sounds easy but wait until you try and you will find that none of it is.
Q:Hi!Is there an NEC section which addresses the following kitchen design? I'm working with an apartment complex and they've designed each unit's breaker box to be located directly over the stove top burners. Something just sounds real bad here - but, perhaps I worry about things melting when water is brought to a boil or the oven is at 450 F for an hour or so and the vent for the oven is directly through a back burner. [The door for the breaker box just clears the top of the stove top.]Thank you!!
Since you already got another answer that didn't address your question directly. I believe there is a code that says there must be so many inches of clear floor space in front of any electrical service panel. I believe then that your example may violate that code and may not pass inspection if there is one in place for your area.
Q:I want to wire all my regular recepticles with #10 wire which I know I can use 30 amp breakers with. Does anyone carry 30 amp 120 volt recepticles or can I use the 20 amp recepticles? I can't get anyone at Home Depot in the electrical department to answer the phone. Best answer with a link to this item (if it exists) gets ten points. Please not a lowes link. I don't care to do business with them as I can never get anyone in my local store (Nederland, TX) to help me, while Home Depot has bent over backwards and done cartwheels to help me. Thanks.
using number 10 wire is extreme wasted overkill. It shows you probably do not know what you are doing. 12 is fine for 20 amps. that is plenty good for any hospital or commercial building unless each and every outlet is a dryer or a huge coffee maker. just trying to help.
Q:Are the different parts of an electrical distribution system connected in series or in parallel? Give the evidence. Give two reasons.
All equipment should get supply voltage same.So we have to connect all in parallel But to complete the circuit, we need Phase and neutral Bulbs, fans, washing machines, fridges are connected in parallel
Q:And what does electrical engineer teach in college? Is it good for girls?
Sometimes electrical engineering does involve computer science, but it depends on the school and the area of concentration. Electrical Engineers often do PLC programming for robotics and equipment. Both electrical engineers and computer engineers may work on developing circuit boards or computers. I know a few girls that studied electrical engineering. One of them got a job as a systems engineer for the SI organization, a large company owned by Lockheed Martin. Engineering is a growing field for women. With gender equality slowly getting better, more girls are gaining confidence in going for manly majors. There is almost no hands on work in engineering. You are not expected to know how to fix things. An engineer is a problem solver. The responsibilities of all engineers are the same regardless of job position or major. Their responsibilities are to invent, create, design, develop, improve, maintain, control, and sustain the following: -Products -Processes -Systems
Q:Can someone go into detail on this air force job? Don't just give me a website, I'm looking for actual experience or reasonable knowledge of this field. Would a civilian career be any good with this field? Please let me know! :)
Aiurcraft have electrical genarators on them, powered by the engines, those generators, provide power to aircraft electrical systems. You would be working on those electrical syatems, IE: the generators, the power transformers and wiring that provide electrical power to the aircraft. Aircraft also have heating and cooling systems that provide warm air and cold air to different parts of the aircraft. You would be working on those systems. Basicly you job is to do scheduled functional checks of the systems, to make sure they work, to repair any problems found found, replace faulty equipment in the aircraft.
Q:for example, a 3ds?
There is a video on youtube of how to take apart a 3ds. This might make you void your warranty.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords