Electric FORKLIFT for sale FD20 from CNBM

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Details

Condition: New

Place of Origin: Shandong, China (Mainland)

Brand Name: CMAX

Model Number: FD20

Power Souce: Diesel Engine

Rated Loading Capacity: 2.0-2.5t

Max. Lifting Height: 4030

Min. Lifting Height: 1150

Fork Width: 1150

Overall Dimensions: 1070*122*40

Certification: CE

After-sales Service Provided: Engineers available to service machinery overseas

Product Name: Electric forklift

Delivery:Within 3 weekes


Electric FORKLIFT for sale FD20 from CNBM


Electric FORKLIFT for sale FD20


Electric FORKLIFT for sale FD20 from CNBM

Electric FORKLIFT for sale FD20 from CNBM

Electric FORKLIFT for sale FD20 from CNBM

Electric FORKLIFT for sale FD20 from CNBM

Electric FORKLIFT for sale FD20 from CNBM

Electric FORKLIFT for sale FD20 from CNBM


Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (20-40 days after receiving deposit)

Reliable performance

Easy and smooth operation

High safety.

·    Professional Service

·    Competitive pricing

 

Q1: How soon can we receive the goods after purchase?

A1: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

 

 

Q2: How to make a quick resolution for after service?

A2: OKorder and our manufacture both have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.

 

 

Q3: How do we guarantee the quality?

A3: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The Tom Smith Corporation has the following items: Cash, $5,000; Machinery, $50,000; Building, $150,000; Note?
Cash, $5,000 Machinery, $50,000 Building, $150,000 Savings, $10,000 Accounts receivable, $30,000 Inventory, $10,000 Land $50,000 - Depreciation Building, $35,000; - Depreciation Machinery, $25,000; = (E) $245,000
Q:I am looking for the name of a piece of machinery.?
Vulcan hammer maybe
Q:Who can introduce the famous domestic machinery enterprises?!
1, Xuzhou Heavy Machinery Co., Ltd. is the largest professional engineering machinery manufacturing enterprises. 2 China's largest mining machinery manufacturer is CITIC Heavy Machinery Company, CITIC Heavy Machine, the original Luoyang mining machinery factory.
Q:POLL: would you rather live in a world with TOO MUCH technology, or live a primitive life, without machinery?
Live a primitive life- it's much easier to prevent the crap we create on this earth before it happens than clean it up after we've dumped it everywhere...
Q:From where do manufacturing companies get their sophisticated equipments and machinery? ?
From countries around the world that produce them.
Q:what are different braking mechanisms in heavy earth moving machinery??????
ball joints on the cylinder
Q:i need an article about Jig Boring! anyone can help?
here okorder.com/
Q:If i enlist in the coast guard should i be a machinery technician or storekeeper?
Winechan has zero experience or understanding of how the Coast Guard works - or the military in general. Speaking PURELY of numbers, there are many more MK's in the Coast Guard than there are SK's - so by the NUMBERS, more MK's will be advanced each year than SK's. The PERCENTAGE of people being advanced remain pretty close to the same for all ratings in the Coast Guard, so there really isn't a difference in advancement rates. Don't forget that to go to OCS, you will have to either have a four-year college degree, which is hard to get in the Coast Guard within your first couple of enlistments - OR - you'll have to be at least an E-5, with five years of Time in Service (and be on your second enlistment or later), with at least two years of college. Neither of these programs (regular OCS applications or TEMP commission OCS applications) are forgiving about age and age-related waivers, so make sure you can get the college and be able to apply at LEAST three or more times before you stand any realistic chance of being accepted. I've known folks that applied five and more times (the record I saw was EIGHT times!!) before being accepted to OCS. There is about a 10% chance of being accepted each time you apply... so it isn't easy. The FS officer (Finance and Supply) field is very small - a LOT of the officer-type functions are done by Warrant Officers. Engineering Officers (EO's) are more numerous, but they don't turn wrenches or actually work on machinery. Look at it this way: which field interests you more? Would you rather sit in a warehouse and count beans or be in oily bilges, turning wrenches? Some people LOVE one or the other, and rarely love the idea of BOTH career fields. Brian Raini
Q:i need the jetty construction machinery for jetty construction on the island?
A jetty normally has a piled foundation, so assuming that you have a suitable seabed. Some form of piledriver or water / air jetting device to install the piles. This will depend on their loading requirements. A crane to assist with the decking. For a simple jetty you may be able to use manpower. Some more information about the size of the jetty and its future use would be useful for a more complete answer
Q:Do you know how to operate heavy machinery?
Yes. But I drank NyQuil, so I'm sorry.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range