Elbow for PUTZMEISTER Pump No.1 with OPEN HOLE with high quanlity

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Elbow PUTZMEISTER  No.1 with OPEN HOLE with high quanlity

1.We are a factory which producing concrete pump parts  and we have done many years in the factory with rich experience, the main products include concrete pump pipe, concrete pump elbow, concrete pump reducer pipe, concrete pump flange, piston, rubber hose, sponge cleaning ball, wear plate, cutting ring etc.

2.Our products are Top quality in china which can be used on SCHWING,PM,KYOKUTO,SANY,ZOOMLION

and have been recognized by them.

3.Quality certification of ISO 9001:2000. OEM service available.

 

Specification of pipe elbow:

 

1>Material:ST52,20#steel,45Mn2 or as per to your requirements

 

2>Types:our concrete elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.

 

3>A wide range of specifications for you.

 

Concrete Pump Pipe Elbow

Type

Singe Elbow

Double Elbow

Model

DN125

DN150

DN175

DN125

Material

Casting Steel ,ST52,20# steel,45Mn2

Inside

40Cr

Outside

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45+310

R240*36°

20°Lengthen

R240*36°

20°Lengthen

R240*30°

25°+740

R240*30°

25°+740

R240*15°

40°Zoomlion

R240*15°

40°Zoomlion

R385*29°

R385*29°

R315*33°

R315*33°

Technic

Forged,Casting

Average life

25,000cubic

50,000cubic

Appliciation

Used in concrete transport in construction work.

  

    

 

    

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What factors will be taken into account when selecting the pump chassis?
In the fuel prices continue to rise today, pump fuel consumption is also a factor that customers have to consider.
Q:Building concrete pump is how to bulk cement (concrete) to the high
After the action is completed, the system automatically change the pressure oil into another main cylinder, to complete another different delivery tank suction, send travel.
Q:How much concrete construction is needed for concrete pump construction
The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump.
Q:What are the precautions for the use of concrete car pumps?
Car pumping and pump pumping concrete slumps are generally higher than the dumping of the 30-50, we pump here is generally 150-180, and dumping on the 100-120 or so.
Q:How wide concrete pump truck four support steel feet stretch ?
Take Xugong - pump truck 37 meters 48 meters 52 meters as an example to answer you
Q:Why concrete pump down to play always block the tube
In addition to pay attention to pipeline laying, there are also in the concrete pouring process should also pay attention to a certain amount of concrete slump can not be too large, 120-140mm on it
Q:How the concrete pump truck is fuel tank?
A 90-degree connector and a check valve consisting of a one-way valve. The principle is that when the hydraulic oil is pumped from the cavity of a main cylinder (the active cylinder) the cylinder moves forward and the other side of the piston
Q:Why does concrete pump truck need pipe?
The concrete pipe is used to replace the concrete slurry before the concrete is pumped. It can be quickly dissolved in water at room temperature to form a lubricating film with countless micro-anions so that the surface of the pipe wall is sufficiently lubricated.
Q:How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
Concrete mixing truck, the first charge, should be more two bags of cement.
Q:What is the lubrication of the concrete pump before it is transported to the concrete?
Concrete pump to transport concrete before the pipeline lubrication

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range