• Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 1
  • Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 2
  • Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 3
  • Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 4
Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity

Elbow for PUTZMEISTER Pump No.1 with OPEN HOLE with high quanlity

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Elbow PUTZMEISTER  No.1 with OPEN HOLE with high quanlity

1.We are a factory which producing concrete pump parts  and we have done many years in the factory with rich experience, the main products include concrete pump pipe, concrete pump elbow, concrete pump reducer pipe, concrete pump flange, piston, rubber hose, sponge cleaning ball, wear plate, cutting ring etc.

2.Our products are Top quality in china which can be used on SCHWING,PM,KYOKUTO,SANY,ZOOMLION

and have been recognized by them.

3.Quality certification of ISO 9001:2000. OEM service available.

 

Specification of pipe elbow:

 

1>Material:ST52,20#steel,45Mn2 or as per to your requirements

 

2>Types:our concrete elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.

 

3>A wide range of specifications for you.

 

Concrete Pump Pipe Elbow

Type

Singe Elbow

Double Elbow

Model

DN125

DN150

DN175

DN125

Material

Casting Steel ,ST52,20# steel,45Mn2

Inside

40Cr

Outside

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45+310

R240*36°

20°Lengthen

R240*36°

20°Lengthen

R240*30°

25°+740

R240*30°

25°+740

R240*15°

40°Zoomlion

R240*15°

40°Zoomlion

R385*29°

R385*29°

R315*33°

R315*33°

Technic

Forged,Casting

Average life

25,000cubic

50,000cubic

Appliciation

Used in concrete transport in construction work.

  

    

 

    

 

 

Q:Why concrete pump truck with foreign chassis
But in the pump the most important three components - chassis, pumps and boom, the domestic customers or manufacturers are still more inclined to use imported products.
Q:How to determine the concrete pump truck blocking the site
Pumping system action suddenly interrupted, and there are abnormal sound, the device has a strong vibration, but no corresponding vibration within the pipeline.
Q:Why concrete pump down to play always block the tube
do not for the convenience of the construction to enlarge the slump, down to fight the concrete The greater the slump, the easier it is to block
Q:How wide concrete pump truck four support steel feet stretch ?
Take Xugong - pump truck 37 meters 48 meters 52 meters as an example to answer you
Q:What is the difference between a concrete pump and a valve?
the current domestic production is all S valve series. Now there are special high-grade concrete S-valve pump
Q:What is the difference between a concrete pump and a concrete pump?
Concrete pump "and" concrete pump "are concrete transport machinery, the same use, but the former need to use the car dragging transport and the need for additional stent pipeline, while the latter is the locomotive body, a free stretch of the boom, no pipe
Q:What is the pumpability of concrete
Pumpability' is a qualitative argument that the pumpable concrete slump is generally greater than 160mm, the mortar content can not be too low, the maximum aggregate size does not exceed one-third of the diameter of the pump,
Q:Winter concrete pump pipe Zeyang insulation Yeah?
Depending on the area and the temperature at the time of construction, if the temperature is not too low (such as minus 5 °), available straw bag (or multi-layer sacks) and plastic wrap.
Q:How to prevent concrete pump blockage
Improper operation: the operator to concentrate, to avoid abnormal pressure gauge readings; pumping speed to meet the equipment requirements; pumping more than the amount of material can not be lower than the stirring shaft; Tan degree to control in the 80-230mm; downtime control in 15
Q:How to cooperate with concrete mixers and concrete pump trucks
the site pump has a bucket, mixer car unloading the material in the bucket bucket,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords