EANTE Square wall formwork
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Haiyuan New Material possesses china’s first fully automatic long fiber reinforced thermoplastic composite mould pressing production line with independent intellectual property, referred to as LFT-D line.
Why we developed EANTE formwork?
Superiority:
General worker can assemble and remove easily, save more labor cost.
The reinforcing ribs of EANTE formwork can be used to instead of the steel tube and wood.Preassemble the EANTE formwork in the factory and fix it in the construction location.
The size accuracy of the composite formwork is better than that of the steel formwork and the wooden formwork.The concrete surface cast by EANTE Formwork is quite smooth, without any flaw, and no release agent is appliedto assist the formwork removing.
We developed our own software with the characteristics as follow:
a. Computation time: it depends on the complexity of the architecture drawing;
b. Construction drawing: it is shifted from assembling drawing easily;
c. Material list: the assembling designing software would generate a list of formwork elements and auxiliary products.
Enviromental: EANTE Formwork is made from composite material, which is low carbon, recyclable and environmentfriendly.
Saftness: The labor, large equipment, electric saws and iron nails are used much less on the building site, which leads to simplified on-site management and the safer construction.
- Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
- Should not be less than 160mm, and should not be less than the floor of the high 1/20; bottom reinforced parts of the wall thickness of not less than 200mm, and should not be less than the floor of the high 16/1. Hope to be helpful to you.
- Q:What is the economic benefits of building wood formwork compared to plastic molds?
- The quality of the template is related to the quality of concrete engineering. The key lies in the accurate size, the assembly is firm, the patchwork is tight and the assembly and disassembly is convenient. Should be based on the structure of the form and characteristics of the appropriate form of template, in order to achieve good technical and economic results.
- Q:Plastic building template where there is an urgent need to solve
- First, smooth and smooth. Temporarily stitching the stencil, the surface quality of the concrete structure after the demolding, the finish are more than the technical requirements of the existing water template, no need to plaster twice, the province of materials.
- Q:How does the concrete on the plastic template remove (already glued to the concrete)
- Stupid way, with a little hammer little bit of the beat, out a little less a little bit.
- Q:I heard that there are building aluminum template and plastic template it? Which is better?
- Wood-plastic building templates in the construction works more useful, more affordable, more convenient.
- Q:Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
- The lower the density of the foam board is easier to deform.Crust foam can be changed to coextrusion foam. General cross-linking or blending halogenation and other methods to improve Vicat. Reduce traction override
- Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
- The reason why the use of the template is to use the template template is the accuracy of the template, that is, after the mold can be set to ensure that the finished product finished shape regular, flush. While the plastic film version is not damaged, the completion can achieve this requirement. But the crux of the problem is that the biggest weakness of the plastic film is too brittle. Those who have done the work know that when the demolition of the template, the workers removed the template directly down to throw. And this throw to lead to the plastic film version of the broken, it is very difficult to film in the film. This is also the reason why the plastic film from the interview more than 10 years can not always develop the root causes. And then plastic film board in the mold when it is very strenuous, must drill with a drill, or can not die, not convenient construction. This is also a plastic film version can not become a mainstream template and a fatal weakness. The third weakness is its flammability. Construction site of the steel connections are required welding, welding flowers gradually to the plastic film board, at least in its surface to form a deep pit (or even lead to fire), a direct impact on the finished product surface finish and flatness.
- Q:The price of raw materials can say better, is the PVC material.
- General templates are fixed specifications, such as 1.22 * 2.44,980 * 2200 so it is generally in accordance with each template to price
- Q:Types of building templates? What is the water template?
- With the development of the economy, the emergence of new materials in the building materials industry, the increasing number of types of building classification, there are four types of building templates
- Q:Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
- The general building materials market have to sell, I hope my answer can help you ~
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
EANTE Square wall formwork
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords