DV3 series Trolley Mechanism
- Ref Price:
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Introduction
Such production are independently developed and manufactured by our company based on mature technologies of French Potain Company.It is constitued with torque three-phrase asynchronous motor,build-in planetary reducer, winding drum, rack and other components.The mechanism can get low, medium and high speed by voltage control and eddy current brake.The motor is equipped with an electromagnetic disk brake with features of smooth startup and braking, safe & reliable braking and accurate positioning.
- Q:How much is a team of 40 tower crane
- Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!
- Q:What category is a Crane bird?
- Order GRUIFORMES Family GRUIDAE Not sure where you live...but there are only 2 species of Crane that live in the U.S. : the Sandhill Crane and the endangered Whooping Crane.
- Q:What is the most likely reason that Crane never tells us the lieutenant's name in episode of war?
- The Stephen Crane Society Stephen Crane did not have a middle name. Stephen Crane is buried in ... Would a person be more likely to receive a wound when bravely charging the enemy .... I would be most grateful if you could tell me where I could find this please? .... An Episode of War. How does the facts that the lieutenant is rationing ..
- Q:please help me solve.. i really don't get itttt
- 1 horse power = 746 watt. So the work W done by the crane in 15 s is given by W = 8*746*15 J . So the distance, S through which the crane lifted 100 kg, presumably at constant speed is given by 100*9.81*S = 8*746*15 or S = [(8*746*15)/(100*9.81)] = 91.25 m
- Q:Notice of tower crane
- Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
- Q:I know, do you know?
- They build it on the ground, raise it up with another crane, and then lift the counter weights up!
- Q:Is it to do with visibility?What are some other colours of cranes?
- Here is NZ they are normally yellow
- Q:If so, what time of year?
- I have lived and worked in Lyon and have never seen a crane fly in the built up area of the city, even when they are at their most active, which is in June. There are some that fly about in gardens but in any case they are harmless even though some people are freaked out by the way they fly. It is their grubs, the Leather Jackets, which are hated by gardeners as they are detrimental to lawns.
- Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
- The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame.
- Q:so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
- That is a good answer. Ordinary cranes build the steel frame to a height of perhaps 60 feet. The frame is designed so a specially designed crane can climb up the side (like climbing a ladder) to about 50 feet where the climbing crane can complete the frame to about 100 feet, then the crane can climb to the 90 foot level and build the frame to about 150 feet etc. Another method is the floor at about the 60 foot level is completed and extra strong. A crane is assembled on that floor and can complete the steel frame to about 100 feet where another extra strong floor is built. The crane at 60 feet is then dismantled and moved to the floor at the 100 foot level, or perhaps this is a second crane. Repeat until the full height of the building is frame work. As cranes are removed at the lower levels, more floors can be installed and some of the finishing work done. Either way, you can see why very tall buildings are very expensive. Likely both methods are used for some very large and very tall buildings. Neil
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
Related keywords
You Might Also Like