ductile cast iron prop nut with handle scaffolding

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details




dodular cast iron or ductile cast iron

Surface Finish:

natural or zinc plate


natural colour, white, yellow

Packaging & Delivery

Packaging Detail:in pallet or wooden case or as customer's require
Delivery Detail:15-30 days after receive the deposit


Prop Nut 
1.Spe:dia 48-60mm 
2. Weight: 0.35-2.2kg 
3. Material:cast iron 


Product Description

  Prop Nut

1.Spe:dia 48-60mm 

2. Weight: 0.35-2.2kg 
3. Material:cast iron or Q235
5.Use:for prop adjustable height.

Basic Information

Product/Service (We Sell):Scaffolding,Scaffolding Accessories,jack base,tie rod,Formwork Accessories  

Number of Employees:101 - 200 People  

Trade & Market

Main Markets:South Asia
Western Europe
Eastern Europe
South America
Eastern Asia
Mid East
Southeast Asia

Total Annual Sales Volume:US$2.5 Million - US$5 Million  

Export Percentage:71% - 80%  
Number of R&D Staff:Less than 5 People  

Number of QC Staff:5 - 10 People  

Management Certification:ISO9001  

Contract Manufacturing:OEM Service Offered   Buyer Label Offered

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:The construction scheme of high rise and external cantilever scaffold!
(2): Fastener fastener should comply with the "steel pipe scaffolding fasteners" (GB15831 1995). The provisions of fastener can't crack, porosity, trachoma and other casting defects. Surface fastener and steel tube to contact good fastener clamping steel pipe, the minimum distance of the opening should be less than 5mm.(3) the foot board; steel foot plate generally with thick 2mm steel plate, and the table has a uniform distribution of anti slip hole, board length 2~4m, width 250mm of fir or pine, board length 3~6m, width not less than 150mm.
Q:What are the components of a mobile scaffolding
The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
Q:what's the meaning of scaffold?
scaffolding business would refer to building the business up in steps that are connected. A gradual increase, building up from what is already in place.
Q:Exterior wall scaffold construction plan?
Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
Q:How do you calculate the tonnage of scaffolds to use in a project?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:During what month does Hester mount the scaffold in The Scarlet Letter?
Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
Q:how much does a scaffold peircing hurt compaired to a nose piercing?
if you get it done with a gun it doesnt hurt at all but you shouldntget it with a gun cz it can shatter ur cartilage . i dont think it hurts at all i pierece mine all the time i ahve about.. 8 in each ear i did them all myself it doesn hurt me tht bad after woards its tender to the touch tths it tho .aah
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s
Q:What are the dangers of scaffolding
Analysis of the types of scaffolding accidents1) the entire frame dumping or local collapse frame2) the whole frame instability and vertical collapse3) personnel from scaffold falling

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range