Drop Forged 48.3mm Cuplock Scaffolding System CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Drop Forged 48.3mm Cuplock Scaffolding System

  • Type: Heavy Section Steel

  • Forming: Welding Products

  • Standard:GB, ASTM, DIN, JIS, AISI, BS, En74,Bs1139

  • Member:Steel Column

  • Trademark:Quality Carbon Structural Steel and Alloy Structural Steel

  • Connection Form:Welded Connection

  • Carbon Structural Steel:Q235,Q255,Q345

  • Residential Wall Structure:Wall Support

  • Type of Steel For Building Structure:High-Strength Steel

  • Bs1139, En74 Standard:Tube :48.3mmx3.25mm/2.5mm

  • Export Markets:Global






  • Drop Forged 48.3mm Cuplock Scaffolding System CNBM

  • Drop Forged 48.3mm Cuplock Scaffolding System CNBM



  • Drop Forged 48.3mm Cuplock Scaffolding System CNBM

Descriptions of  Drop Forged 48.3mm Cuplock Scaffolding System  

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of  Drop Forged 48.3mm Cuplock Scaffolding System

Multi-functional-with the universal joint and fully interchangeable components, the cuplock system can be used in most construction projects for both formwork and access. It is very versatile and diverse. Use in the shipping industries, oil and gas and aviation industries.
Versatile-Verticals are assembled with horizontals and diagonals using secure fixed cup connections. Its versatility has a distinct advantage to conventional scaffolding methods. A positive & ridged connection of four units is achieved in one single action. The cupock system is very cost effective and can be erected safely and quickly.
Time saving-cuplock scaffold is the solution for temporary structures Performance stages. Small teams can erect it safely and quickly.
Economical-Easily assembled system scaffold saves time and labor costs.
Durable-All components are hot dip galvanized and manufactures to international standard.
Easily Stored-Individual pipe elements can be packed in bundles for easy storage and transportation. For returns, material can be packed in steel racks.

  • The Main Components of  Drop Forged 48.3mm Cuplock Scaffolding System

  • Verticals

  • Description

    Material

    kg/pc

    Article No.

    9'10" Vertical 3.00m

    Q345 φ48.3×3.2

    16.90

    SC1001 3000

    8'2" Vertical 2.50m

    Q345 φ48.3×3.2

    14.20

    SC1001 2500

    6'6" Vertical 2.00m

    Q345 φ48.3×3.2

    11.60

    SC1001 2000

    4'11" Vertical 1.50m

    Q345 φ48.3×3.2

    8.90

    SC1001 1500

    3'3" Vertical 1.00m

    Q345 φ48.3×3.2

    6.20

    SC1001 1000

    1' Vertical 0.50m

    Q345 φ48.3×3.2

    3.50

    SC1001 0500

Horizontals

  • Description

    Material

    kg/pc

    Article No.

    10'0" Horizontal 3.05m

    Q345 φ48.3×3.2

    11.80

    SC1002 3048

    9'0" Horizontal 2.74m

    Q345 φ48.3×3.2

    10.70

    SC1002 2743

    8'2" Horizontal 2.50m

    Q345 φ48.3×3.2

    9.80

    SC1002 2500

    7'0" Horizontal 2.13m

    Q345 φ48.3×3.2

    8.40

    SC1002 2133

    6'6" Horizontal 2.00m

    Q345 φ48.3×3.2

    7.90

    SC1002 2000

    6'0" Horizontal 1.83m

    Q345 φ48.3×3.2

    7.20

    SC1002 1828

    5'11" Horizontal 1.80m

    Q345 φ48.3×3.2

    7.10

    SC1002 1800

    5'0" Horizontal 1.52m

    Q345 φ48.3×3.2

    6.10

    SC1002 1524

    4'11" Horizontal 1.50m

    Q345 φ48.3×3.2

    6.00

    SC1002 1500

    4'1" Horizontal 1.25m

    Q345 φ48.3×3.2

    5.00

    SC1002 1250

    4'0" Horizontal 1.22m

    Q345 φ48.3×3.2

    4.90

    SC1002 1219

    3'6" Horizontal 1.07m

    Q345 φ48.3×3.2

    4.30

    SC1002 1067

    3'3" Horizontal 1.00m

    Q345 φ48.3×3.2

    4.10

    SC1002 1000

    3'0" Horizontal 0.91m

    Q345 φ48.3×3.2

    3.80

    SC1002 0914

    2'11" Horizontal 0.90m

    Q345 φ48.3×3.2

    3.70

    SC1002 0900

    8'0" Horizontal 2.44m

    Q345 φ48.3×3.2

    9.50

    SC1002 2438

    1'10" Horizontal 0.57m

    Q345 φ48.3×3.2

    2.40

    SC1002 0600

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:I Just got an industrial piercing or Scaffold and im worried it might get infected?
sounds like what your doing is fine. just keep it clean that's basically all you can do.
Q:Should you twist and Industrial/Scaffold Piercing?
mine told me to twist it....i twist it like every day haha. nothing bad has happened
Q:How to do an industrial(Scaffold) piercing without a bend in the ear?
This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
Q:Do you have to have a certain ear shape for Industrial/Scaffold Piercings?
your okorder.com/... and they usually cost about 40$
Q:Could someone please tell me a very simple scaffold on writing commentary?
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
The outer hanging scaffold board 12 embedded parts embedded in the crack, because the outer hanging scaffold embedded generally should be buried in the beam, and checking of the beam.
Q:Want to get lip piercing or scaffolding, advice please?
Everyone is different as far as what piercings they think hurt more or less, but based on my own experience, I'd say the scaffolding hurt more by far. Now, I've never had my lower lip pierced, but I had my upper lip area (I used to have angel bites), so I'd image it would have to be similar to the lower lip as far as pain, care, healing. As far as cleaning them, it's like most other piercings, where the best thing for you to use is warm sea salt water. But although everyone's different, the lip is going to be the faster healing of the two I'd say for basically anyone. The scaffolding takes up to a year to fully heal. The lip heals relatively fast;usually anything involving your mouth area heals quicker than other areas of the body-I'm sure you noticed how your tongue healed fast. Or even if you accidentally bite or cut anything involving your mouth, tongue, inside of your cheeks, etc., it heals faster than other areas. As far as the foods other aftercare with it, it is somewhat similar to your tongue in caring for it-just follow your piercer's instructions you'll be fine. Good luck!
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range