Double width aluminum scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Guangdong China (Mainland)


Model Number:
HJ-truss
material:
aluminum 6061-T6
height:
2m to 40m
Loading Capacity:
Max.300KG/ floor
length piece:
2m
hieght piece:
2m
width piece:
1.4m
type:
aluminum scafolding truss with wheels
payment:
TT
delivery time:
5 to 10 dyas after receiving all payment
price:
factory price ,FOB price ,CIF price

Packaging & Delivery

Packaging Detail:bubble packaging or carton packaging
Delivery Detail:within 5-10 dyas after receiving all payment

Specifications

aluminum scaffolding truss 4 wheels
1)Easy dismantie and assemble .
2)carrying tools shall be easy
3)small storage room

Aluminum Scaffolding truss with 4 wheels 2m height to 40m height

Haojin Aluminum Scaffolding

Aluminum Scaffolding are new assorted aerial working production , are developed and inland custumer’s characters , its advantages are light weight , convenience to build , many kinds combination , big platform area , flexible to move .

It Can afford to many people work on the platform at the same time , increase the work efficiency largely , widely used for hotel , office sports ground , theater , hall cinema , construction company and so on , its special toy bricks build style , can meet many kinds complex work conditions .

The rapid aluminum scaffolding accord with Europe HD1004 safety standard , work height range from 2M to 40M , Flexible to assemble , rapid to load and unload , can save cost and easy storage , its light weight , prevent oxidation and fire , easy to maintain .

The Aluminum scaffolidng good point as following :

1,Light weight

It is made of light but firm aviation alluminum alloy so it is easy to assembled, move and keep. And its weight is only one third of the traditional one made of steel, which avoids any damage to the floor.

2,Safe and firm structure

It is a safe and firm platform with all joints tightly engaged. With new cold-work technique of in-expand and out-compress, oer joint is distributed with 4100- 4400 Kg, much stronger than the permitted one with 2100KG. The load of the 12M Double Deck reaches about 500Kg. Each deck can stand the weight of 272Kg and the complete tower of 900Kg

3,Easy assembly and dismantlement

It is of "toy bricks" design,with standard parts. No assembling tools should be needed. An aerial platform of 20M will be assembled by two persons within a short time.

4,Easy transit

It has castors so that it can be moved and locked easily and work at different place.

5,High applicability

It is allowed to be erected on escalators and stairways. And the castors prevent any damage on the marble or wood floor and the lawn. And it is designed for use in confined spaces such as narrow alleyways and corridors. And it can be assembled in many ways.

6,Flexible assembly

It can be designed and assembled according to any operation request of any special maintenance in all working sites.

7,Rust-proof,Corrosion- proof,Maintenance-free

All parts of the ladderspan are anti-oxygenation, with interlocks made by casting of spray pellet, which provides itself a lifespan of 30 years

MeasurementsAluminum Scaffolding have two types :

1. Double Width uprightness climb ladder scaffolding

Double width(135cm)

135cmx200cm

height

2M-40M

Carrying capacity(each floor)

300 kg

Total carrying capacity

900 kg

Material

Aluminum alloy 6082

Thickness

2mm or 3mm

2. Single Width uprightness climb ladder scaffolding

Single width(75cm)

75cmx200cm

height

2M-40M

Carrying capacity(each floor)

272 kg

Total carrying capacity

900 kg

Material

2mm or 3mm

Packing : Standard Export packing by carton


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Made a sniper rifle total length of about 1.5 meters ~ aluminum tube ~ 400 more to buy the sight of the mirror and stent ~ gun dragged with aluminum and screw decoration ~ no
Scaffolding in the span of 4 refers to: full of scaffolding width direction, at least 4 spans, that is, there are five pole (between the two pole between a spender for the sprinkling of the fence, Table 1.2 * 1.2 ~ 0.4 * 0.. the span is 1.2 ~ 0.4m). That is, the vertical and horizontal support frame at least 4 span.
Q:High-rise (30m and above aerial work) Building outside the scaffolding whether to conduct expert demonstration ??
Without the norms, procedures, labor limited technology and technology can become a new technology and new technology. For example, the construction technology, in 20 years ago is a new technology and new technology, is now very mature, with the appropriate technical information, engineering guidance, reverse construction is no longer a new process of new technology. Technology.
Q:Development Trend of Aluminum Alloy Cabinet Industry in Small and Medium - sized Cities
Insulation materials include: extruded polystyrene foam (extruded board), molded polystyrene foam (ordinary foam board), is sprayed foam polyurethane, foam polyurethane insulation board (products), foam glass, foam Concrete (foam mortar), chemical foam cement board, light aggregate insulation concrete (ceramsite concrete, etc
Q:Housing maintenance works wall maintenance, the use of mobile scaffolding, I would like to ask how this scaffolding generally calculate the cost? Thank you
Generally divided into single row scaffolding, double scaffolding and full house scaffolding
Q:Is it better to use an aluminum bracket or a wooden stand?
Construction of the amount of consumption in the fixed amount of corrosion, insulation, insulation works that chapter has polystyrene plastic plate insulation layer, the amount of the child. Labor costs, material costs, management fees, profits are the elements of the composition of the unit price, the formula: Σ labor costs + Σ material costs + Σ mechanical fees + management fees + profits workers (in addition to risk and other content considerations); Labor costs = fixed consumption × labor unit price, material costs = material quota consumption × material price
Q:How to Measure and Calculate the Flexible Pipe Deformation Rate
Perlite is the old craft, and now in the big city with the small, benzene board is the right way, the insulation performance much better than perlite, the same thickness, the insulation properties of benzene board is about 3-5 times the perlite The slag on the roof used to find the slope actually has a certain insulation effect, but not obvious.
Q:Ceiling decoration scaffolding is what material, aluminum alloy material is good?
With the installation is simple, light and efficient light and efficient features And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor The tile is used for the panel for the wall
Q:What is the pros and cons of the cast iron engine and the aluminum alloy engine?
Air conditioning without heating the case, compared to other heating methods, the air conditioning power. When the ambient temperature is 5 degrees or more (the inverter air conditioner is slightly better and can be above ambient temperature -15 degrees) "Air conditioning is the most efficient and consumes about 1000 watts of electricity in all heating products, producing about 3000 watts of heat Power and have a better effect. "If you feel the room cool off, one hour hot and open an hour this will be more costly. Both healthy and energy-saving approach is to reduce the indoor and outdoor temperature difference. In order to set the temperature of the air conditioning, do not be higher than 20 degrees, set the best 17 degrees. Summer set air conditioning cooling temperature, neither less than 26 degrees, and not less than the indoor temperature of 3 to 6 degrees. Such as indoor temperature 30 degrees, set 27 degrees; indoor temperature 35 degrees, set 29 degrees.
Q:Hello, master, I am a water and what do not understand what to learn to do the information, I would like to ask, now the site is only installed galvanized steel pipe and flexible casing,
Easy to aluminum scaffolding adhering to foreign advanced technology sold at home and abroad have invention patents, the appearance of patents, practical patents. Safety standards through the German TUVGS safety certification (aluminum scaffolding the highest level of certification).
Q:Why all the ultra-pole all use aluminum alloy shell?
With foam plate fixed in the greenhouse on the wall from the role of insulation, with mortar paste the paste directly on the wall, probably need 7 ~ ~ 8 bags.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range