Double Drum Static Road Roller 2YJ6x8 for Hornblend, Brokenstone, Asphalt and Concrete Ones

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 PCS
Supply Capability:
100 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

2YJ6x8 Roller is mostly suitable for flattening and compacting surfaces of the gravel, macadam, asphalt and concrete roads.

It can be also used for compacting bases of roads, articulated connection and flexible steering.

It adopted the hydraulic braking, safe and dependable

 

Details

Condition: New

Type: Double Drum Roller

Operating Weight(with load/without load): 8000/6000 kg

Front Gear Load: 242/182 N/cm

Rear Gear Load: 343/257 N/cm

Gradeability: 20%

Turning Ability(inder side/outter side): 5050/6450mm

Dimension(L*W*H): 4380mmx1710mmx2560mm

Minimum Ground Clearance: 240mm

Diesel Power/Model: 42 kw/498BG


Main Features

1. Articulated Connection, flexible steering and small turning radius. It adopted hydraulic braking, safe and dependable.

2. The nose of the roller is narrow with an excellent turning sight.

3. A sprinking set is equipped, sprinkling evenly on both front and rear drums.

 

FAQ:

Q1: How to provide the power for the roller?

A1: Diesel.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances for one year.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 20 to 40 workdays.

Q4: Can we produce some Static Roller according to customers request?

A4: Yes, we can produce Static Roller according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Double Drum Static Road Roller 2YJ6x8 for Hornblend, Brokenstone, Asphalt and Concrete Ones

 

Double Drum Static Road Roller 2YJ6x8 for Hornblend, Brokenstone, Asphalt and Concrete Ones

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The role of rubber tyred roller is used for water steady rolling
The soil type compaction, and ensure the smoothness of asphalt concrete pavement, reduce turbine India road; single drumroller is mainly used in the process of earthwork construction of road construction, reinforced earthwork fill compaction.
Q:What is the influence distance of the road roller on the building?
This generally does not affect the house, and if so, leave proof
Q:What are the classifications of road rollers? Who can tell?,
This is your photo paper roller, general classification mainly consists of single drum vibratory roller, rubber roller, three iron roller, double steel roller
Q:What are the working conditions of impact rammer,
The following is the analysis of these equipments for you:Roller: both compacted asphalt and cohesive soil can be used.Flat rammer: sand granular media, such as sand, asphalt (with sprinkler device).Impact rammer: sticky soil, requiring high pressure and solid occasionsDifference between compacting equipment:The roller is compacted by its own weight and exciting force, and the roller is in line with the ground compaction medium.
Q:Where are the rollers attached to the rollers?
There are three. The exact location is as follows:The steel wheel driving speed reducer addition: two is 90 degrees, and put the oil nut, screw it loose, start the engine running, one oil discharge outlet vertical reducer gear oil released after walking again, the two oil outlet of a vertical and a horizontal from the beginning, at the top of the filler filling gear oil, until the level direction of the oil port gear oil out of date. Refueling capacity of about 4.5L.Vibration wheel gear oil additive: three a 120 degree uniform oil adding and discharging port, oil discharge method ibid, to a vertical oil port down oil, after the oil discharge screw on a rotating steel wheel nut, make an oil outlet straight up, another loose oil the mouth slanting down (because the three port is 120 degrees), from the oil filling port gear oil, until the oil port oblique gear oil out of date. Refueling capacity of about 11.5L.After oil addition: gear reducer bridge observation hole loosen nut central, loosen the direction by the reducer and put the oil nut oil (rear axle oil adding and discharging nut good judgment, nut at the top of a concave circular), and then go nuts loosen upper, middle gear oil to observe the outflow of oil can. Refueling capacity of about 18L.
Q:May I ask who knows the vibration Shantui 22 tons roller much money, thank you
Are you going to buy it?! If you want to buy I can help you ask, my home is in Jining City, my friend in mountain plant, and can be a lot of money.
Q:Cement layer construction, do not roller compaction, OK?
Second, if the road cement stabilized base, it must be roller compaction, otherwise the water stability layer can not reach the required density and intensity.
Q:The difference between tracked roller and wheel roller
The steel roller will surely be much heavier than the steel tube roller
Q:XCMG vibratory rollerWhat is the left most light of the vibratory roller?
This is the failure lights, according to the situation you say there should be several possibilities: oil filter clogging, filter clogging, pressure sensor failure or blockage in oil, oil pump does not turn you find instructions have introduced one by one investigation
Q:How much is the rent for XCMG 303 tire roller?
Be proficient in loose work and live on site! Hanging broken cable, pipe into the mud five times are many, drag up have to overhaul the new crane to be scrapped in three months, the crane is now looking for a long-term stability of more than 30 tons, required Baochibaozhu package hit penicillin, more than 8000 monthly wages, wages, the boss finds the boss beautiful open

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range