DN32mm PVC Pipe for Water Supply on Sale

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 m.t.
Supply Capability:
2000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Specifications

1. Length: 6m, 12m or In compliance to your requests

2. Pipes are available in the form of coils or straight lengths

3. A comprehensive range of pipe fittings are always held in stock.

2.Packaging & Delivery

Packaging Detail:

standard packing for export or as requested

Delivery Detail:

1~5weeks

3.size range

Weight(kg/m)

Weight(kg/m)

Weight(kg/m)

Weight(kg/m)

Wall thickness(mm)

Wall thickness(mm)

PE80

PE80

PE100

PE100

Nominal Outside Diameter(mm)

SDR17.6

SDR11

SDR17.6

SDR11

SDR17.6 

SDR11 

20

2.3

3.0

0.132

0.163

0.133

0.164

25

2.3

3.0

0.170

0.211

0.171

0.212

32

2.3

3.0

0.222

0.278

0.224

0.279

40

2.3

3.7

0.283

0.430

0.284

0.432

50

2.9

4.6

0.438

0.666

0.440

0.670

63

3.6

5.8

0.686

1.053

0.689

1.058

75

4.3

6.8

0.975

1.470

0.980

1.478

90

5.2

8.2

1.411

2.130

1.419

2.141

110

6.3

10.0

2.084

3.159

2.095

3.176

125

7.1

11.4

2.670

4.098

2.684

4.120

140

8.0

12.7

3.347

5.108

3.364

5.135

160

9.1

14.6

4.368

6.705

4.391

6.740

180

10.3

16.4

5.549

8.474

5.578

8.519

200

11.4

18.2

6.817

10.451

6.853

10.505

225

12.8

20.5

8.596

13.228

8.641

13.298

250

14.2

22.7

10.611

16.268

10.666

16.354

280

15.9

25.4

13.274

20.396

13.343

20.502

315

17.9

28.6

16.804

25.818

16.892

25.953

355

20.2

32.3

21.398

32.861

21.510

33.033

400

22.8

36.4 

27.164 

41.706

27.306

41.924

450

25.6

40.9 

34.320 

52.688

34.499

52.964

500

28.4 

45.5 

42.311 

65.135

42.533

65.476

560

31.9 

50.9 

53.169

81.583

53.447

82.010

630

35.8

57.3 

67.134

103.347

67.486

103.888

 4.size range (water pipe)

Pipe series

Pipe series

Pipe series

Pipe series

Pipe series

Pipe series

SDR11

SDR13.6

SDR17

SDR21

SDR26

SDR33

Nominal pressure(bar)

Nominal pressure(bar)

Nominal pressure(bar)

Nominal pressure(bar)

Nominal pressure(bar)

Nominal pressure(bar)

PE80 

PN12.5

PN10

PN8

PN6

PN4 

PE100

PN16

PN12.5

PN10

PN8

PN6 

Nominal Outside Diameter(mm)

Wall thickness(mm)

Wall thickness(mm)

Wall thickness(mm)

Wall thickness(mm)

Wall thickness(mm)

Wall thickness(mm)

20

2.3

25

2.3

32

3.0

40

3.7

50

4.6

63

5.8

4.7

75

6.8

5.6

4.5

90

8.2

6.7

5.4

4.3

110

10.0

8.1

6.6

5.3

4.2

125

11.4

9.2

7.4

6.0

4.8

140

12.7

10.3

8.3

6.7

5.4

4.3

160

14.6

11.8

9.5

7.7

6.2

4.9

180

16.4

13.3

10.7

8.6

6.9

5.5

200

18.2

14.7

11.9

9.6

7.7

6.2

225

20.5

16.6

13.4

10.8

8.6

6.9

250

22.7

18.4

14.8

11.9

9.6

7.7

280

25.4

20.6

16.6

13.4

10.7

8.6

315

28.6

23.2

18.7

15.0

12.1

9.7

355

32.2

26.1

21.1

16.9

13.6

10.9

400

36.3

29.4

23.7

19.1

15.3

12.3

450

40.9

33.1

26.7

21.5

17.2

13.8

500

45.4

36.8

29.7

23.9

19.1

15.3

560

50.8

41.2

33.2

26.7

21.4

17.2

630

57.2

46.3

37.4

30.0

24.1

19.3

710

52.2

42.1

33.9

27.2

21.8

800

58.8

47.4

38.1

30.6

24.5

 

5.FAQ

 

Q:What the Raw material?

A:We use 100%Korea material.

 

Q:What is you MOQ?

A:As customer’s request.

 

Q:What is the production ability? or delivery time?

A:Our production ability support 40HQ order finish in one week.

 

Q:What is the regular shipping port?

A:Tianjin or Shanghai.

 

Q:What is your payment?

A:TT or CC.

 

Q:Can we have sample?

A:Sample free, freight cost you.

 

Q:For urgently doubts,who online?

A:Sales and marketing Manager 24hours online service.

 

 

DN32mm PVC Pipe for Water Supply on Sale

DN32mm PVC Pipe for Water Supply on Sale

DN32mm PVC Pipe for Water Supply on Sale

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:i plan on getting a syrain hamster are critter trail cages safe for them with tubes?
Well, I have a syrian hamster and he has a Habitrail Ovo Studio. The tubes are bigger than the Crittertails and he walks through the tubes without even touching them. it was an expensive cage, but definatly worth it
Q:How can plastic pipes be connected to steel valves?
Valve such as flange valve, then PVC-U pipe and valve connection should be flange connection. Connecting with the plastic pipe and flange with flange bonding, also can use hemmed or band.(2) connect the PP-R tube and the valve threaded valve valves such as: 1) is, should use external thread transition joints, the transition joints at one end of the external thread, the other end is connected with hot melt socket PP-R plastic pipe.2) the valve, such as the external thread valve, should use the internal thread transition joint, one end of the transition joint is internally threaded, and the other end is a socket which can be connected with the PP-R plastic pipe by hot melting.3) valve, such as flange valve, then PP-R pipe and valve connection should be flange connection. Connecting with the plastic pipe and flange can be used hot melt connection, flange can be used hemmed or band.(4) PE pipe, PB pipe and valve connection, method with PP-R tube.(5) the connection of PVC-C pipe, ABS pipe and valve, the way is the same as the PVC-U pipe.(6) PE-X pipe, PAP pipe, these two types of tubes, pipe specifications smaller, the pipe connection is card sleeve connection and compression connection, and the valve should be used to clamp or clamp sleeve transition joint.
Q:How to measure the ends of a building with a transparent hose?
In construction, a transparent plastic pipe, that is, a horizontal tube, is measured by means of the connecting pipe
Q:Does the PVC-U drain plastic pipe need to be fabricated and installed?
PVC-U plastic drainage tube placement should be calculated or not should be laying pipe support method, pipe diameter and special credentials resettlement environment and position to determine the situation: 1, laying underground drainage pipeline laying is not needed to calculate; includes 2 stent drainage pipeline, resettlement quota items should not be calculated. 3, debugging, placement, stability methods, such as integrated pipe laying, drainage pipe support or hanger, need to extend the distance of the support and hanger should be converted to increase.
Q:What is this tube for?
Its a spraybar oxygenates the water it goes on the part the water comes out from
Q:what does the 1/4 plastic tube running from the cold water tap into the cement floor in the basement do?
1/4 plastic tubes are usually for icemakers in refrigerators-freeezers. Where is it trickling to?
Q:Tube in vein.? :/ scared shitless..?
okay, the needle will enter your vein. once the needle is in place, a very very very small plastic and bendy tube is pushed through the needle into your arm, and the needle is removed and leaves the tube (catheter) in. you cannot feel when the tube is in your vein. the only thing you will feel is the needle. they are quick about administering drugs, so you will be knocked out quickly and will not really care about a teeny tiny tube in your vein. it'll be okay!!! have them show you the catheter tube, and you will see that it is actually smaller than the needle they put into you!
Q:When you rub a plastic tube with a fur or a wool cloth, the rubber tube becomes negatively charged.?
while something is rubbed with something else what comes into play is Frictional electrical energy . there is something called the paintings function it fairly is the minimum potential required via the electrons on the exterior to circulate away it . So if Fur and rubber are rubbed in accordance to the ques rubber rod will become negatively charged hence fur might desire to be dropping electrons hence , btw utilising molecules doesnt appear as if a stable theory to me so , in accordance to me C is the final answer .
Q:do i need a split loom tubing for a 0 gauge power wire?
I'd protect it further - Especially if it goes thru sheet metal or outside the passenger compartment. I've run power feed wire thru plastic tubing, when it is under the body, just to be safe.
Q:my oil paint tubes are leaking?
Take a small piece of Suran wrap or thin plastic wrap and put it over the top first before you put the cap back on that will help prevent it from leaking

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range