DLT900typr Rail-mounted Gantry Crane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Work class:A3

Use Level:M4

Rated lifting capacity:2 x 450 t

Span:38 - 45m

Lifting height:9 - 13m

Wheel pressure of cart:18-22t

Lifting speed:0 — 0.5m/min (heavy load)  

0 — 1.0 m/min (no load)

Running speed of cart:0 — 0.5m/min (heavy load)  

0 — 1.0 m/min (no load)

Allowable wind pressure:Operating mode: 250N/ m2

                                non-operating mode: 800N/ m2

Operational power supply:50Hz, 380V

Engine Power:280Kw

Overall Weight::450t – 520t


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The concrete mixer has the fittings
Concrete mixer points generally mixer and forced mixer, currently used in engineering is forced, the difference is that the former is the shell in turn, the latter is in inside agitation. The most commonly used parts of a strong mixer are: hoisting bucket wheel, mixing arm, blade, hopper limiter, liner. Normally the mixing arm, blade, and lining plate for the vulnerable parts, should be replaced in time during construction.
Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
5 kinds of circumstances. 1: the height of the elevator guide frame is less than 70 meters, and the vertical deviation should not be greater than one in 1000 of the height of the guide frame. (assuming the rail frame is 70 meters high, the deviation cannot be greater than 70mm) 2: the rail frame is greater than 70 meters and is less than 100 meters, and the deviation is less than or equal to 70 mm. 3: the guide frame is larger than 100 meters and is less than 150 meters. The deviation is less than or equal to 90 mm. 4: the guide frame is larger than 150 meters is less than or equal to 200 meters. The deviation is less than or equal to 110 mm. 5: the guide frame is greater than 200 meters, and the deviation is less than 130 mm. This is based on the requirement of 5.2.2.1 from GB10054 to 2005. (it used to be a direct copy.)
Q:The main components of a mixing station
The concrete mixing station consists mainly of five major systems, such as mixing main, material conveying system, material weighing system, material storage system and control system.
Q:What raw materials and equipment do you need for your own admixture?
The admixture of concrete mixing station using a lot of more phyletic, the effect is different also, early strength agent, retarder, water reducing agent, and release agent, antifreeze, etc., which is a kind of do not know you to call. The admixtures are usually made by professional manufacturers, and the ingredients are not the same.
Q:How does the construction elevator add up
With the popularity of construction lifter to use, but knowledge of the user of this kind of special equipment, and makes the construction lifter in use process safety accident frequency is higher and higher, it is necessary to everyone together to discuss how to eliminate the safety hidden trouble as possible. This paper makes a concrete analysis on the use of the construction elevator during the use of the elevator.
Q:Why is the construction elevator open on one side and the other on the other
Open the door, commonly known as the feed door, usually open up, and add weights to both sides. Only if the construction ladder stops at the bottom. If the door is double open, the room must be left with half a door (> 1.3 m) to open the door completely. If it is a single open door that opens up, you can save space in the cage. Double door, namely, two doors, either up or down, the two doors balance weight. It usually arrives on the required floor. There is enough room for double doors.
Q:How many floors do you need to install a construction elevator?
In this case, you do not need to install the construction elevator at the main stage. After the main body is finished, install the tower crane, reinstall, mainly for decorate the vertical transport of the stage.
Q:How much water does a concrete mixer use every day?
Dosage, depending on your project and mixing station construction factory cleaning every day, because now the country's love the strict monitoring of environmental protection, to maintain clean our factory, is a lot of water to clean the work area. So the client had better prepare the pool to ensure the normal operation of the project.
Q:What is the difference between the concrete after the concrete pouring and the mixing of concrete
The uniformity, mixing degree and solubility of mixing are not equal to the stirring of mixer. In the same case, the firmness and hardness are smaller than the machine stirring. And the person's individual factors (such as mixing, longer or harder some stirring strength in front of the foot, etc.) also make the mixing of concrete quality difference is bigger, at the same time, the problem of casting after more, likely a pillar of several kinds of compactness and hardness.
Q:What are the pros and cons of a concrete mixer?
The noise is very large when mixing and feed, the installation is more trouble, the use of the dust is very large, the accident, the concrete mixing and the uniform time is not easy to control

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range