Dip Painted Steel H Frame Scaffolding good quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Brand Name:

 Scaffolding

Model Number:

 Scaffolding



Material:

Q235 carbon steel pipe

Certifications:

SGS; BV; SONCAP; Local Test Report

Surface Finishment:


Application:

suitable for internal and external construction

Working Height:

0-80m

Colors:

Orange, blue, dark red, or as you required

Main Tube Thickness:

2.0/2.2mm

Main Tube Diameter:

42mm

Technique:

CO2 arc welding

Packaging & Delivery

Packaging Detail:1.Packing Method: Without outer packing. 2.Loading Capacity: for HF 1930:200 sets per 20 GP; 550 sets per 40 HQ. For HF 1700: 250 sets per 20 GP; 600 sets per 40 HQ. Need more information about packaging details, please contact us directly!
Delivery Detail:15 days after the deposit

Specifications

1.Material: Q235 steel pipe 
2.Surface treatment: dip painted 
3.Light weight; wholesale price 
4.Factory

 

Product Description

 Light duty; Easy to move; The cheapest scaffolding type

 

1. A standard set of H frame scaffolding system is usually has 2 pieces of welded main frames, 2 pairs of cross braces, and 4 pieces of joint pins.

2. H frame scaffolding  is suitable for supporting the beam, the concrete slab with U Head Jack, and outside decoration.

3. H frame scaffolding is also a type of mobile scaffolding. You can install caster wheels at the bottom of H frame scaffolding, then it can be moved here and there.

4. H frame scaffolding is a kind of light duty scaffolding and is easy for moving.

5. H frame scaffolding are dip painted which means that both the inside and outside of the frame scaffolding can be painted to against rust and corrosion.

6. We can provide the H frame type and the ladder frame type for you.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I want to know the classification of scaffolding in the building
Material division according to bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.
Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
An overhanging canopy should be the pillars of the non overhanging balcony canopy may be concave balcony, may also be the pillars of support (pretty much before the home house) pick style balcony canopy should be the cantilevered balcony canopy is not that direct pick out in the post
Q:Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.
Q:Having problems with my scaffold/industrial piercing?
have a piercer look at it.
Q:How to calculate the rental price of portal scaffolding
Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:Is my scaffold piercing infected?
It's irritated. If it was infected, it would be oozing green or yellow gunk:) If it gets to that point, go to the doctor. Until then, just treat is regularly with salt solution:) Hope this helped!
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Foot plate:(1) scaffold with welded steel sheet with 18# wire fence, bundled in the bar.(2) steel bar appear off, the serious corrosion of the prohibition of the use of.(3) the wire binding must use 18# wire binding, and each steel bar binding plate must be above 4
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range