Dimple Composite Geomembrane, High Quality, Competitive Price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
900000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description

EltMembrane-CDG series of geomembrane is manufactured from High Density Polyethylene resins. Produced by extruding plastic sheet into dimple shape.These dimples,in spatial structure with certain height. Can resist long-term high pressure without deformation. On the top of the dimples, there is filtration geotextile to make sure the drainage channel ruing well without any block for any articles. For example,filling particles or concrete.

 

 Advantages

  • 1. strong viscosity, cold pressing sensitive

  • 2. color white/black

  • 3. accurate size cutting

  • 4. custom size offered without any surcharge

 Application

       1, Municipal projects

      2,Landfill treatment projects

      3,Waste water treatment

      4,Mineral waterproofing



 


                                             Composite Dimple geomembrane
NO.Item NameTechnical requirements
H10-1.0H20-1.0H10-1.5H20-1.5H10-2.0H20-2.0
1Tensile strength N/<5cm>         ≥400400500500700700
2Elongation at break %           ≥200200300300400400
3Dimensional strength Mpa     ≥400320450370500420
4Dimensional stability %±2
5Low tempreture impact brittle property-35℃ crack-free bending
6Longitudinal flow capacity cm3/s( hydraulic pressure 5Kpa)5.68.65.68.65.68.6
7Longitudinal flow capacity cm3/s( hydraulic pressure 350Kpa)15.218.215.218.215.218.2







Dimple Composite Geomembrane, High Quality, Competitive Price

Dimple Composite Geomembrane, High Quality, Competitive Price

Dimple Composite Geomembrane, High Quality, Competitive Price


Dimple Composite Geomembrane, High Quality, Competitive Price

FAQ

1. How about the delivery time?   

Lead time since receipt of 30% T/T deposit payment: 3 weeks.  


2. What kind of payments does jenor support?  

T/T, L/C, Cash are accepted.


3. What's are the MOQ?  

We can according to your condition to set the MOQ.

And we can provide you samples for quality inspection.


4. Do you charge for the samples?  

  Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee If you set the order .


5. Can you produce the product according to customers' requirements ?   

 Sure, we are professional manufacturer, OEM and ODM are both welcome.


6. Can you tell me your main customers?   

   That's our customers' privacy, we should protect their information.    At the same time, please rest assured that your information is also safe here.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to deal with oil slick on fish tank?
Oil slick processing methods: 1. Using the oil slick processor to make the oil slick into the filter, and then using the filtering cotton in the filter to adsorb, at last decomposing bacteria by nitrobacterium. 2.Collect oil slick in the cup slowly and then dump it. 3. Use oil-absorbing sheet to absorb, put an oil-absorbing sheet at the opposite corner(oil-slick aggregated area) of water outlet to absorb oil slick. 4. Install trumpet funnel commingler to absorb oil slick, mix it with water, and it will be decomposed through absorption by filtering cotton. 5. pump up the planted aquarium at night after lights off 6. Remove contamination in the filter.
Q:What types of work does geomembrane welding belong to?
It should be a plastic welder
Q:what is the role that Imported HDPE geomembrane plays in impermeable reservoir bottom system in the landfill.
Basically no use.
Q:What concrete acceptance criteria?
Usually standard curing time for a 28-day delivery, three days ahead of time can not be more than 28 days, or to rebound, count overage of the same curing condition at 600 ° or more, usually from the day of pounding the concrete when the temperature began to accumulate scene, it can go up to 600 degrees sent. Condition number of days with not less than 14 days and not more than 90 days. The following is a sample batch project the number of samples per test block 1. Concrete Compressive mixing 100 and not more than 100m3 of concrete mix with less than 1 second 2. Each work shift mixing of the concrete mix with less than 100 3. when at least once a continuous casting played 1000m3, the same mix of concrete not less than once every 4 200m3 each floor, the same mix of concrete not less than once every 5 Pile Concrete pouring 50m3, smaller than 50m3 of piles, each pile must have a group of not less than 1 6. each batch of concrete form removal test at least one group of diaphragm wall 7. the excavation, each 50m3 each groove section or not less than 1 8. ground engineering construction of concrete test blocks for each layer (inspection Lot) per 1000m2 sampling of not less than 1, each additional 1000m2 shall be taken by 1, by less than 1000m2 1000m2 meter. When changing the mixing ratio, a corresponding increase in the sampling frequency and the first use of concrete mix opening identifying at least one group
Q:Landfill geomembrane safety rules.
Q:Is the plastic wrap toxic?
It depends. Healthy application method of the preservative film. Warm reminder: Most of the cooked food in the supermarket is wrapped with a layer of preservative film, and many consumers think it is a protective film and directly put the food in the refrigerator when going back home. In fact, its preservative film should be torn off before storing. When consumers go back home, they should tear off the preservative film, wrap the food with freshness protection package and then put the food into the refrigerator; they can also store food in the covered ceramic containers; if the container have no cover, when cover it with preservative film, try not to put into too much food to prevent the food from contacting with the preservative film. Finally, I want to remind you that when the food is hot, do not cover it with plastic wrap, because that will increase the loss of vitamins in food. It is best to wait until the food is cooled completely before using the preservative film.
Q:How to tear down polarizing film from display?
The steps of polarizer replacement: 1. Tear down the old polarizer. Problems: It requires specialized equipment, because it needs large and even force, and it can not be completed by hands. 2. adhesive residue cleaning of glass surface. Problems: It needs professional cleanser, and the adhesive residue must be clean up. 3. Stick the new polarizing plate.
Q:How to construct and weld hdpe high density polyethylene sheet material?
Start motor. 9mm × 0. Welding can't be done under the condition of large sand. Set temperature. Peel on the scene. Welding is in progress. Use welding rod that has the same quality as raw material. Under the condition that geomembrane length is not enough: Adjust the pressure and need atitudinal joint. When HDPE geomembrane is paved, taking protective measures is exceptional according to the temperature change in the lacal area and performance requirements of HDPE geomembrane. The welding machine is used in the welding of HDPE seepage-proof film. 3mm sample is needed during the welding of heat carve welder. 3. Dew should use squeezing-mode hot melting welding machine. Whether HDPE is what you said HDPE high density polyethylene board material. Pay attention to the operation condition of welding machine at any time. When the welding is started every day, use dual-track sweat soldering. 9. Beauty. Dart is not allowed to appear during the welding of film. Set speed://dlyamaxun.com/ shear test, set aside telescopic deformation resulting from the changes of temperature, do not cross. After the sample is qualified, temperature is lower than 5℃. 4. During the raining days or under the condition that humidity, dust and pressure exist at seam, welding line requires tidiness and lap joint check of welding line. 1. Moisture condensation. Oil pollution is not allowed at seam. The voltage stabilizer must be used. The test weld should be done on the scene, then re-weld with stitching in longitudinal direction. Sundries like sediment are not allowed in the lapping section of HDPE seepage-proof film. Use the speed that is adjusted before. Under special circumstances, when local electricity is used and sundries exist, clear before welding://dlyamaxun. The welding process of heat carve welder is divided into. The following is the construction welding of HDPE seepage-proof film. 2.7
Q:What is the temperature of PET high temperature resistant film?
high temperature resistant polyester film. It has excellent physical properties, chemical properties and dimensional stability, light transmittance and can be recycled. Cold resistance (--70 degrees), heat resistant ( 200 degrees), and has the good characteristics of corrosion resistance and shrinkage stability. High temperature resistance performance of protective films varies with the material of the film. PE electrostatic film is generally resistant to temperature of 60 degrees. PE high temperature resistant plastic is generally resistant to temperature of 120 degrees, and PET is 60 degrees -230 degrees theoretically, the actual situation remains to be customized and tested.
Q:What is the material of the installation technology of soft membrane?
The smallpox of soft film is a new type of smallpox material, characterized by various shapes, rich colors, fire prevention, and environmental protection. The main component is special poly (vinyl chloride made, completed by special keel edge). It is applicable in indoor decoration.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range