Diesel Best Cold Rolled Steel Coil JIS G 3302

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
45645 unit
Supply Capability:
64546 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Cold Rolled Steel Description:

The raw material of cold rolled steel coil/sheet is high quality hot rolled product, and after pickling continuous rolling, degreasing, annealing,skin pass,slitting and cut to length line etc. Along with it many kinds of new  technology and new process of global cold rolling production have been applied. Therefore the quality of the goods could be guaranteed. The product is widely used in outdoor and interior decoration, furnishing manufacturing, home appliance, automobile etc. 

2.Main Features of the Cold Rolled Steel

• Excellent process capability

• Smooth and flat surface

• Workability, durability 

• Excellent heat resistance performance

 High strength

 Good formability

• Good visual effect

 

3.Cold Rolled Steel Images

Diesel Best Cold Rolled Steel Coil JIS G 3302

4.Cold Rolled Steel Specification

Standard:AISI,ASTM,DIN,GB,JIS,JIS G3302 ASTM 653M EN10142

Grade: Q195~Q345

Thickness: 0.16mm~1.5mm,0.16-1.5mm

Width: 1250,600-1250mm

Coil weight:3-12 MT

Coil ID:508/610mm

Chemical composition:

C

Si

Mn

Cr

Ni

P

S

0.150

0.476

11.231

12.50

0.900

0.039

0.010

 

5.FAQ of Cold Rolled Steel 

We have organized several common questions for our clients,may help you sincerely: 

1.How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customers requirements.

2.How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

3. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyers advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how is calculated depriciation rate in particular machinery machinery value Rs.450000/-SLM pls salve this prob
The straight line method of depreciation says there will be a set amount of depreciation each year. For this problem we will need to know what the starting value is, what the residual value is (the lowest amount it can get to) and how many years the machinery will be in use. I am not sure what the $450K is, starting or residual, but lets suppose it is starting, with a residual value of 0 and a 9 year life. (Starting Value - Residual Value) / Life = SLM Depreciation per year. (450,000-0)/9 = $50,000 The residual value tells you that the machinery cannot be depreciated less than 0.
Q:who knows of modern machinery for jewelry?
I would ask a jeweler.
Q:Gardening Machinery Question?
Hello I'm new at this and I really an not sure what I am going to suggest will even work. Do you think a tiller will work? Or maybe one of those tractor things with the scoop on the front? My brother came through over with one and went through my overgrown wooded area to make a beautiful path for me to be able to use for walks. I was able to walk around that trail same day! He was able to take out the vegetation close to the ground too. The ground was rough and muddy when he was done but I don't think there's a way to prevent rough ground when digging. Chances are you will be able to get out there with a shovel afterwards to break things up or like me turn the grass upside down to die. If you rent one it shouldn't cost too much. It's also fun to work with those thing. Is it your plan to replant? Do you add any manure and compost to your ground. I've sprayed and then cut grass short before when I wanted to make a garden. I created raised beds by putting the manure compost, topsoil and pearlite on top of the dead grass. A few longer blades stuck out but they were very dead. I grew my best garden ever that year! Plus it was so easy. I was very pleasantly surprised by the result! I can't promise it will work as well for you though. That's all I can think of though. Thank you for taking the time to read my answer. Jeannie
Q:Would a digital clock count as...?
Machinery.
Q:What type of machinery is used to dig tunnels for roads underneath fjords?
I've spent many nights in the bed thinking of ways to escape eery or dangerous places. If it's on an island, I know they won't let me take the ferry, so I would have to beat up the captian, and ride out of their on the boat. I would probably go over the fence as well, because a tunnel will take a life time!
Q:History of Chinese machinery development
China in about 40 to 500 thousand years ago, there have been processing crude scraperschoppers and three prismatic tip like device primitive tools. 4~5 years ago appeared grinding technology, many stone tools have been relatively smooth, blade is also sharp, and has a single edge, double blade, convex blade, concave blade and round blade of the points.
Q:which industries use high tech machinery?
Farming industry. And timber.
Q:How can we fly without using heavy machinery?
Tall building. Only works once.
Q:What are the differences between diesel engines used in construction machinery and diesel engines for automobiles?
3, the difference between the structure and the use of gasoline is also large, such as: big fan, exhaust pipe into the flywheel and connecting device. The big water tank. The car engine running in high speed multi zone, and engineering machinery often running in the maximum torque speed. So feel engineering machinery engine strong. Oil requirements than the car.
Q:when is the next machinery handbook due to be released? 30th edition I believe.?
It looks like every four years so approximately around the end of this year is my guess after looking at the dates the others were published.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range