Dia.22mm Formwork butterfly wing nut

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Standard:
ISO
Material:
dodular cast iron or ductile cast iron
Surface Finish:
natural or zinc plate
Colour:
natural colour, white, yellow
Formwork Accessories:
suitable for dia 15/17mm tie rod

Packaging & Delivery

Packaging Detail:in pallet or wooden case or as customer's require
Delivery Detail:15-30 days after receive the deposit

Specifications

1.Surface: galvanized
2.Material: steel
3.Produced in our own factory.
4.Samples are available
5.Tensile strength

Product Description

Formwork  galvanized Wing nut

Details of wing nut

1.Surface:  galvanized


2.Material: steel


3.Produced in our own factory


4.Samples are available


5.Tensile strength

Our Services
  1. Your enquiry will be replied within 24hours.

  2. Well-trained and experienced staffs are prepared to answer all your questions professionally, in English of course.

  3. Working time: 8:30am - 5:30pm, Monday to Friday.

  4. The business relationship between us is totally confidential in any circumstances.

  5. We offer the great after-sales service, contact us in time if you have any questions.  

  6. We are looking forward to long term cooperation relationships,email us if you are interested.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.
Q:On what page of The Scarlet Letter does Hester enter the scaffold?
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:What are scaffold spanners used for?
Ratchet Podger Spanners...Aluminium Scaff Spanners Spanners are wide wrenches that are made from durable metals. Spanners are made specifically for scaffolding and are designed to fit into the tool belt nicely. Spanners are very useful for a number of jobs and are often used along with other scaffold tools on a safety lanyard to prevent dropping the tool to the street below. Spanners work the same as traditional wrenches but like many scaffolding tools are made with a hole in the end of the wrench for the safety strap to be inserted through. Stainless steel and aluminum are the most commonly used metals for spanners to ensure durability even if the item is dropped from high.
Q:What Music Video did Garth Brooks Run Around Crazy on Stage, Suspend from The air and Climb the Scaffolding?
it is umm Ain's comin down til the sun comes down
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:I have a contract to paint a six story hotel. Problem the roof has an aluminum skirt. Can scaffolding be used?
A little late to be asking that question if you already have the contract, isn't it?
Q:The role of the external scaffolding and the relevant provisions?
These two functions are often concurrent. With the protection of the role of security, in order to play the role of height operation; can not guarantee the safety of the role, the construction personnel can not operate on the above. These two functions, the protection of human safety is the first. Construction workers in the scaffolding on the construction work, there is a sense of security, construction progress, the quality of the project is sufficient protection, in order to create good economic benefits. Otherwise, once the danger of scaffolding, will cause many casualties, causing significant losses. Therefore, in the development of scaffolding support programs and scaffolding erection, we must firmly grasp the quality.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range